DOI QR코드

DOI QR Code

A Study on the Determinants of Decommissioing Cost for Nuclear Power Plant (NPP)

  • Received : 2021.01.15
  • Accepted : 2021.03.05
  • Published : 2021.03.30

Abstract

Nuclear power plants (NPPs) produce radioactive waste and decommissioning this waste entails additional cost; determining these costs for various types and specifications of radioactive waste can be challenging. The purpose of this study is to identify major determinants of the decommissioning cost and their impact on NPPs. To this end, data from defunct NPPs were gathered and 2SLS (Two Stage Least Squares) regression models were developed to investigate the major contributors depending on the reactor types, viz. PWR (Pressurized Water Reactors) and BWR (Boiling Water Reactors). Additionally, cost estimations and the Monte Carlo simulation were performed as part of performance validation. Our study established that the decommissioning costs are primarily influenced by the level of radioactivity in the decommissioned waste, which can be realized from operational factors like operation period, overall efficiency, and plant capacity, as well as from duration of decommissioning and labour cost. While our study provides an improved statistical approach to recognize these factors, we acknowledge that our models have limitations in forecasting accurately which we envisage to bolster in future studies by identifying more substantive factors.

Keywords

References

  1. E. Neri, F. Amanda, M.E. Urso, D. Marc, G. Rothwell, I. Rehak, I. Weber, S. Carroll, and V. Daniska. Costs of Decommissioning Nuclear Power Plants, Nuclear Energy Agency of the OECD Report, NEA-7201 (2016).
  2. E. Bertel, E. Lazo, and M. Condu, Decommissioning Nuclear Power Plants: Policies, Strategies and Costs, 13, OECD Nuclear Energy Agency, Paris (2003).
  3. International Atomic Energy Agency-Power Reactor Information System. "Operational Reactors by Age." IAEA PRIS. Accessed Sep. 15 2020. Available from: https://pris.iaea.org/PRIS/WorldStatistics/Operational-ByAge.aspx.
  4. D.B. Monteiro, J.M.L. Moreira, and J.R. Maiorino, "A New Management Tool and Mathematical Model for Decommissioning Cost Estimation of Multiple Reactors Site", Prog. Nucl. Energy, 114, 61-83 (2019). https://doi.org/10.1016/j.pnucene.2019.03.004
  5. H.Y. Joo, J.W. Kim, S.Y. Jeong, and J.H. Moon, "Decommissioning Cost Estimation of Kori Unit 1 Using a Multi-Regression Analysis Model", J. Nucl. Fuel Cycle Waste Technol., 18(2(E)), 2470260 (2020).
  6. M. Laraia, D.W. Reisenweaver, and International Atomic Energy Agency. Selection of Decommissioning Strategies: Issues and Factors, IAEA Report, IAEA-TECDOC-1478 (2005).
  7. International Atomic Energy Agency. Policies and Strategies for the Decommissioning of Nuclear and Radiological Facilities, IAEA, Vienna (2011).
  8. Empresa Nacional de Residuos Radiactivos, S.A. Decommissioning Report: Vandellos I Nuclear Power Plant, Empresa Nacional de Residuos Radiactivos, S.A. Report (2007).
  9. International Atomic Energy Agency. Radiological Characterization of Shut Down Nuclear Reactors for Decommissioning Purposes, IAEA Report, TRS-389 (1998).
  10. G.C. Lim, R.C. Hill, and W. Griffiths, Principles of econometrics, 4th ed., 452-460, Wiley, New Jersey (2011).
  11. International Atomic Energy Agency, Nuclear Power Reactors in the World: 2020 Edition Reference Data Series 2, IAEA, Vienna (2020).
  12. World Bank. "GDP per Capita (Current US$).", Accessed Oct. 10 2020. Available from: https://data.worldbank.org/indicator/NY.GDP.PCAP.CD.
  13. World Bank. "GDP Deflator (Base Year Varies by Country).", World Bank. Accessed Oct. 10 2020. Available from: https://data.worldbank.org/indicator/NY.GDP.DEFL.ZS.
