• 제목/요약/키워드: duration model

검색결과 1,672건 처리시간 0.037초

Probabilistic Analysis of Drought Characteristics in Pakistan Using a Bivariate Copula Model

  • Jehanzaib, Muhammad;Kim, Ji Eun;Park, Ji Yeon;Kim, Tae-Woong
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2019년도 학술발표회
    • /
    • pp.151-151
    • /
    • 2019
  • Because drought is a complex and stochastic phenomenon in nature, statistical approaches for drought assessment receive great attention for water resource planning and management. Generally drought characteristics such as severity, duration and intensity are modelled separately. This study aims to develop a relationship between drought characteristics using a bivariate copula model. To achieve the objective, we calculated the Standardized Precipitation Index (SPI) using rainfall data at 6 rain gauge stations for the period of 1961-1999 in Jehlum River Basin, Pakistan, and investigated the drought characteristics. Since there is a significant correlation between drought severity and duration, they are usually modeled using different marginal distributions and joint distribution function. Using exponential distribution for drought severity and log-logistic distribution for drought duration, the Galambos copula was recognized as best copula to model joint distribution of drought severity and duration based on the KS-statistic. Various return periods of drought were calculated to identify time interval of repeated drought events. The result of this study can provide useful information for effective water resource management and shows superiority against univariate drought analysis.

  • PDF

실업자의 재취업과 재취업 형태에 관한 연구 : Weibull Survival Model과 Logistic Regression을 이용한 분석 (Unemployment Duration and Re-employment Pattern : An Analysis using Weibull Model and Logistic Regression Model)

  • 강철희;김교성
    • 한국사회복지학
    • /
    • 제39권
    • /
    • pp.5-40
    • /
    • 1999
  • 이 연구의 목적은 실업자의 실업기간과 재취업 형태에 영향을 미치는 주된 요인이 무엇인지를 파악하고, 그에 기초하여 보다 바람직한 고용관련정책 마련에 필요한 기초자료를 제공하는 데 있다. 이를 위해 이 연구는 보건사회연구원과 노동연구원이 공동으로 실시한 '1998년도 전국 실업실태 및 복지욕구조사' 자료를 Weibull 모델과 Logistic모델을 이용하여 분석하였다. 분석한 결과, 전체 실업자를 대상으로 할 경우, 연령, 가구 월 평균소득, 가구주 여부, 결혼 여부, 이전 직장의 규모, 실직사유 등의 변수가 실업자의 실업기간에 영향을 미치는 주요 요인으로 파악되었고, 연령, 이전 직장의 직종과 근무형태, 고용보험가입 여부 등의 변수가 실업자의 재취업형태에 영향을 미치는 주요 요인으로 파악되었다. 이러한 실증적 분석의 결과를 바탕으로 이 연구는 불안정한고용상태와 실업, 그리고 실업과 불안정한 재취업의 순환을 반복할 수 있는 취약계층 근로자를 위한 보다 체계적인 실업대책의 필요성을 논하면서 정책적인 제언을 하고자 한다.

  • PDF

공사 진행단계별 기울기 추정을 통한 최종 공사비 및 공기 예측 (Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage)

  • 진의재;곽수남;김두연;김형관;한승헌
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.137-142
    • /
    • 2006
  • 비용과 공기는 수익과 직접적인 상관관계를 갖는 중요한 요소로 성공적인 프로젝트를 위해서는 이들에 대한 정확한 예측이 이루어져야 한다. 현재 최종 공사비와 공기 예측을 목적으로 EVMS(Earned Value Management System)가 범용적으로 활용되고 있지만, 기존에 제시된 공사비 및 공기 예측모텔은 선형적인 예측방식을 사용하기 때문에 예측결과가 부정확하고 시공업체의 성향, 프로젝트의 특성, 진도율에 따른 변화 등을 고려하지 못하는 한계가 있었다. 본 연구에서는 건설산업의 다양한 특성이 반영될 수 있도록 PB-S curve와 다중회귀분석을 이용한 진행단계별 공사비 및 공기의 기울기 예측모델을 제안하고 이를 동해 최종 공사비 및 공기를 예측하고자 한다. 이를 위하여 국내 건설업체로부터 23건의 도로공사 EVMS 자료를 활용하여 공사 진행단계별 기울기 예측을 위한 회귀분석방정식을 도출하고, 활용성을 검증하였다.

