• Title/Summary/Keyword: dynamic scheduling system

Search Result 254, Processing Time 0.02 seconds

Design of Scheduling System for Flexible Manufacturing Cells (FMC에서의 일정계획 시스템의 설계)

  • 신대혁;이상완
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.63-71
    • /
    • 1994
  • The purpose of this paper is to describe an effective cell scheduling system for flexible manufacturing cells. Based on the FMC characteristics, cell scheduling can be defined as a dynamic modified flow shop working in a real-time system. This paper attempt to find the optimal cell scheduling when minimizing the mean flow time for n-job/m-machine problems in static and dynamic environments. Real-time scheduling in an FMC environment requires rapid computation of the schedule.

  • PDF

Development of integrated scheduling system for virtual manufacturing system

  • Roh, Kyoungyun;Noh, Sangdo;Lee, Kyoil
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10a
    • /
    • pp.354-357
    • /
    • 1996
  • Virtual Manufacturing System(VMS) is an integrated computer based model which has physical, logical schema and behavior of real manufacturing system. In this paper, an integrated scheduling system is developed to simulate and control a Virtual Factory. A workflow model is constructed to define and analyze the structure of a VMS. On-line dynamic dispatching system is developed using MultiPass algorithm and scheduling system considering dynamic CAPP is carried out. Integrated scheduling system developed in this paper reduces the discrepancies between virtual model and real manufacturing system, and control of real shop floor is possible.

  • PDF

An Expert System for Short-Term Generation Scheduling of Electric Power Systems (전력계통의 단기 발전계획 기원용 전문가시스템)

  • Yu, In-Keun
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.8
    • /
    • pp.831-840
    • /
    • 1992
  • This paper presents an efficient short-term generation scheduling method using a rule-based expert/consulting system approach to assist electric energy system operators and planners. The expert system approach is applied to improve the Dynamic Programming(DP) based generation scheduling algorithm. In the selection procedure of the feasible combinations of generating units at each stage, automatic consulting on the manipulation of several constraints such as the minimum up time, the minimum down time and the maximum running time constraints of generating units will be performed by the expert/consulting system. In order to maximize the solution feasibility, the aforementioned constraints are controlled by a rule-based expert system, that is, instead of imposing penalty cost to those constraint violated combinations, which sometimes may become the very reason of no existing solution, several constraints will be manipulated within their flexibilities using the rules and facts that are established by domain experts. In this paper, for the purpose of implementing the consulting of several constraints during the dynamic process of generation scheduling, an expert system named STGSCS is developed. As a building tool of the expert system, C Language Integrated Production System(CLIPS) is used. The effectiveness of the proposed algorithm has been demonstrated by applying it to a model electric energy system.

  • PDF

Petri nets modeling and dynamic scheduling for the back-end line in semiconductor manufacturing (반도체 후공정 라인의 페트리 네트 모델링과 동적 스케쥴링)

  • Jang, Seok-Ho;Hwang, U-Guk;Park, Seung-Gyu;Go, Taek-Beom;Gu, Yeong-Mo;U, Gwang-Bang
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.5 no.6
    • /
    • pp.724-733
    • /
    • 1999
  • An effective method of system modeling and dynamic scheduling for the back-end line of semiconductor manufacturing is proposed. The virtual factory, describing semiconductor manufacturing line, is designed in detail, and then a Petri net model simulator is developed for operation and control of the modular cells of the virtual factory. The petri net model is a colored timed Petri nets (CTPNs). The simulator will be utilized to analyze and evaluate various dynamic status and operatons of manufacturing environments. The dynamic schedulaer has a hierarchical structure with the higher for planning level and the lower for dynamic scheduling level. The genetic algorithm is applied to extract optimal conditions of the scheduling algorithm. The proposed dynamic scheduling is able to realize the semiconductor manufacturing environments for the diversity of products, the variety of orders by many customers, the flexibility of order change by changing market conditions, the complexity of manufacturing processes, and the uncertainty of manufacturing resources. The proposed method of dynamic scheduling is more effective and useful in dealing with such recent pressing requirements including on-time delivery, quick response, and flexibility.

  • PDF

Preliminary Performance Evaluation of a Web Crawler with Dynamic Scheduling Support (동적 스케줄링 기반 웹 크롤러의 성능분석)

  • Lee, Yong-Doo;Chae, Soo-Hwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.8 no.3
    • /
    • pp.12-18
    • /
    • 2003
  • A web crawler is used widely in a variety of Internet applications such as search engines. As the Internet continues to grow, high performance web crawlers become more essential. Crawl scheduling which manages the allocation of web pages to each process for downloading documents is one of the important issues. In this paper, we identify issues that are important and challenging in the crawl scheduling. To address the issues, we propose a dynamic owl scheduling framework and subsequently a system architecture for a web crawler subject to the framework. This paper presents the architecture of a web crawler with dynamic scheduling support. The result of our preliminary performance evaluation made to the proposed crawler architecture is also presented.

