• Title/Summary/Keyword: due-date

Search Result 1,030, Processing Time 0.035 seconds

Validity Elevation Scheme of Quality Inspection System for Defect Prevention & Management in Apartment Housing Construction (공동주택 하자예방 및 관리를 위한 품질점검제도의 실효성 제고방안 연구)

  • Park, Geun-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.220-221
    • /
    • 2020
  • Strarting with Buyeong Apartment in Dongtan-2 disrict in 2017, collective complaints of residents are frequently occurring due to low quality problem such as improper construction and defects of apartment houses. Because of this, the Ministry of Land and Transport is preparing a comprehensive improvement scheme to improve the quality of Apartment Housing(AH), taking into account the continuing complaints from the residents of AH and the problem raised by the National Assembly. The basic profile of the improvement scheme is induce the tenants and experts to discover and point out defects that are repaired until the date of use inspection or due date. For this purpose, we suggested this defects management system linkaged by the preliminary inspection and quality inspection system for prospective occupants. In this context, this paper aims to suggest an effective likage method between the preliminary inspection of prospective residents and the quality inspection system implemented by local governments as an ordinance.

  • PDF

Comments on the ICSID Award Ansung Housing v. People's Republic of China (안성주택과 중국의 ICSID 중재사건에 관한 사례연구)

  • Kang, Pyoung-Keun
    • Journal of Arbitration Studies
    • /
    • v.27 no.2
    • /
    • pp.37-57
    • /
    • 2017
  • On 9 March 2017, a Tribunal constituted under the ICSID Convention issued its ruling in the case of Ansung Housing v. People's Republic of China, dismissing with prejudice all claims made by the Claimant, Ansung Housing Co., Ltd., in its Request for Arbitration, pursuant to ICSID Arbitration Rule 41(5). Ansung Housing v. PRC has drawn attention since it is the first case where an investor with Korean nationality initiated an ICSID arbitration on the basis of the Korea-China Bilateral Investment Treaty (BIT) as amended in 2007 between the Republic of Korea and the People's Republic of China. The Tribunal finds that its ruling is about a lack of jurisdiction of the ICSID and of its own competence as well as regarding manifest lack of legal merit due to a lack of temporal jurisdiction, since a Respondent's Rule 41(5) objection is concerned with the three-year limitation period in Article 9(7) of the Korea-China BIT. The Tribunal held that, under Article 9(7) of the Korea-China BIT, the limitation period begins with an investor's first knowledge of the fact that it has incurred loss or damage, not with the date on which it gains knowledge of the quantum of that loss or damage. Finally, the Tribunal held that Ansung submitted its dispute to ICSID and made its claim for purposes of Article 9(3) and (7) of the BIT after more than three years had elapsed from the date on which Ansung first acquired knowledge of loss or damage and that the claim is time-barred and, as such, is manifestly without legal merit. It remains to be seen whether the aggrieved Claimant initiates annulment proceedings before an ad hoc committee under the ICSID Convention. It is quite interesting to see whether the decisions by the Tribunal should be reversed on the basis of the Claimant's arguments as to the start date as well as the end date of the limitation period under the Korea-China BIT.

Tree-Ring Dating of Korean Traditional Furnitures: A Case Study on Cabinet and Chest (전통목가구의 연륜연대측정 : 장(欌)과 반닫이 사례연구)

  • Park, Won-Kyu;Kim, Yo-Jung
    • Journal of the Korean Wood Science and Technology
    • /
    • v.33 no.3 s.131
    • /
    • pp.1-10
    • /
    • 2005
  • Tree-ring chronologies can be used to date historical buildings or furnitures by matching them with chronologies of living trees. Tree-ring dating gives a calendar year to each tree ring and produces the cutting dates of logs or woods. In this study, we intend to extend our tree-ring dating applications to Korean furnitures. As a case study, we examined two traditional furnitures, one cabinet 'Jang' and the other chest, 'Bandaji'. The cutting date of the cabinet woods was A.D. 1839. The date of the outmost ring in the chest was A.D. 1904. Due to no bark present, the cutting date of the chest was only estimated as $1930{\pm}10$ by 'sapwood rings' estimation method. Ring-width pattern of the latter one also indicated that the origin of the chest must be Kangwon province. This case study suggests that tree-ring dating would be a useful and accurate method to identify the critical dates for the chronicles of Korean traditional furnitures.

Differences of Soil Enzyme Activity after Incorporation with Chinese Milk Vetch Litter Cut at Different Growth Stages

  • Lee, Ji-Hyun;Shim, Sang-In
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.52 no.3
    • /
    • pp.341-347
    • /
    • 2007
  • Chinese milk vetch (CMV) is a winter legume that is commonly used as cover crop in Korea. Kill date of cover crop for addition into soil affects N content in cover crop and N availability in soil. This study was conducted to evaluate the effect of CMV as green manure cover crop according to kill dates before growing corn without artificial fertilizer. Top of CMV cut three times on 13 April, 27 April, and 11 May were added into soil at a rate of 600 kg per 10a. Sugar content in CMV litter was persistently decreased from mid-April to late-May. The decrease of sugar content might be due to the transformation into starch and/or other storage or structural constituents. The decreased amount of sugars was greater than 12% and the increased amount of starch was less than 0.2%. Concentration of $NH_4^+$ in soil treated by CMV litter cut on May 11 was slightly higher than that in the treatment with early-cut (April 13) CMV, the concentration at 28 and 49 DAT (days after treatment) was higher in the treatment with late-cut CMV litter. Regardless of cut (kill) date of CMV, the phosphatase activity in the treatment of CMV litter was higher compared to the untreated control. Soil dehydrogenase activity was increased steadily by addition of CMV litter implying total microbial activities in the soil were increased. Our results demonstrate that the status of cover crop species at kill date is an important factor influencing soil enzyme activities derived from microorganisms. Therefore, the optimal kill date of cover crop should be examined to improve the efficiency of cover crop as green manure crop regarding the practical sequence in cropping system.

