• Title/Summary/Keyword: dynamic lot sizing problem

Search Result 17, Processing Time 0.014 seconds

A Study on Dynamic Lot Sizing Problem with Random Demand (확률적 수요를 갖는 단일설비 다종제품의 동적 생산계획에 관한 연구)

  • Kim, Chang Hyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.31 no.3
    • /
    • pp.194-200
    • /
    • 2005
  • A stochastic dynamic lot sizing problem for multi-item is suggested in the case that the distribution of the cumulative demand is known over finite planning horizons and all unsatisfied demand is fully backlogged. Each item is produced simultaneously at a variable ratio of input resources employed whenever setup is incurred. A dynamic programming algorithm is proposed to find the optimal production policy, which resembles the Wagner-Whitin algorithm for the deterministic case problem but with some additional feasibility constraints.

A Dynamic Lot-Sizing Problem with Backlogging for Minimum Replenishment Policy (최소공급량 정책을 위한 추후조달 롯사이징 문제)

  • Hwang, Hark-Chin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.1
    • /
    • pp.7-12
    • /
    • 2010
  • This paper considers a dynamic lot-sizing problem with backlogging under a minimum replenishment policy. For general concave production costs, we propose an O($T^5$) dynamic programming algorithm. If speculative motive is not allowed, in this case, a more efficient O($T^4$) algorithm is developed.

An Improved Algorithm for a Capacitated Dynamic Lot-Sizing Problem with Two-Stage Supply Chain (생산용량 제약하의 2 단계 공급체인에 대한 효율적인 롯사이징 알고리듬)

  • Hwang, Hark-Chin
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.290-296
    • /
    • 2008
  • This paper considers a two-stage dynamic lot-sizing problem constrained by a supplier's production capacity. We derive an improved O($T^6$) algorithm over the O($T^7$) algorithm in van Hoesel et al. (2005).

  • PDF

A Dynamic Lot-Sizing and Outbound Dispatching Problem with Delivery Time Windows and Heterogeneous Container Types (납품시간창과 다종의 컨테이너를 고려한 동적 로트크기결정 및 아웃바운드 디스패칭 문제)

  • Seo, Wonchul;Lee, Woon-Seek
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.4
    • /
    • pp.435-441
    • /
    • 2014
  • This paper considers a single-product problem for inbound lot-sizing and outbound dispatching at a third-party warehouse, where the demand is dynamic over the discrete time horizon. Each demand must be delivered into the corresponding delivery time window which is the time interval characterized by the earliest and latest delivery dates of the demand. Ordered products are shipped by heterogeneous container types. Each container type has type-dependent carrying capacity and the unit freight cost depends on each container type. Total freight cost is proportional to the number of each container type used. Also it is assumed that related cost functions are concave and backlogging is not allowed. The objective of the paper is to simultaneously determine the optimal inbound lot-sizing and outbound dispatching plans that minimize total costs which include ordering, shipping, and inventory holding costs. The optimal solution properties are characterized for the problem and then a dynamic programming algorithm is presented to find the optimal solution.

A Study on Multiple Product Dynamic Lot-sizing (다종제품 동적로트사이징에 관한 연구)

  • Kang, Yong-Ha
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.7
    • /
    • pp.2955-2963
    • /
    • 2012
  • This study presents a column generation approach for multiple product dynamic lot-sizing problem. The basic idea of this approach is to have a master problem which allocates limited capacity among n different products and a sub-problem that performs the optimal lot sizing for each product subject to capacity allocation given by the master problem. In the sub-problem, we develop M/G/1 queuing model based clearing function which captures nonlinear relationship between the lot size, the work in process level and the throughput. A large number of test problems are randomly generated to evaluate the performance. Computational results show that the proposed model can find better solutions within reasonable CPU times.

Meta-Heuristic Algorithms for a Multi-Product Dynamic Lot-Sizing Problem with a Freight Container Cost

  • Kim, Byung-Soo;Lee, Woon-Seek
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.3
    • /
    • pp.288-298
    • /
    • 2012
  • Lot sizing and shipment scheduling are two interrelated decisions made by a manufacturing plant and a third-party logistics distribution center. This paper analyzes a dynamic inbound ordering problem and shipment problem with a freight container cost, in which the order size of multiple products and single container type are simultaneously considered. In the problem, each ordered product placed in a period is immediately shipped by some freight containers in the period, and the total freight cost is proportional to the number of containers employed. It is assumed that the load size of each product is equal and backlogging is not allowed. The objective of this study is to simultaneously determine the lot-sizes and the shipment schedule that minimize the total costs, which consist of production cost, inventory holding cost, and freight cost. Because the problem is NP-hard, we propose three meta-heuristic algorithms: a simulated annealing algorithm, a genetic algorithm, and a new population-based evolutionary meta-heuristic called self-evolution algorithm. The performance of the meta-heuristic algorithms is compared with a local search heuristic proposed by the previous paper in terms of the average deviation from the optimal solution in small size problems and the average deviation from the best one among the replications of the meta-heuristic algorithms in large size problems.

An Adaptive Genetic Algorithm for a Dynamic Lot-sizing and Dispatching Problem with Multiple Vehicle Types and Delivery Time Windows (다종의 차량과 납품시간창을 고려한 동적 로트크기 결정 및 디스패칭 문제를 위한 자율유전알고리즘)

  • Kim, Byung-Soo;Lee, Woon-Seek
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.37 no.4
    • /
    • pp.331-341
    • /
    • 2011
  • This paper considers an inbound lot-sizing and outbound dispatching problem for a single product in a thirdparty logistics (3PL) distribution center. Demands are dynamic and finite over the discrete time horizon, and moreover, each demand has a delivery time window which is the time interval with the dates between the earliest and the latest delivery dates All the product amounts must be delivered to the customer in the time window. Ordered products are shipped by multiple vehicle types and the freight cost is proportional to the vehicle-types and the number of vehicles used. First, we formulate a mixed integer programming model. Since it is difficult to solve the model as the size of real problem being very large, we design a conventional genetic algorithm with a local search heuristic (HGA) and an improved genetic algorithm called adaptive genetic algorithm (AGA). AGA spontaneously adjusts crossover and mutation rate depending upon the status of current population. Finally, we conduct some computational experiments to evaluate the performance of AGA with HGA.

Batch Sizing Heuristic for Batch Processing Workstations in Semiconductor Manufacturing (반도체 생산 배취공정에서의 배취 크기의 결정)

  • Chun, Kil-Woong;Hong, Yu-Shin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.2
    • /
    • pp.231-245
    • /
    • 1996
  • Semiconductor manufacturing line includes several batch processes which are to be controlled effectively to enhance the productivity of the line. The key problem in batch processes is a dynamic batch sizing problem which determines number of lots processed simultaneously in a single botch. The batch sizing problem in semiconductor manufacturing has to consider delay of lots, setup cost of the process, machine utilization and so on. However, an optimal solution cannot be attainable due to dynamic arrival pattern of lots, and difficulties in forecasting future arrival times of lots of the process. This paper proposes an efficient batch sizing heuristic, which considers delay cost, setup cost, and effect of the forecast errors in determining the botch size dynamically. Extensive numerical experiments through simulation are carried out to investigate the effectiveness of the proposed heuristic in four key performance criteria: average delay, variance of delay, overage lot size and total cost. The results show that the proposed heuristic works effectively and efficiently.

  • PDF

Single-prodect dynamic lot-sizing : review and extension (단일품목 동적 롯트량결정에 대한 이론적 고찰과 적용)

  • 김형욱;김상천;현재호
    • Korean Management Science Review
    • /
    • v.5 no.1
    • /
    • pp.56-70
    • /
    • 1988
  • In this study, We reviewed the solution methods (for the heuristic and optimization method) for the single-item dynamic lot-sizing problem, and improved the efficiency (speed and optimality) of the conventional heuristic method by utilizing the inventory decomposition property. The iventory decomposition property decomposes the given original problem into several independent subproblems without violating the optimality conditions. Then we solve each decomposed subproblems by using the conventional heuristics such as LTC, LUC, Silver-Meal etc. For testing the efficiency of the proposed decomposition method, we adopted the data sets given in Kaimann, Berry and Silver-Meal. The computational results show that the suggested problem solving framework results in some promising effects on the computation time and the degree of optimality.

  • PDF