• 제목/요약/키워드: duration and costs

검색결과 136건 처리시간 0.023초

Decision-Making on Incoterms 2020 of Automotive Parts Manufacturers in Thailand

  • SURARAKSA, Juthathip;AMCHANG, Chompoonut;SAWATWONG, Nutcharin
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권10호
    • /
    • pp.461-470
    • /
    • 2020
  • The objective of this research is to examine the factors affecting the decision-making of International Commercial Terms (Incoterms) of automotive parts manufacturers in Thailand. This mixed method study applied qualitative and quantitative research methods and utilized the analytical hierarchy process (AHP) to prioritize the significance of the factors. By an in-depth literature review and expert interview, four main criteria were identified. These criteria include Operating costs, Cooperation and bargaining power, Knowledge and understanding and Operation duration then main criteria divided into fifteen sub-criteria. The common Incoterms, Ex Works (EXW), Free On Board (FOB), Free Carrier (FCA), and Cost, Insurance and Freight (CIF), were determined as alternatives to the incoterms through a preliminary survey. The results revealed that the operating costs were the most important factor for the company. Moreover, it was discovered that this was consistent with the priority of the secondary factors, which included the annual budget for the transportation expenses and product value at one time. The respondents' perspective suggested that FCA was the most appropriate Incoterms for international trade for a company. The findings of this research suggest a hierarchy model for organizations to prioritize the significant factors in order to make a decision on the most appropriate Incoterms.

강원도 토석류 산사태의 특성에 관한 연구 (A Study on Characteristics of Landslides of Debris Flow in Gangwon-do)

  • 유남재;전상현;박남선
    • 산업기술연구
    • /
    • 제28권A호
    • /
    • pp.3-10
    • /
    • 2008
  • This paper is to investigate the characteristics of debris flow landslides in Gangwon Province through literature review, data collection and analyses and site investigation. As results of data analyses about landslides occurred currently in this province, the landslide in the form of debris flow is found to be 55 %. Therefore major loss and costs are caused by discharge of soil and rock fragments from landslide. From results of analyzing the geometrical characteristics of landslide, length of most of landslide is less than 200 m, their width is in the range of 10 - 40 m, most of them are know to be occurred in lower elevation than 400 m. Slope angle is in the range of 25 - 35 degrees. Comparing the period of rainfall intensity with the time of landslide being occurred, occurrence of landslide is quite related to duration of a heavy rainfall. For measures of controlling water flow discharge and debris flow, considering geological and topographical ground conditions, appropriate selection and building check dam, erosion control dam and ring net is very beneficial for reducing the loss and costs caused by the landslide of debris flow.

  • PDF

A Study on the Determinants of Decommissioing Cost for Nuclear Power Plant (NPP)

  • Cha, Hyungi;Yoon, Yongbeum;Park, Soojin
    • 방사성폐기물학회지
    • /
    • 제19권1호
    • /
    • pp.87-111
    • /
    • 2021
  • Nuclear power plants (NPPs) produce radioactive waste and decommissioning this waste entails additional cost; determining these costs for various types and specifications of radioactive waste can be challenging. The purpose of this study is to identify major determinants of the decommissioning cost and their impact on NPPs. To this end, data from defunct NPPs were gathered and 2SLS (Two Stage Least Squares) regression models were developed to investigate the major contributors depending on the reactor types, viz. PWR (Pressurized Water Reactors) and BWR (Boiling Water Reactors). Additionally, cost estimations and the Monte Carlo simulation were performed as part of performance validation. Our study established that the decommissioning costs are primarily influenced by the level of radioactivity in the decommissioned waste, which can be realized from operational factors like operation period, overall efficiency, and plant capacity, as well as from duration of decommissioning and labour cost. While our study provides an improved statistical approach to recognize these factors, we acknowledge that our models have limitations in forecasting accurately which we envisage to bolster in future studies by identifying more substantive factors.

노인의 대퇴전자간 골절의 수술적 방법에 따른 임상적 특성 및 의료비용 비교 (Comparative Analyses of the Clinical Characteristic and Medical Cost against Surgical Procedures for Intertrochanteric Fracture in the Elderly Patients)

  • 최미나
    • 간호행정학회지
    • /
    • 제13권2호
    • /
    • pp.199-207
    • /
    • 2007
  • Purpose: Clinical characteristics and medical cost were analyzed according to the surgical procedures for intertrochanteric fracture in aged patients to assess the appropriateness of treatment expense and to find possibility of reducing the medical cost. Method: Variable for the statistical analysis were; the clinical characteristics, medical cost according to the surgical procedures, the treatment success rate, the total medical expense, and the average expense per case. SAS Package Version 8.02. was used to analyze the relevant data. Results: Operative procedures differ significantly according to the gender and by the location of institution. Only significant clinical variables according to the operative procedure were duration of general anesthesia and amount of blood transfusion. Average cost per treatment was the highest in the bipolar hemiarthroplasty followed by the gamma nail and hip compressing screw. Average cost for bipolar hemiarthroplasty was significantly higher than other surgical procedures. Conclusions: The difference in hospital costs for treatment of intertrochanteric fracture originates from the utilized surgical procedures, mostly by the materials used. The method of surgical treatment should be carefully determined by the purpose of the surgery, in order to improve the quality of medical care and also to reduce the hospital cost.