  • PDF

Comparison Study of Nonlinear CSAS Flight Control Law Design Using Dynamic Model Inversion and Classical Gain Scheduling (항공기 CSAS 설계를 위한 고전적 Gain Scheduling 기법과 Dynamic Model Inversion 비선형 기법의 비교 연구)

  • Ha, Cheol-Geun;Im, Sang-Su;Kim, Byeong-Su
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.7
    • /
    • pp.574-581
    • /
    • 2001
  • In this paper we design and evaluate the longitudinal nonlinear N(aub)z-CSAS(Command and Stability Augmentation System) flight control law in \"DMI(Dynamic Model Inversion)-method\" and classical \"Gain Scheduling-method\", respectively, to meet the handling quality requirements associated with push-over pull-up maneuver. It is told that the flight control law designed in \"DM-method\" is adequate to the full flight regime without gain scheduling and is efficient to produce the time response shape desired to the handling quality requirements. On the contrary, the flight control law designed in \"Gain Scheduling-method\" is easy to be implemented in flight control computer and insensitive to variation of the actuator model characteristics.n of the actuator model characteristics.

  • PDF

Minimization of Cell-based Handoff Delays to Balance the Load in Fiber Optic Micro-cellular Systems (광마이크로셀 이동통신 시스템의 균등부하를 위한 셀단위 핸드오프 순서결정)

  • 이채영;장세헌
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.26 no.2
    • /
    • pp.1-11
    • /
    • 2001
  • This paper considers the scheduling of cell-based handoffs to balance the traffic in a fiber-optic microcelluar system. In the system depending on the order of cell based handoff, periodical balancing of the traffic among microcells can be achieved. The cell based handoff problem is formulated as a dynamic programming and the computational complexity is analyzed. Since the scheduling problem requires real time solution, heuristic algorithms are proposed and the computational results are discussed.

  • PDF

An On-line Scheduling Algorithm for a GRID System (GRID시스템을 위한 온라인 스케줄링 알고리즘)

  • 김학두;김진석;박형우
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.31 no.1_2
    • /
    • pp.95-101
    • /
    • 2004
  • The scheduling problem that maps independent tasks to heterogeneous resources in distributed computing systems is known as NP-complete[1]. GRID[2] is an example of distributed systems that consisted of heterogeneous resources. Many algorithms to solve this problem have been presented[1,3,4,5]. The scheduling algorithm can be classified into static scheduling algorithms and dynmic scheduling algorithms. A dynamic scheduling algorithm can be used when we can not predict the priority of tasks. Moreover, a dynamic scheduling algorithm can be divided into on-line mode algorithm and batch mode algorithm according to the scheduling time[1,6]. In this paper, we propose a new on-line mode scheduling algorithm. By extensive simulation, we can see that our scheduling algorithm outperforms previous scheduling algorithms.

An Improved Predictive Dynamic Power Management Scheme for Embedded Systems (임베디드 시스템을 위한 개선된 예측 동적 전력 관리 방법)

  • Kim, Sang-Woo;Hwang, Sun-Young
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.6B
    • /
    • pp.641-647
    • /
    • 2009
  • This paper proposes an improved predictive dynamic power management (DPM) scheme and a task scheduling algorithm to reduce unnecessary power consumption in embedded systems. The proposed algorithm performs pre-scheduling to minimize unnecessary power consumption. The proposed predictive DPM utilizes a scheduling library provided by the system to reduce computation overhead. Experimental results show that the proposed algorithm can reduce power consumption by 22.3% on the average comparing with the LLF algorithm for DPM-enable system scheduling.

An Efficient Scheduling Method based on Dynamic Voltage Scaling for Multiprocessor System (멀티프로세서 시스템을 위한 동적 전압 조절 기반의 효율적인 스케줄링 기법)

  • Noh, Kyung-Woo;Park, Chang-Woo;Kim, Seok-Yoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.3
    • /
    • pp.421-428
    • /
    • 2008
  • The DVS(Dynamic Voltage Scaling) technique is the method to reduce the dynamic energy consumption. As using slack times, it extends the execution time of the big load operations by changing the frequency and the voltage of variable voltage processors. Researches, that controlling the energy consumption of the processors and the data transmission among processors by controlling the bandwidth to reduce the energy consumption of the entire system, have been going on. Since operations in multiprocessor systems have the data dependency between processors, however, the DVS techniques devised for single processors are not suitable to improve the energy efficiency of multiprocessor systems. We propose the new scheduling algorithm based on DVS for increasing energy efficiency of multiprocessor systems. The proposed DVS algorithm can improve the energy efficiency of the entire system because it controls frequency and voltages having the data dependency among processors.