• 제목/요약/키워드: electrical load

검색결과 6,122건 처리시간 0.044초

Measurement-based Static Load Modeling Using the PMU data Installed on the University Load

  • Han, Sang-Wook;Kim, Ji-Hun;Lee, Byong-Jun;Song, Hwa-Chang;Kim, Hong-Rae;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Journal of Electrical Engineering and Technology
    • /
    • 제7권5호
    • /
    • pp.653-658
    • /
    • 2012
  • Load modeling has a significant influence on power system analysis and control. In recent years, measurement-based load modeling has been widely practiced. In the load modeling algorithm, the model structure is determined and the parameters of the established model are estimated. For parameter estimation, least-squares optimization method is applied. The model parameters are estimated so that the error between the measured values and the predicted values is to be minimized. By introducing sliding window concept, on-line load modeling method can be performed which reflects the dynamic behaviors of loads in real-time. For the purpose of data acquisition, the measurement system including PMU is implemented in university level. In this paper, case studies are performed using real PMU data from Korea Univ. and Seoul National University of Science and Technology. The performances of modeling real and reactive power behaviors using exponential and ZIP load model are evaluated.

Research on Line Overload Emergency Control Strategy Based on the Source-Load Synergy Coefficient

  • Ma, Jing;Kang, Wenbo;Thorp, James S.
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권3호
    • /
    • pp.1079-1088
    • /
    • 2018
  • A line overload emergency control strategy based on the source-load synergy coefficient is proposed in this paper. First, the definition of the source-load synergy coefficient is introduced. When line overload is detected, the source-load branch synergy coefficient and source-load distribution synergy coefficient are calculated according to the real-time operation mode of the system. Second, the generator tripping and load shedding control node set is determined according to the source-load branch synergy coefficient. And then, according to the line overload condition, the control quantity of each control node is determined using the Double Fitness Particle Swarm Optimization (DFPSO), with minimum system economic loss as the objective function. Thus load shedding for the overloaded line could be realized. On this basis, in order to guarantee continuous and reliable power supply, on the condition that no new line overload is caused, some of the untripped generators are selected according to the source-load distribution synergy coefficient to increase power output. Thus power supply could be restored to some of the shedded loads, and the economic loss caused by emergency control could be minimized. Simulation tests on the IEEE 10-machine 39-bus system verify the effectiveness and feasibility of the proposed strategy.

Load Current Prediction Method for a DC-DC Converter in Plasma Display Panel

  • Chae, S.Y.;Hyun, B.C.;Kim, W.S.;Cho, B.H.
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2007년도 7th International Meeting on Information Display 제7권1호
    • /
    • pp.609-612
    • /
    • 2007
  • This paper describes a new method to predict the load current of a dc-dc converter. The load current is calculated using the video information of the PDP. The output capacitance of the dc-dc converter can be reduced by utilizing the predicted load current, which results in a cost reduction of the power system in the PDP.

  • PDF

Utilizing Under Voltage Load Shedding Strategy to Prevent Delayed Voltage Recovery Problem in Korean Power System

  • Lee, Yun-Hwan;Oh, Seung-Chan;Lee, Hwan-Ik;Park, Sang-Geon;Lee, Byong-Jun
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권1호
    • /
    • pp.60-67
    • /
    • 2018
  • The presence of induction motor loads in a power system may cause the phenomenon of delayed voltage recovery after the occurrence of a severe fault. A high proportion of induction motor loads in the power system can be a significant influence on the voltage stability of the system. This problem referred to as FIDVR(Fault Induced Delayed Voltage Recovery) is commonly caused by stall of small HVAC unit(Heating, Ventilation, and Air Conditioner) after transmission or distribution system failure. This delayed voltage recovery arises from the dynamic characteristics associated with the kinetic energy of the induction motor load. This paper proposes the UVLS (Under Voltage Load Shedding) control strategy for dealing with FIDVR. UVLS based schemes prevent voltage instability by shedding the load and can help avoid major economic losses due to wide-ranging cascading outages. This paper review recent topic about under voltage load shedding and compare decentralized load shedding scheme with conventional load shedding scheme. The load shedding strategy is applied to an actual system in order to verify the proposed FIDVR mitigation solution. Simulations demonstrate the effectiveness of the proposed method in resolving the problem of delayed voltage recovery in the Korean Power System.

An Adaptive Undervoltage Load Shedding Against Voltage Collapse Based Power Transfer Stability Index

  • Nizam, Muhammad;Mohamed, Azah;Hussain, Aini
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권4호
    • /
    • pp.420-427
    • /
    • 2007
  • This paper highlights the comparison of a proposed methods named adaptive undervoltage load shedding based PTSI techniques for undervoltage load shedding and two previous methods named Fixed Shed Fixed Delay (FSFD) and Variable Shed Variable Delay (VSVD) for avoiding voltage collapse. There are three main area considerations in load shedding schemes as the amount of load to be shed, the timing of load shedding event, and the location where load shed is to be shed. The proposed method, named as adaptive UVLS based PTSI seem to be most appropriate among the uncoordinated schemes. From the simulation result can be shown the Adaptive UVLS based PTSI give faster response, accurate and very sensitive control for the UVLS control technique. This technique is effectively when calculating the amount to be shed. Therefore, it is possible to bring the voltage to the threshold value in one step. Thus, the adaptive load shedding can effectively reduce the computational time for control strategy.

직류 도시철도 변전소 수요전력 예측 (Power Demand Forecasting in the DC Urban Railway Substation)

  • 김한수;권오규
    • 전기학회논문지
    • /
    • 제63권11호
    • /
    • pp.1608-1614
    • /
    • 2014
  • Power demand forecasting is an important factor of the peak management. This paper deals with the 15 minutes ahead load forecasting problem in a DC urban railway system. Since supplied power lines to trains are connected with parallel, the load characteristics are too complex and highly non-linear. The main idea of the proposed method for the 15 minutes ahead prediction is to use the daily load similarity accounting for the load nonlinearity. An Euclidean norm with weighted factors including loads of the neighbor substation is used for the similar load selection. The prediction value is determinated by the sum of the similar load and the correction value. The correction has applied the neural network model. The feasibility of the proposed method is exemplified through some simulations applied to the actual load data of Incheon subway system.

신경회로망을 이용한 단기전력부하 예측용 시스템 개발 (Development of Electric Load Forecasting System Using Neural Network)

  • 김형수;문경준;황기현;박준호;이화석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1522-1522
    • /
    • 1999
  • This paper proposes the methods of short-term load forecasting using Kohonen neural networks and back-propagation neural networks. Historical load data is divided into 5 patterns for the each seasonal data using Kohonen neural networks and using these results, load forecasting neural network is used for next day hourly load forecasting. Normal days and holidays are forecasted. For load forecasting in summer, max-, and min-temperature data are included in neural networks for a better forecasting accuracy. To show the possibility of the proposed method, it was tested with hourly load data of Korea Electric Power Corporation. (1993-1997)

  • PDF

Trust-Tech based Parameter Estimation and its Application to Power System Load Modeling

  • Choi, Byoung-Kon;Chiang, Hsiao-Dong;Yu, David C.
    • Journal of Electrical Engineering and Technology
    • /
    • 제3권4호
    • /
    • pp.451-459
    • /
    • 2008
  • Accurate load modeling is essential for power system static and dynamic analysis. By the nature of the problem of parameter estimation for power system load modeling using actual measurements, multiple local optimal solutions may exist and local methods can be trapped in a local optimal solution giving possibly poor performance. In this paper, Trust-Tech, a novel methodology for global optimization, is applied to tackle the multiple local optimal solutions issue in measurement-based power system load modeling. Multiple sets of parameter values of a composite load model are obtained using Trust-Tech in a deterministic manner. Numerical studies indicate that Trust-Tech along with conventional local methods can be successfully applied to power system load model parameter estimation in measurement-based approaches.

산업체의 조업률을 반영한 연휴의 단기 전력수요예측 (Short-Term Load Forecasting for the Consecutive Holidays Considering Businesses' Operation Rates of Industries)

  • 송경빈;임종훈
    • 전기학회논문지
    • /
    • 제62권12호
    • /
    • pp.1657-1660
    • /
    • 2013
  • Short-term load forecasting for Chusok and New Year's consecutive holidays is very difficult, due to the irregular characteristics compared with ordinary weekdays and insufficient holidays historical data. During consecutive holidays of New Year and Chusok, most of industries reduce their operation rates and their electrical load levels. The correlation between businesses' operation rates and their loads during consecutive holidays of New Year and Chusok is analysed and short-term load forecasting algorithm for consecutive holidays considering businesses' operation rates of industries is proposed. Test results show that the proposed method improves the accuracy of short-term load forecasting over fuzzy linear regression method.

데이터베이스를 이용한 부하패턴별 수용가 특징 모델링 (Customer Characteristics Modeling for Each Load Pattern using the Database)

  • 이영석;김재철;오정환;윤상윤;박창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.416-418
    • /
    • 2001
  • This Paper presents the 2-step load cycle of daily load curve for representative load pattern of power distribution transformer. We decide the representative load pattern of distribution transformer in domestic using the pattern classification algorithm. The K-mean method is used for the pattern classification algorithm. The acquisition equipment of field load data is utilized for 96-sample distribution transformers and the field data is used in the construction of the database for the creation of daily load pattern.

  • PDF