  14. Economic Statistics System. "The Exchange Rate of Major Currencies against the U.S. Dollars", ECOS. Accessed Oct. 10 2020. Available from: http://ecos.bok.or.kr/flex/ClassSearch.jsp?langGubun=K&topCode=022Y013.
  15. International Atomic Energy Agency, Release of Sites from Regulatory Control on Termination of Practice: Safety Guide WS-G-5.1, IAEA, Vienna (2006).
  16. U.S. Nuclear Regulatory Commission. "10 CFR 20.1402-Radiological Criteria for Unrestricted Use." (2018).
  17. European Commission. "Recommended Radiological Protection Criteria for the Clearance of Buildings and Building Rubble from the Dismantling of Nuclear Installations, Radiation protection 113." (2000).
  18. European Commission. "Practical Use of Concepts of Clearance and Exemption: Guidance on General Clearance Levels for Practices, Radiation protection 122." (2000).
  19. E. Bertel, E. Lazo, and M. Condu, Decommissioning Nuclear Power Plants: Policies, Strategies and Costs, 19, OECD Nuclear Energy Agency, Paris (2003).
  20. International Atomic Energy Agency. Decommissioning Costs of WWER-440 Nuclear Power Plants: Interim Report: Data Collection and Preliminary Evaluations, IAEA Interim Report, IAEA-TECDOC-1322 (2002).
  21. G. Varley and NAC International Inc. Agesta-BR3 Decommissioning Cost Comparison and Benchmarking Analysis, Swedish Nuclear Power Inspectorate Technical Report, SKI-R-2003-11 (2002).
  22. Mycle Schneider Consulting. Comparison among Different Decommissioning Funds Methodologies for Nuclear Installations, European Commission Report, 4-15, TREN/05/NUCL/S07.55436 (2006).
  23. European Commission. Report from the Commission to the European Parliament and the Council on the Implementation of the Work Under the Nuclear Decommissioning Assistance Programme to Bulgaria, Lithuania and Slovakia in 2018 and Previous Years, European Commission Report, COM(2019) 215 final (2019).
  24. TLG Services Inc. "Preliminary Decommissioning Plan for the Gentilly-2 Nuclear Generating Station." (2015).
  25. Ontario Power Generation. "A Preliminary Assessment to Determine the Financial Impact of Using a Prompt Decommissioning Approach for OPG's Nuclear Generating Stations." (2016).
  26. Cour des comptes. The Costs of the Nuclear Power Sector, Thematic Public Report (2012).
  27. Nuclear Safety Authority. Abstracts on the State of Nuclear Safety and Radiation Protection in France in 2017, ASN Annual Report, L. 592-31 (2018).
  28. B. Ines, H. Johann, K. Andreas, K. Kerstin, N. Katarzyna, P. Frank, and W. Ralf. Statusbericht zur Kernenergienutzung in der Bundesrepublik Deutschland 2018, Nukleare Entsorgung Report, BfE-KE-04/19 (2019).
  29. B. Wealer, C. Gerbaulet, J.P. Seidel, and C. von Hirschhausen, Stand und Perspektiven des Ruckbaus von Kernkraftwerken in Deutschland (»RuckbauMonitoring 2015«), DIW Berlin, Berlin (2015).
  30. Julicher Entsorgungsgesellschaft fur Nuklearanlagen mbH. "Was Kostet der Ruckbau, und Wer tragt die Kosten? AVR-Hochtemperaturreaktor." JEN. Accessed Oct. 20 2020. Available from: https://www.jenjuelich.de/projekte/avr-hochtemperaturreaktor/.
  31. Atommullreport. "Daten Zum AKW Biblis A." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-biblis-a.html.
  32. Atommullreport. "Daten Zum AKW Biblis B." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-biblis-b.html.
  33. Atommullreport. "Daten Zum AKW Brunsbuttel." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akwbrunsbuettel.html.
  34. Atommullreport. "Daten Zum AKW Grafenrheinfeld." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-grafenrheinfeld.html.
  35. Atommullreport. "Daten Zum AKW Greifswald 1-5." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akwgreifswald-1-5.html.
  36. Atommullreport. "Daten Zum AKW Gundremmingen B." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akwgundremmingen-b.html.
  37. Atommullreport. "Daten Zum HDR GroBwelzheim." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/hdrgrosswelzheim.html.
  38. Atommullreport. "Daten Zum AKW Ohu 1/Isar 1." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-ohu-1-isar-1.html.
  39. U. Schonberger, Atommull-Eine Bestandsaufnahme Fur Die Bundesrepublik Deutschland-Sorgenbericht Der Atommullkonferenz Incl. DIN A1-Plakat-Buch Gebraucht Kaufen, 1st ed., Arbeitsgemeinschaft Schacht KONRAD e.V., Salzgitter (2013).
  40. Atommullreport. "Daten Zum AKW Mulheim-Karlich." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-muelheim-kaerlich.html.
  41. Atommullreport. "Daten Zum MZFR Karlsruhe." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/mzfr-karlsruhe.html.
  42. Atommullreport. "Daten Zum AKW Obrigheim." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-obrigheim.html.
  43. Atommullreport. "Daten Zum AKW Rheinsberg." Atommullreport. Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-rheinsberg.html.
  44. Atommullreport. "Daten Zum AKW Stade." Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-stade.html.
  45. Atommullreport. "Daten Zum AKW Esenshamm." Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-esenshamm.html.
  46. Atommullreport. "Daten Zum AKW Wurgassen." Accessed Oct. 20 2020. Available from: https://www.atommuellreport.de/daten/akw-wuergassen.html.
  47. SOGIN. "Caorso Nuclear Power Plant." SOGIN. Accessed Oct. 20 2020. Available from: https://www.sogin.it/en/closureoftheitaliannuclearcycle/italiannuclear-sites/caorsonuclearpowerplant/Pagine/default.aspx.
  48. SOGIN. "Trino Nuclear Power Plant." SOGIN. Accessed Oct. 20 2020. Available from: https://www.sogin.it/en/closureoftheitaliannuclearcycle/italian-nuclear-sites/trinonuclearpowerplant/Pagine/default.aspx.
  49. SOGIN. "Garigliano Nuclear Power Plant." SOGIN. Accessed Oct. 20 2020. Available from: https://www.sogin.it/en/closureoftheitaliannuclearcycle/italiannuclear-sites/gariglianonuclearpowerplant/Pagine/default.aspx.
  50. SOGIN. "Latina Nuclear Power Plant." SOGIN. Accessed Oct. 20 2020. Available from: https://www.sogin.it/en/closureoftheitaliannuclearcycle/italian-nuclear-sites/latinanuclearpowerplant/Pagine/default.aspx.
  51. M. Schmittem, "Nuclear Decommissioning in Japan-Opportunities for European Companies-", EU-Japan Centre, 1-102, March, 2016, Tokyo.
  52. Japan Atomic Industrial Forum. "Current Status of Nuclear Power Plants in Japan." (2019).
  53. World Nuclear Association. "Japan Nuclear Fuel Cycle." World Nuclear Association Library. Accessed Oct. 20 2020. Available from: https://www.world-nuclear.org/information-library/country-profiles/countries-gn/japan-nuclear-fuel-cycle.aspx.
  54. Nuclear Regulatory Agency. "Results of Examination on Conformity of Decommissioning Plan for Reactor 1 of Genkai Nuclear Power Station, Kyushu Electric Power Co., Ltd. to Approval Standards Provided for in Article 119 of the Ordinance on Commercial Reactors." (2017).
  55. Nuclear Regulatory Agency. "Conformity of the Decommissioning Plan for Reactor 2 of the Genkai Nuclear Power Station in Accordance with the Approval Standards Prescribed in Article 119 of the Ordinance on Commercial Reactors Result of Examination." (2020).
  56. Nuclear Regulation Authority. Annual Report, FY 2018 (2019).
  57. Nuclear Regulation Authority. "Shikoku Electric Power Co., Ltd. Results of Examination of Conformity of Decommissioning Plan for Reactor 1 of Ikata Power Station to Approval Standards Prescribed in Article 119 of the Ordinance on Commercial Reactors." (2017).
  58. Shikoku Electric Power Company, Inc. "Decommissioning, Initiatives Associated with the Abolition of Unit 1 and 2." Yonden. Accessed Oct. 21 2020. Available from: https://www.yonden.co.jp/energy/atom/ikata/decommissioning.html.
  59. K.J. Jung, S.T. Paik, U.S. Chung, K.W. Lee, G.H. Chung, S.K. Park, D.G. Lee, and H.R. Kim. Study on the Promotion of International Cooperation for Nuclear Facility Decommissioning between OECD/NEA Member Countries, Korea Atomic Energy Research Institute Technical Report, KAERI/RR-2202 (2001).
  60. Nuclear Regulation Authority. "Results of Examination on Conformity of the Decommissioning Plan for the Mihama Power Station 1 and 2 of Kansai Electric Power Co., Ltd. to the Approval Standards Provided for in Article 119 of the Ordinance on Commercial Reactors." (2017).
  61. Nuclear Regulatory Commission. "Examination on the Application for Approval of the Decommissioning Plan for Power Reactors in Monju, Japan Atomic Energy Agency (JAEA) Fast Breeder Prototype Reactor." (2018).
  62. Nuclear Regulation Authority. "Results of Examination on Conformity of Decommissioning Plan for Reactor No. 1 of Kansai Electric Power Co., Ltd. to Approval Standards Prescribed in Article 119 of the Ordinance on Commercial Reactors." (2019).
  63. Nuclear Regulation Authority. "Results of Examination on Conformity of Decommissioning Plan for Reactor No. 2 of Kansai Electric Power Co., Ltd. to Approval Standards Prescribed in Article 119 of the Ordinance on Commercial Reactors." (2019).
  64. Nuclear Regulation Authority. "Tohoku Electric Power Co., Ltd. Results of Examination on Conformity of Decommissioning Plan for Reactor 1 of Onagawa Nuclear Power Station with the Approval Standards Prescribed in Article 119 of the Ordinance on Commercial Reactors." (2020).
  65. Nuclear Regulation Authority. "Results of Examination of Conformity of Decommissioning Plan for Reactor 1 of Shimane Nuclear Power Station, China Electric Power Co., Ltd. to Approval Standards Provided for in Article 119 of the Ordinance on Commercial Reactors." (2017).
  66. Japan Atomic Power Company. "Decommissioning of Tokai Power Plant." JAPC. Accessed Oct. 21 2020. Available from: http://www.japc.co.jp/tokai/haishi/tokai_haishi.html.
  67. Nuclear Regulation Authority. "Results of Examination on Conformity of Decommissioning Plan for Reactor 1 of Tsuruga Power Station, Japan Atomic Power Co., Ltd. with the Approval Standards Prescribed in Article 119 of the Ordinance on Commercial Reactors." (2017).
  68. Wolfgang Irrek, Lutz Jarczynski, and Lars Kirchner, Comparison among Different Decommissioning Funds Methodologies for Nuclear Installations, Country Report the Netherlands, TREN/05/NUCL/S07.55436 (2006)
  69. "Nuclear Trap: LNPP Will Not Be Able to Close the Shutdown Unit for a Long Time." Accessed Oct. 21 2020. Available from: https://www.rbc.ru/spb_sz/29/12/2018/5c2633749a7947f8833fc998?from=main&fbclid=IwAR3QZnqVK7sked7iWykzK94RgJ1IdIKQB_oBwmd6AeDQe5imlHnNUNM-eqA.
  70. O. Bodrov, D. Matveenkova, A. Talevlin, K. Album, F. Maryasov, and Y. Ivanov. Decommissioning of Russian NPPs, SNF and RW Management in 2016, Decommission Network. (2016).
  71. I. Wolfgang. Comparison Among Different Decommissioning Funds Methodologies for Nuclear Installations, European Commission Final Report, 36, TREN/05/NUCL/S07.55436 (2006).
  72. Jadrova a vyradovacia spolocnost, a.s. "Decommissioning Of Nuclear Facilities Jaslovske Bohunice Site Nuclear Facility A1 Nuclear Power Plant." (2016).
  73. Ministry for Ecological Transition and the Demographic Challenge. "7th General Plan for Radioactive Waste." (2020).
  74. G. Emilio, J. Borque, and A. Abreu, "Comparison of Estimated and Actual Decommissioning Cost of Jose Cabrera NPP", Proc. of Int. Conf. on the Financing of Decommissioning, September 20-21, 2016, Stockholm.
  75. World Nuclear News. "Decommissioning Application Submitted for Garona." WNN. Accessed Oct. 21 2020. Available from: https://world-nuclear-news.org/Articles/Decommissioning-application-submitted-forGarona.
  76. Empresa Nacional de Residuos Radiactivos. S.A. Decommissioning Report: Vandellos I Nuclear Power Plant, Empresa Nacional de Residuos Radiactivos, S.A. Report (2007).
  77. Svensk Karnbranslehantering AB. Plan 2019 Costs from and Including 2021 for the Radioactive Residual Products from Nuclear Power-Basis for Fees and Guarantees for the Period 2021-2023, Svensk Karnbranslehantering AB Technical Report, SKB TR-19-26 (2019).
  78. B. Hansson, Bewon, and L.O. Jonsson. Comparative Analysis of the Oskarshamn 3 and Barseback Site Decommissioning Studies, Svensk Karnbranslehantering AB Technical Report, 1-44, SKB R-09-55 (2009).
  79. H. Larsson, A. Anunti, and M. Edelborg. Decommissioning Study of Oskarshamn NPP, Svensk Karnbranslehantering AB Technical Report, 1-181, SKB R-13-04 (2013).
  80. T. Hansson, T. Norberg, A. Knutsson, P. Fors, and C. Sandebert. Ringhals Site Study 2013-An Assessment of the Decommissioning Cost for the Ringhals Site, Svensk Karnbranslehantering AB Technical Report, SKB-R-13-05 (2013).
  81. H. Wanner, "Decommissioning in Switzerland", Regulatory Information Conference 2017, March 15, 2017, Maryland.
  82. Swissnuclear. "Estimation of Swiss Nuclear Power Plant Disposal Costs, 2016 Cost Study (KS16)." (2016).
  83. Swissnuclear. "Court Report, 2016 Cost Study (KS16)." (2016).
  84. BKW Energie. "Muhleberg Nuclear Power Plant Ceases Operations." BKW. Accessed Oct. 21 2020. Available from: https://www.bkw.ch/en/about-us/media/detail/muehleberg-nuclear-power-plant-ceases-operations.
  85. Great Britain and Nuclear Decommissioning Authority, NDA Draft Business Plan 2020 to 2023, HM Government, London (2020).
  86. Great Britain and Nuclear Decommissioning Authority, Nuclear Decommissioning Authority Strategy: Effective from April 2016, HM Government, London (2016).
  87. Great Britain, Nuclear Decommissioning Authority, J. Clarke, and S. Henwood, Nuclear Decommissioning Authority Annual Report and Accounts: Financial Year: April 2015 to March 2016, HM Government, London (2016).
  88. C. Halliwell, "The Windscale Advanced Gas Cooled Reactor (WAGR) Decommissioning Project a Close Out Report for WAGR Decommissioning Campaigns 1 to 10", WM2012 Conference, February 26-March 1, 2012, Phoenix.
  89. World Nuclear News. "Decommissioning Campaign Complete at UK Reactor." WNN. Accessed Oct. 21 2020. Available from: https://world-nuclear-news.org/Articles/Decommissioning-campaign-complete-at-UK-reactor.
  90. K.M. Haas. Big Rock Point Plant, Post Shutdown Decommissioning Activities Report, Revision 4, Consumers Energy Report (2005).
  91. A.J. Vitale. Big Rock Point, Big Rock Point License Termination Plan, Revision 3, Entergy Report, PNP 2013-030 (2013)
  92. U.S. Department of Energy. Environmental Assessment for Authorizing the Puerto Rico Electric Power Authority (PREPA) to Allow Public Access to the Boiling Nuclear Superheat (BONUS) Reactor Building, Rincon, Puerto Rico, U.S. Department of Energy Report, DOE/EA-1394 (2003).
  93. J. Elnitsky. Crystal River Unit-3Post-Shutdown Decommissioning Activities Report, Duke Energy Report, 3F1213-02 (2013).
  94. E.G. Delaney. "Decommissioning US DOE Nuclear Facilities", IAEA Bulletin, 27(4), 30-34 (1985).
  95. R. Harms, M. Schneider, G. MacKerron, W. Neumann, A. Turmann, and A. Jungjohann. The World Nuclear Waste Report 2019 Focus Europe (2019).
  96. R.P. Tuetken. Dresden Nuclear Power Station Unit 1 Post-Shutdown Decommissioning Activities Report, Commonwealth Edison Company Report (1998).
  97. U.S. Nuclear Regulatory Commission, "Fact Sheet: Decommissioning Nuclear Power Plants." U.S.NRC Office of Public Affairs (2008).
  98. K.M. Harmon, C.E. Jenkins, D.A. Waite, R.E. Brooksbank, B.C. Lunis, and J.F. Nemec. Decommissioning Nuclear Facilities, Pacific Northwest Laboratories Report, BNWL-SA-5834 (1976).
  99. H.D. Oak, G.M. Holter, W.E. Kennedy, Jr., and G.J. Konzek. Technology, Safety and Costs of Decommissioning a Reference Boiling Water Reactor Power Station, Pacific Northwest Laboratory Report, NUREG/CR-0672 (1980).
  100. TLG Services, Inc. Fort Calhoun Station, Unit No. 1, Post-Shutdown Decommissioning Activities Report, TLG Services, Inc. Report, LIC-17-0033 (2017).
  101. Omaha Public Power District, Fort Calhoun Station, Unit No. 1-2019 Annual Decommissioning Funding/Irradiated Fuel Management Status Report, Omaha Public Power District Report, LIC-19-0005 (2019).
  102. K. David. Fort St Vrain. Site Specific Decommissioning Cost Estimate Basis for Preliminary Decomissioning Plan, Public Service Company Report, EE-DEC-0020 (1989).
  103. M. Fisher, "Fort St. Vrain Decommissioning Project", Proc. of a Technical Committee meeting, IAEA-TECDOC-1043 ,123-131, IAEA, Vienna (1997).
  104. L.E. Boing, "An Overview of U.S. Decommissioning Experience-A Basic Introduction", IAEA/USA Interregional Training Course on Decontamination and Decommissioning of Research Reactors and other Small Nuclear Facilities, March 9, 1998, Argonne.
  105. Ge Hitachi Nuclear Energy Americas, LLC. "Vallecitos Nuclear Center Decommissioning Funding Plan." (2017).
  106. U.S. Nuclear Regulatory Commission. U.S.NRC Office of Nuclear Material Safety and Safeguards, Status of the Decommissioning Program 2019 Annual Report (2019).
  107. S.M. Short, M.C. Bierschbach, R.F. Layton, and B.E. Greenfield. Assessment of the Adequacy of the 10 CFR 50.75(c) Minimum Decommissioning Fund Formula Office, Pacific Northwest National Laboratory Report, PNNL-XXXX (2011).
  108. B. Buerger. Revision 4 of the Haddam Neck Plant PSDAR, Connecticut Yankee Atomic Power Company Report, CY-14-021 (2014).
  109. W.F. Heine and B.F. Ureda, "Decontamination and Disposition of Hallam and Piqua Reactors", Proc. of the First Conference On Decontamination And Decommissioning (D&D) Of Erda Facilities, August 19-21, 1975, Idaho Falls.
  110. J.M. Welsch. Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 3, Pacific Gas and Electric Company Report, HBL-19-007 (2019).
  111. Holtec Decommissioning International. Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3, Holtec Decommissioning International Report (2019).
  112. Dominion Energy. Kewaunee Power Station: Revision to Post-Shutdown Decommissioning Activities Report, Dominion Energy Kewaunee Report (2014).
  113. Dominion Energy. Kewaunee Power Station: Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation, Dominion Energy Kewaunee Report (2019).
  114. Lacrossesolutions. Report on Status of Decommissioning Funding for Shutdown Reactor, Lacrossesolutions Report, LC-2019-0014 (2019).
  115. R. Aker, Maine Yankee Decommissioning Experience Report Detailed Experiences 1997-2004, New Horizon Scientific Report (2004).
  116. Dominion Energy. Millstone Power Station Unit 1 Decommissioning Funding Status Report, Dominion Energy Nuclear Connecticut Report, 19-048 (2019).
  117. Holtec Decommissioning International. Notification of Revised Post-Shutdown Decommissioning Activities Report and Revised Site-Specific Decommissioning Cost Estimate for Oyster Creek Nuclear Generating Station, Holtec Decommissioning International Report, 2905001 (2018).
  118. Exelon Generation. Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations, Exelon Generation Report, RS-19-045 (2019).
  119. Entergy Nuclear Operations. Post Shutdown Decommissioning Activities Report Pilgrim Nuclear Power Station, Entergy Nuclear Operations Report (2018).
  120. C.W. Wheelock. Retirement of The Piqua Nuclear Power Facility, Aec Research and Development Report, AI-AEC-12832 (1970).
  121. Sacramento Municipal Utility District. Change in Rancho Seco Decommissioning Schedule: Rancho Seco Post Shutdown Decommissioning Activities Report, Sacramento Municipal Utility District Report, DPG 14-071 (2014).
  122. R.C. Woodard and B.S. Sims. Testimony On 2016 SONGS 1 Decommissioning Cost Estimate, Rosemead, California: EnergySolutions Report, 164007-DCE-017 (2016).
  123. M.S. Williams and B.S. Sims. San Onofre Nuclear Generating Station, Units 2 and 3 Site Specific Decommissioning Cost Estimate, EnergySolutions Report, 164001-DCE-001 (2014).
  124. J.E. Joseph, M.A. Kruslicky, and P.A. Olson. Shippingport Decommissioning-How Applicable Are the Lessons Learned, U.S.GAO Report, GAO/RCED-90-208 (1990).
  125. C. Giacomazzo and J.K. Hadden. "Shoreham Decommissioning Technology: Simple and Effective." Power engineering. Accessed Oct. 21 2020. Available from: https://www.power-eng.com/1996/02/01/nuclear-decommissioning/#gref.
  126. U.S. Nuclear Regulatory Commission, "NRC Staff Terminates Shoreham License; Authorizes Release of Site", 95-42, U.S. NRC, Maryland (1995).
  127. Exelon Generation. Three Mile Island Nuclear Station, Unit 1-Post-Shutdown Decommissioning Activities Report, Exelon Generation Report, TM-19-025 (2019).
  128. TLG Services, Inc. Decommissioning Funding Status Report for the Three Mile Island Nuclear Station, Unit2, GPU Nuclear Report, TMI-15-036 (2015).
  129. TLG Services, Inc. Post Shutdown Decommissioning Activities Report Vermont Yankee Nuclear Power Station, TLG Services, Inc. Report, BVY 14-078 (2014).
  130. NorthStar Group Services. Notification of Revised Post-Shutdown Decommissioning Activities Report (Revised PSDAR) Vermont Yankee Nuclear Power Station, NorthStar Group Services Report 50-271 & 72-59 (2017).
  131. D. Lochbaum, "Life After Nuclear: Decommissioning Power Reactors", Bull. At. Sci., 70(4), 26-36 (2014). https://doi.org/10.1177/0096340214539111
  132. U.S. Nuclear Regulatory Commission. "Yankee Nuclear Power Station-Release of Land from Part 50 License." (2007).
  133. ZionSolutions. Revised Report on Status of Decommissioning Funding for Shutdown Reactors, ZionSolutions Report, ZS-2019-0056 (2019).
  134. South Korean Ministry of Trade, "Industry and Energy. Regulations on the calculation criteria of radioactive waste management costs and spent nuclear fuel management charges." (2019).