• 제목/요약/키워드: electric rolling stock

검색결과 101건 처리시간 0.024초

유지보수를 고려한 철도차량 운용계획에 관한 연구 (A Study on the Rolling Stock Scheduling considering maintenance activities in Railway)

  • 김동회;홍순흠
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.280-285
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long-term, mid-term. short-term, and real-time plan. The planning of vehicle and manpower resources is a main research topic in tactical short-term planning step. Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far, power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high-speed railway is introduced, the operational planning of trainset vehicles become important, In this paper, we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

고속철도차량의 유지보수계획 (Rolling Stock Maintenance Scheduling for High-Sneed Railway)

  • 김동희;홍순흠
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 춘계학술대회
    • /
    • pp.53-61
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

HEMU-400X와 해외 주전력 변환장치 시스템기술 분석 (Technological overview of the main converter/inverter between HEMU-400X and abroad High Speed Trains)

  • 소진섭;이영염;이진형;손경소;이종호;국문석;윤차중
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집 특별세미나,특별/일반세션
    • /
    • pp.567-573
    • /
    • 2009
  • The technologies of the main converter/inverter, which is indispensable for securing a safety and reliability of traction performance in rolling stock, have been compared and analyzed between HEMU-400X and High Speed Trains in Japan, France and Germany through this study. The result of this study indicates that home and abroad technologies aim at a small-sized and lightweight main converter/inverter as well as the prevention of noise in electric ventilator.

  • PDF

180km/h급 간선형 전기동차 운전실 설계기준 마련 연구 (A Study on the Standard Preparation for Cab Design of EMU with the 180km/h of Maximum Speed)

  • 임재은;정도원;김치태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1229-1234
    • /
    • 2009
  • 현재 한국철도공사에서 운행하는 철도차량은 KTX, 새마을호동차(PP), 선행전기기관차 (NEL), 전기기관차 (EL), 디첼기관차, 도시통근형동차(CDC), VVVF, 저항제어차 등 8 여종에 이르고, 현재는 150km/h 급 간선행전기동차 (Electric Multiple Unit)는 시험운행중이다. 또한 조만간 폐차되는 새마을호동차의 대체차량으로 180km/h 급 간선형전기동차의 도입이 예정되어 있다. 하지만 아직까지 철도차량의 운전실제어대 설계기준이 없고, 제어기기의 배치 및 형식 등에 대해 운전자의 입장에서 인체공학적 접근을 시도한 연구도 전무한 실정이어서 개발되는 차량마다 제어기의 형식 및 조작방식이 상이하다. 이는 운전자의 기기 취급 오류률 유발할 가능성이 매우 크며, 신규차량 도입시 별도의 운전자 교육을 시행해야하는 동 운영 상의 효율성이 매우 떨어진다. 따라서 운전자의 의견수렴을 바탕으로 운전 중 상시 취급하는 제어기기 및 안전설비에 대하여 안전공학 및 인체공학적 설계기준을 마련하여 운전자로 하여금 기기취급에 정확성을 높이고, 이례적인 상황에서 보다 더 신속한 대처를 할 수 있도록 하여 철도차량 안전성과 운영상의 효율성을 증진하고자 한다.

  • PDF

400km/h급 전차선로 시스템의 시범적용 구간선정 연구 (The Feasibility Study of the Scenario of 400kph Maximum Speed Test in HEMU (High-speed Electric Multiple Unit) System)

  • 유향복;장사술;박재웅;이해원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.761-767
    • /
    • 2011
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

전원외란 시뮬레이터를 이용한 고속전철 이선현상 모의 실험 (The Simulation Implementation on contact loss of high speed electric railway using a Power Line Disturbance simulator)

  • 김재문;김양수;장진영;안정준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.2152_2153
    • /
    • 2009
  • In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated from an electrical response point of view. To analysis power line disturbance by induced contact loss phenomenon for high speed operation, a hardware Simulator which considered contact loss between contact wire and the pantograph as well as contact wire deviation is developed. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system. One of the most important needs accompanied by increasing the speed of high-speed train is reduced that an arc phenomenon by loss of contact brings out EMI. In case of a high-speed train using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI, dummy signal injection etc usually occurs. Throughout experiment, it is verified that an arc phenomenon is brought out for simulator operation and consequently conducted noise is flowed in electric circuit by power line disturbance.