  • PDF

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

정전비용과 신뢰도 분석을 통한 분할 개폐기의 적정 자동화율 도출 알고리즘에 관한 연구 (Study on the algorithm for the Reasonable Switch Automation Rate with Customer Interruption Cost and Reliability Evaluation)

  • 채희석;신희상;조성민;문종필;김재철
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.467-473
    • /
    • 2013
  • The addition of disconnect switches to a distribution feeder or the replacement of the manual switches with the automatic switches do, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder and reducing the outage section. However, the improvement of reliability in power distribution system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we suggest the algorithm for determining the reasonable switch automation rate in the power distribution system. We evaluate the customer interruption cost and reliability for several cases - these cases relate with the switch automation rate - in the domestic metropolitan power distribution system, estimate the effectiveness of changing the manual switch to automatic switch quantitatively. These results can help the determining on the disconnect switch's automation rate.

Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems

  • Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.636-647
    • /
    • 2012
  • Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.

Faster-than-real-time Hybrid Automotive Underwater Glider Simulation for Ocean Mapping

  • Choi, Woen-Sug;Bingham, Brian;Camilli, Richard
    • 해양환경안전학회지
    • /
    • 제28권3호
    • /
    • pp.441-450
    • /
    • 2022
  • The introduction of autonomous underwater gliders (AUGs) specifically addresses the reduction of operational costs that were previously prohibited with conventional autonomous underwater vehicles (AUVs) using a "scaling-down" design philosophy by utilizing the characteristics of autonomous drifters to far extend operation duration and coverage. Long-duration, wide-area missions raise the cost and complexity of in-water testing for novel approaches to autonomous mission planning. As a result, a simulator that supports the rapid design, development, and testing of autonomy solutions across a wide range using software-in-the-loop simulation at faster-than-real-time speeds becomes critical. This paper describes a faster-than-real-time AUG simulator that can support high-resolution bathymetry for a wide variety of ocean environments, including ocean currents, various sensors, and vehicle dynamics. On top of the de facto standard ROS-Gazebo framework and open-sourced underwater vehicle simulation packages, features specific to AUGs for ocean mapping are developed. For vehicle dynamics, the next-generation hybrid autonomous underwater gliders (Hybrid-AUGs) operate with both the buoyancy engine and the thrusters to improve navigation for bathymetry mappings, e.g., line trajectory, are is implemented since because it can also describe conventional AUGs without the thrusters. The simulation results are validated with experiments while operating at 120 times faster than the real-time.

산업단지내 배전계통의 공급신뢰도 및 정전비용 평가 (Evaluation of Reliability and Interruption Cost of Distribution Power System in Industrial Complex)

  • 최상봉;남기영;김대경;정성환;류희석;이재덕
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.95-96
    • /
    • 2006
  • As the power industry moves towards open competition, there has been a call for methodology to evaluate distribution power system reliability by using customer interruption costs. Accordingly, it is increased for methodology to evaluate distribution power system reliability in power supply zones under competitive electricity market. This paper presents algorithm to evaluate system average interruption duration index. expected energy not supplied and system outage cost taking Into consideration failure rate of distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, distribution system of a dual supply system consisting of mostly high voltage customers in industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index and expected energy not supplied in sample industrial complex area are shown in detail.

  • PDF

친환경 건축물의 LCA 평가도구 비교분석 연구 (A Study on the Analysis of LCA tools for Eco-Building)

  • 손우진;강혜진;이언구
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2009년도 추계학술발표대회 논문집
    • /
    • pp.394-399
    • /
    • 2009
  • Since some decades ago, there has been a concern for resource depletion and environmental pollution associated with building properties. In addressing such impact of the built environment, there is a recognition of the existence of alternative building materials, fuels for energy supply as well as technologies for waste handling and disposal. Nevertheless, for long time, the choice between such alternatives was dictated by factors such as differences in prices and aesthetic values. A new important dimension in discriminating between different options is the environmental dimension. This aspect is important since buildings are one of the spatially big new additions to the natural environment that consume a lot of materials and energy during their long lifetime. Thus, with the environmental dimension kept in mind, a existing cost estimation needs to be changed. A new cost assessment method, Life Cycle Cost, should calculate overall costs with dimensional factors: investment and utility costs as well as maintenance costs over the lifetime of the building. Aiming to give an overview of the present status of Building Life Cycle Assessment(LCA) tools as a basis for further research and development including economic performance, this paper describes and compares 3 different tools for Life Cycle Assessment(LCA) and economic analysis of the green buildings. This paper compared these approaches based on various aspects. These include economic analysis method, evaluation duration, data of results(index). Use of the comparison analysis is to produce a better picture and indicate profits and shortcomings for the tools as a group; thus providing important direction improvement of LCA tool as well as further research and development of this group of tools.

  • PDF