  • PDF

고속도로 교통사고 시 돌발상황 지속시간 영향 요인 분석 (A Study on the Influencing Factors for Incident Duration Time by Expressway Accident)

  • 이기영;서임기;박민수;장명순
    • 한국도로학회논문집
    • /
    • 제14권1호
    • /
    • pp.85-94
    • /
    • 2012
  • 교통사고 발생시점부터 사고처리가 완료된 시점까지를 돌발상황 지속시간(Incident Duration Time)이라고 정의하는데, 이를 단축시켜야만 교통사고 피해를 최소화할 수 있다. 본 연구는 고속도로 교통사고를 대상으로 돌발상황 지속시간에 영향을 주는 요인들을 찾아내기 위한 모형을 개발하였다. 모형은 모든 사고자료에 포함한 통합 모형(모형1)과 일반구간, 교량, 터널 등 교통사고 장소별로 구분하여 분석한 세부 모형(모형 2, 3, 4) 등 모두 4개의 모형을 구축하였다. 분석 결과, 교통사고가 발생한 장소에 따라 돌발상황 지속시간에 다른 영향을 주는 것으로 나타났으며, 현장 처리를 위한 작업차량 도착시간이 가장 민감한 요인으로 분석되었다. 또한 차-차 사고, 화물차에 의한 사고, 야간 사고, 주말 사고 등의 시사점 있는 요인들을 찾아냈다. 이러한 연구결과는 향후 교통사고 관리대책을 수립하는 데 있어 중요한 판단지표로 활용이 가능할 것으로 판단된다.

모유수유 실천 및 수유기간에 영향을 미치는 요인 (Factors Affecting Breastfeeding Rate and Duration)

  • 황원주;강대룡;서문희;정우진
    • Journal of Preventive Medicine and Public Health
    • /
    • 제39권1호
    • /
    • pp.74-80
    • /
    • 2006
  • Objectives: The purpose of this study is to examine the factors affecting the rate and duration of breastfeeding. Methods: We analyzed the data from the year 2000 Korea National Fertility Survey that was collected through direct interviews. In particular, the mothers who delivered their last child and the child was under 1 year of age from January 1998 to June 2000 (N=1,066) were analyzed via a logistic model to assess the factors affecting the breastfeeding rate. Among the study subjects, those who had initiated breastfeeding (N=740) were analyzed through Cox's proportional hazard model to evaluate the factors affecting the duration of breastfeeding. Results: The multivariate logistic model showed that the delivery type and the baby's birth-weight have a statistically significant influence on the breastfeeding rate. Women who delivered their babies through Cesarean section were less likely than others to breastfeed. In contrast, the women whose babies weighed 2.5Kg or more were more likely than others to breastfeed. The results obtained from the survival analysis are as follows: the higher the mother's education level, the shorter is the breastfeeding duration. The mother's work status played a significant role in the early termination of breastfeeding. Women aged 35 or older showed a longer breastfeeding duration than the younger age groups, whereas the maternal age was not a significant factor in affecting whether or not a mother would breastfeed. Conclusions: Reducing the cases of operative delivery (Cesarean section) and low weight births, enlightening young and highly educated women on breastfeeding and improving the environment for breastfeeding on the job are important strategies to encourage women to breastfeed.

An improvement on the concrete exothermic models considering self-temperature duration

  • Zhu, Zhenyang;Chen, Weimin;Qiang, Sheng;Zhang, Guoxin;Liu, Youzhi
    • Computers and Concrete
    • /
    • 제19권6호
    • /
    • pp.659-666
    • /
    • 2017
  • Based on the Arrhenius equations, several hydration exothermic models that precisely calculate the influence of concrete's self-temperature duration on its hydration exothermic rate have been presented. However, the models' convergence is difficult to achieve when applied to engineering projects, especially when the activation energy of the Arrhenius equation is precisely considered. Thus, the models' convergence performance should be improved. To solve this problem and apply the model to engineering projects, the relationship between fast iteration and proper expression forms of the adiabatic temperature rise, the coupling relationship between the pipe-cooling and hydration exothermic models, and the influence of concrete's self-temperature duration on its mechanical properties were studied. Based on these results, the rapid convergence of the hydration exothermic model and its coupling with pipe-cooling models were achieved. The calculation results for a particular engineering project show that the improved concrete hydration exothermic model and the corresponding mechanical model can be suitably applied to engineering projects.

기술가치 평가를 위한 기술사업화 기간 및 비용 추정체계 개발 (Development of Systematic Process for Estimating Commercialization Duration and Cost of R&D Performance)

  • 전승표;최대헌;박현우;서봉군;박도형
    • 지능정보연구
    • /
    • 제23권2호
    • /
    • pp.139-160
    • /
    • 2017
  • 기술사업화는 기업의 연구개발 과정 및 결과물을 시장에 효과적으로 연계하여 경제 가치를 창출하는 것을 의미한다. 거시적인 관점에서 보면 기술사업화는 국가수준의 R&D 효과성을 강화할 수 있으며, 관련된 산업의 발전을 촉진할 수 있다. 또한, 미시적인 관점에서 보면 기업이나 개인들은 기술사업화를 통해서 경쟁우위를 확보하고, 유지할 수 있다. 특정 기술이 사업화까지 이르기 위해서는 기술 기획, 기술의 연구와 개발, 상용화 즉 시장 진출까지의 크게 세 단계를 거치는 게 일반적이며, 이런 일련의 과정은 많은 시간과 비용을 수반한다. 따라서 연구개발 착수에서 상용화까지 소요되는 기술사업화 기간과 비용은 기업 입장에서는 시장 진출 전략을 결정하는 데 중요한 의사결정 정보가 되며, 기술 투자자에게는 기술가치를 합리적으로 평가하는데 더욱 중요한 정보가 된다. 이렇게 중요한 기술사업화 소요 기간과 비용을 과학적으로 추정하는 것은 매우 중요하지만 현재까지 이런 두 가지 정보에 대한 연구는 매우 부족한 실정이며, 널리 알려진 방법론도 부재한 상황이다. 본 연구의 목적은 기술사업화 기간과 비용을 추정하는 체계를 설계하고 이를 실제 기업데이터를 활용하여 개발하는 것이다. 구체적으로 특정 기술의 기술 자체의 요인, 기술개발 주체의 역량, 외부 환경 요인의 세 관점에서 어떤 요인들이 기술사업화 기간 및 비용에 영향을 주는지 도출하고, 해당 요인들의 수준에 따라 기술사업화 기간 및 비용을 제시하는 모형을 개발하고자 한다. 본 연구의 결과는 기술을 개발하는 주체와 기술을 투자하는 주체 모두에게 유용하게 활용될 것으로 기대된다.

초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정 (Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model)

  • 문성우;박상천;권기남
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.26-33
    • /
    • 2009
  • 건설사업의 단계별 진행에 따라서 공정 스케줄의 정확도에 대한 요구수준이 달라진다. 본 연구의 목적은 건설사업의 초기단계에서 활용할 수 있는 표준공정모델을 제시하여 신속하게 전체 개략공기를 산정하는 체계를 제시하는 것이다. 표준공정모델을 적용하여 작업공정을 모듈화하고, Top-down 식 접근으로 상위레벨에서 공정모듈 간 작업연관관계를 분석함으로써 신속하게 프로젝트의 공사기간을 산정할 수 있다. 표준공정모델의 타당성을 검증하기 위해서 각 공정모듈의 작업기간이 일정하다고 가정하고, 가스 플랜트 공정에 대하여 적용시켰다. 그 결과 표준공정모델을 사용하여 계산한 개략 공사기간과 공정관리 툴을 사용한 상세 공사기간은 -3.1% 부터 +15.0%까지의 범위에서 차이를 가졌다. 이러한 결과는 제시된 표준공정모델이 일정 수준의 신뢰성을 가지는 공정 스케줄 정보를 제공하고, 사업기획과 타당성 분석 등 건설사업의 초기단계에서 신속하게 의사결정을 도울 수 있다는 것을 보여준다.

한국의 봄-가을은 짧아지고 있는가? (Are Spring and Fall in South Korea Getting Shorter?)

  • 김동현;신하용
    • 대한산업공학회지
    • /
    • 제39권6호
    • /
    • pp.546-553
    • /
    • 2013
  • A clear increase in the average annual temperature is observed worldwide, and climate changes take place in response to that increase. This affects not only the ecosystem, but also to mankind. Of all those aspects of climate change, people are especially interested in the length of each season, and people acknowledge that the duration of spring and fall has been shortened over the past several years. Still, it is difficult to observe this kind of phenomenon with the simple analysis of dividing the seasons and calculating the duration. Therefore, this study attempted to set up a more intuitive standard which well reflects the current situation. This study also divided the daily climate into 4 states using the daily maximum and minimum temperature. Moreover, using the Hidden Markov Model, this study calculated the duration of each season and analyzed its tendency based on the daily temperature data of the last 53 years (1960~2012). According to the result, the duration of spring and fall showed mild decreasing tendency over the past 53 years, and the duration of fall decreased even more during the past 30 years in the Korean peninsula. After 1960, the start of spring was advanced, which decreased the length of winter for about 11 days. On the other hand, the duration of summer increased for about 25 days, which is consistent with the worldwide tendency of temperature increase.

하수관거 통수능 해석을 위한 Huff 모형과 ABM 법의 적용성 분석 (Applicability of Huff Model & ABM Method for Discharge Capacity of Sewer Pipe)

  • 현인환;전승희;김두일
    • 상하수도학회지
    • /
    • 제36권4호
    • /
    • pp.229-237
    • /
    • 2022
  • The sewer capacity design have been based on the Huff model or the rational equation in South Korea and often failed to determine optimal capacity, resulting in frequent urban flooding or over-sizing. A time distribution of rainfall (i.e., Huff or ABM method) could be used instead of a rainfall hyetograph obtained from statistical analysis of previous rainfalls. In this study, the Huff method and the ABM method, which predict the time distribution of rain intensity, which are widely used to calculate sewage pipe drainage capacity using the SWMM, were compared with the standard rainfall intensity hyetograph of Seoul. If the rainfall duration was 30 minutes to 180 minutes, the rainfall intensity value calculated by the Huff model tended to be less than the rainfall intensity value of the standard rainfall intensity in the initial 5-10 minutes. As a result, more than 10% to 30% of under-design would be made. In addition, the rainfall intensity value calculated by the Huff model from the section excluding the initial 5-10 minutes of rainfall to the rainfall duration was calculated larger than the value using the standard rainfall intensity equation, which would result in an over-design of 10% to 30%. In the case of a relatively long rainfall duration of 360 minutes (6 hours) to 1,440 minutes (24 hours), it showed an lower rainfall intensity of 60 to 90% in the early stages of rainfall, but the problem of under-design had been solved as the rainfall duration time had elapsed. On the other hand, in the alternating block method (ABM) method, it was found that the rainfall intensity at the entire period at each assumed rainfall duration accurately matched the standard rainfall intensity hyetograph of Seoul.