  • PDF

전원외란 시뮬레이터를 이용한 고속전철 이선현상과도 특성 연구 (Transient Characteristic Study on Contact Loss of High Speed Electric Railway Using a Power Line Disturbance Simulator)

  • 김재문;김양수
    • 전기학회논문지P
    • /
    • 제58권4호
    • /
    • pp.427-431
    • /
    • 2009
  • In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated from an electrical response point of view. To analysis power line disturbance by induced contact loss phenomenon for high speed operation, a hardware Simulator which considered contact loss between contact wire and the pantograph as well as contact wire deviation is developed. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system. One of the most important needs accompanied by increasing the speed of high-speed train is reduced that an arc phenomenon by loss of contact brings out EMI. In case of a high-speed train using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI(Electromagnetic Interference), dummy signal injection etc usually occurs. Throughout experiment, it is verified that an arc phenomenon is brought out for simulator operation and consequently conducted noise is flowed in electric circuit by power line disturbance.

ATP 시스템에서 열차속도에 따른 지상자에서 차상자까지의 자계의 세기 및 비트오류율에 관한 연구 (A Study on the Magnetic Field Intensity and BER from Wayside Device to On-board Device about the Train Speed in ATP System)

  • 김민석;이상혁;이종우
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1803-1808
    • /
    • 2010
  • Electric railway system consists of rolling stock, track, signal and catenary system. ATP system in railway signaling system is the important one grasping the position and velocity of a train. The wayside device of ATP system is installed between rails. Recently, the research about increasing train speed has been developed in total departments of the railroad systems. The study on the information transmission between on-board device and wayside device is required for increasing the train speed in the ATP system. When the train speed is increased as to same transmission distance, the problem on information transmission occurs because the transmission time is decreased. In case that the transmission distance is extended, the transmission time is decreased with respect to the train speed. Therefore, we have to define the standard magnetic field intensity as to the train speed in order to transmit correctly telegram. In this paper, the transmission distance for the telegram is suggested on the basis of the train speed. Also, the standard magnetic field intensity from the wayside device to on-board device is proposed by using transmission distance regarding the train speed in the ERTMS/ETCS system by using Matlab program. Also, BER according to the train speed is presented by calculating electric field intensity from the magnetic field intensity.

광계측기를 이용한 전차선-팬터그래프 재질별 이선아크 스펙트럼 분석 (Analysis of Contact Loss Arc Spectrum between Contact Wire and Pantograph Material using a Spectrometer)

  • 장진영;정노건;박종국;구경완;김재문
    • 전기학회논문지
    • /
    • 제62권12호
    • /
    • pp.1803-1808
    • /
    • 2013
  • To maintain contact between catenary and pantograph copper is important in order to transmit power smoothly on Current collection system. But, Arc discharge with strong light is generated because of contact loss. Therefore, Arc discharge detection is important measurement factor judging performance of current collection system. In this paper, It is described to results of arc discharge applying UV detection technology using arc generator. And Arc discharge was detected using the most commonly used processing catenary and rigid catenary and pantograph copper of electric rolling stock for securing arc detection instrument reliability. Results of contact loss detection instrument in this paper will be used for maintenance of current collection quality and system.

분산형 고속철도 시스템의 400kph 최고속도 시험을 위한 시운전 시나리오 고찰 (The Feasibility study of the scenario for 400kph maximum speed test in HEMU (High-speed Electric Multiple Unit) System)

  • 강병모;정상훈;안효권;조병찬;문재석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집 특별세미나,특별/일반세션
    • /
    • pp.429-433
    • /
    • 2009
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF