Kim, Hyoungtae;Lee, Sungwoo;Kim, Tae Hyun;Shin, Hansol;Kim, Wook
Journal of Electrical Engineering and Technology
/
v.13
no.6
/
pp.2203-2211
/
2018
Capacity payment mechanism has been adopted as the incentive scheme to achieve resource adequacy in Korean electricity market, however, the level of capacity price has been controversial due to its insufficient extent to incur financial loss for certain generators. Therefore, a new method is proposed to estimate the proper level of capacity price incorporating profitability of market participants and resource adequacy in this paper. The proposed method is successfully applied to test system based on Korean power system.
Kim, Dae-Yong;Lee, Chan-Joo;Lee, Myung-Hwan;Park, Jong-Bae;Shin, Joong-Rin
Proceedings of the KIEE Conference
/
2005.07a
/
pp.819-821
/
2005
Since the System Marginal Price (SMP) is a vital factor to the market entities who intend to maximize the their profit, the short-term marginal price forecasting should be performed correctly. In a electricity market, the short-term trading between the market entities can be generally affected a short-term market price. Therefore, the exact forecasting of SMP can influence on the profit of market participants. This paper presents a methodology of day-ahead SMP foretasting using Autoregressive Integrated Moving Average (ARIMA). To show the efficiency and effectiveness of the proposed method, the numerical studies have been performed using historical data of SMP in 2004.
Park, Jong-Bae;Cho, Ki-Seon;Lee, Ki-Song;Shin, Joong-Rin
Proceedings of the KIEE Conference
/
2001.11b
/
pp.411-413
/
2001
This paper discusses on an optimal bidding strategy of a generator in a competitive electricity spot market using the information of predicted spot price with some assumptions. Optimal bidding strategy of a generator is derived by solving a profit-maximizing optimization problem with a constraint where the forecasted spot price is treated as a constant value. The main advantage of this methodology is that the optimal bidding strategy of each generator can be obtained independently where the gaming characteristics of generators are merged into the forecasted spot price.
Journal of the Korean Association of Geographic Information Studies
/
v.16
no.4
/
pp.91-105
/
2013
This study performed an assessment of wave power potential in the Kangwon and Dongnam regions encompassing the East Sea and part of South Sea. Annual electricity production and economic effects of 28 wave energy converters with 750kW capacity were analyzed using significant wave height and peak wave period data(created from the NOAA's NWW3 model) and InVEST software(developed by Stanford University and University of Minnesota). Annual electricity production was estimated to be up to 1,207MWh/year and at least 163MWh/year. The spatial pattern of annual electricity production showed that the sea far from land has higher wave power potential than the sea near coast. The net present value(NPV) of 28 wave energy converters was calculated by considering an operation period of 25 years. When assuming that the electricity produced from wave energy converters is transferred to onshore power plants through underwater cables, the NPV was estimated to be up to 5,883USD(6,600,000KRW) and at least -63,494USD(-71,000,000KRW). In contrast, the NPV increased up to 28,095 USD(31,600,000KRW) when assuming that the electricity is utilized in the Ulleungdo and Dokdo. In addition, it was found that the break-even line of NPV in the East Sea becomes closer towards the land according to the increment of electricity price. The NPV of wave energy converters near the Ulleungdo and Dokdo will be 88,158 USD(99,000,000KRW) if the increment of electricity price is 100KRW.
Achieving the two goals of providing stable remuneration and promoting market based incentive for generation capacity with only one kind of capacity price is a difficult proposition. This paper suggests a market design in which two different kinds of capacity prices are used to achieve these goals. It maintains the current capacity price that is determined administratively based on the fixed cost of the gas-turbine generator. A second capacity price is added that covers generators with higher fixed costs and lower fuel costs such as combined-cycle gas turbine, coal-powered, and nuclear generators. This second capacity price is conditional on a lower energy price ceiling and determined by the interaction of the market supply and a demand schedule derived from the optimal fuel mixed principle.
Korea electricity market consists of two payment systems, capacity and energy. Capacity payments are given to the generators according to its hourly availability considering hourly and seasonal weighting factors. Energy payments are settled at the marginal generation cost based on generator variable cost. In 2007, base load energy market is closed and single capacity payment system is begun to apply in electricity market. In this revised market rule, energy price cap for base load generators is newly introduced. We analyze impact of market rule revision in 2007 on base load generators and suggest improvement scheme to enforce market system in this study.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.1
/
pp.64-69
/
2011
A novel concept of the gridable desalination plant is to provide an operation management to enable an electricity plant operation cost reduction. Adjusting recovery rate responded to electricity price, an electricity plant operation cost can be saved. To show a suggested approach, the data of 10 [MIGD](Million Imperial Gallons per Day) SWRO testbed are used. The result shows that total cost reduction rate is calculated about 1.6[%] of annual total electric plant operation cost.
In an electricity market with an imperfect competition, participants make plans of biddings and transaction strategies to maximize their own profits. The market price and the quantity are concerned with the operation reserve as well as the bidding system and demand curves in an electricity market. This paper presents a model of the combined market , energy market and operating teserve market. The Nash equilibrium is analyzed by using a hi-level optimization , maximization of Social welfare (SW) and maximization of the producers' profits.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.54
no.4
/
pp.199-204
/
2005
In an electricity market with an imperfect competition, participants make plans of bidding and transaction strategies to maximize their own profits. The market price and the quantity are concerned with the operation reserve as well as the bidding system and demand curves in an electricity market. This paper presents a market model combined by an energy market and an operating reserve market. The competition of the generation producers in the combined market is formulated as a gaming of selecting bid parameters such as intersections and slopes in bid functions. The Nash Equilibrium(NE) is analyzed by using a hi-level optimization; maximization of Social Welfare(SW) and maximization of the producers' profits.
CBP market which is the first stage of competitive electricity market has been operated and the KPX has been established since April, 2001 by restructuring plan for electricity industry. Baseload unit are settled with baseload CP and BLMP in CBP market. The other unit are settled with peakload CP and SMP. The difference of settlement between two groups occurs the profit changes of the unit. This paper analyzes the profit by units under settlement rule in CBP market. It analyzes the difference between market clearing price and variable costs, and fixed cost recovery through CP income. Finally, this paper suggests the plan how market was affected by the difference of fixed cost recovery by generators and how to improve Intermediate and peak load unit's profit.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.