Visualization of American Options Using the Roll-Geske-Whaley Model

  • Chew Shu Ling Belinda;Sherlyn, Chen-Wanhui;Fei, Tan-Toh;Edmond C. Prakash;Edmund M-K. Lai
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.106.1-106
    • /
    • 2001
  • American options no doubt is invariably more popular than European options, due to the fact that it gives the owner the option to exercise a contract before and up to the expiration date, unlike an European option, which only allows the owner to exercise a contract on the date of expiration. Owing to its popularity, many methods like the binomial numerical method and the pseudo American method have been devised for computing of the value of the American options. The aim of this research is to develop an effective 3-dimensional visualization for American option portfolio based on the Geske-Roll-Whaley model. It is obvious that it is extremely tedious and unadvisable for researchers to interprte chunks of data by looking at graphs or pie charts, which are simple but not effective for analyzing important dta. Hence, the generation of the Geske-Roll-Whaley ...

  • PDF

Tree-Ring Dating of Coffin Woods Excavated from Shinnae-dong in Seoul, Korea

  • Lee, Kwang-Hee;Son, Byung-Hwa;Park, Won-Kyu
    • Journal of the Korean Wood Science and Technology
    • /
    • v.41 no.5
    • /
    • pp.406-414
    • /
    • 2013
  • This study aims to date wooden coffins excavated from graves in Shinnae-dong, Seoul, South Korea, using dendrochronology. The species of woods used to make the coffins were identified as Pinus densiflora S. et Z., one of the major conifers in Korea. Of 12 graves, 10 were successfully dated using various red-pine chronologies of South Korea. Due to the absence of the last-formed tree ring before felling, the number of sapwood rings, used to obtain likely cutting dates, had to be estimated. The terminus post quem for two coffins without plaster frames were AD 1548 and AD 1571, respectively. Eight coffins with plaster frames yielded estimated dates from AD 1664 to AD 1799. The tree-ring dates indicated that the coffins with plaster frames in Shinnae-dong were constructed approximately 100 years later than those without plaster frames.

A SCHEDULING TECHNIQUE FOR MULTIPLE RESOURCE ALLOCATION TO MULTIPLE PROJECTS IN CONSTRUCTION

  • K Ananthanarayanan;Murali Jagannathan
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.201-208
    • /
    • 2011
  • Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.

  • PDF

Machine Scheduling Models Based on Reinforcement Learning for Minimizing Due Date Violation and Setup Change (납기 위반 및 셋업 최소화를 위한 강화학습 기반의 설비 일정계획 모델)

  • Yoo, Woosik;Seo, Juhyeok;Kim, Dahee;Kim, Kwanho
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.3
    • /
    • pp.19-33
    • /
    • 2019
  • Recently, manufacturers have been struggling to efficiently use production equipment as their production methods become more sophisticated and complex. Typical factors hindering the efficiency of the manufacturing process include setup cost due to job change. Especially, in the process of using expensive production equipment such as semiconductor / LCD process, efficient use of equipment is very important. Balancing the tradeoff between meeting the deadline and minimizing setup cost incurred by changes of work type is crucial planning task. In this study, we developed a scheduling model to achieve the goal of minimizing the duedate and setup costs by using reinforcement learning in parallel machines with duedate and work preparation costs. The proposed model is a Deep Q-Network (DQN) scheduling model and is a reinforcement learning-based model. To validate the effectiveness of our proposed model, we compared it against the heuristic model and DNN(deep neural network) based model. It was confirmed that our proposed DQN method causes less due date violation and setup costs than the benchmark methods.

Effect of Planting Date and Cultivation Method on Soybean Growth in Paddy Field (파종기와 재배방법에 따른 논 재배 콩의 품종별 생장분석)

  • Cho Joon-Hyeong
    • Korean Journal of Organic Agriculture
    • /
    • v.14 no.2
    • /
    • pp.191-204
    • /
    • 2006
  • This study was conducted to identify the effect of planting date and cultivation method on soybean growth and yield in paddy field. The plant height of soybeans in single cropping(SC) was higher than those in cultivating after barley culture (CB). Considering planting date and cultivation method, plant height tend to be higher in SC with level row cultivation(LR) and in CB with high ridge cultivation(HR). In this SC method, nodule formation in LR was better than in HR, but number of nodules of cv. Hwangkeumkong was highest, regardless of planting date and cultivation method. In the progress of growth stage, leaf areas of all cultivars were distinctively increased in CB than in SC. However, dry weight of top plants and roots in SC was comparably higher than that in CB due to growing periods of the soybeans. In cultivation methods, general type of dry weight of top plants was higher in LR than in HR, however, root dry weight was via verses. Growth responses varied depending on cultivars, cultivation methods, and planting date and these factors affected to shoot root (T/R) ratio. The T/R ratios in LR and SC were higher than those in HR and CB. In R8 stage, number of pods and ripened seed varied depending on cultivars. cv. Hwaeomputkong, which showed early maturing trait, was lowest. However, both yield factors tended to be higher in HR and CB than in LR and SC. The ratios of ripened seeds percentage of cv. Hwangkeumkong and cv. Eunhakong were higher in CB than in SC. However, yields of cv. Daewonkon and cv. Taekwangkong were higher in CB than in SC.

  • PDF

Order Promising Methods Considering Scheduling and Order Releasing in Parallel Machine Shops (병렬 기계 공정에서 일정 계획과 투입 계획을 고려한 납기 산정에 관한 연구)

  • Shim, Sang-Oh;Lee, Geun-Cheol
    • Korean Management Science Review
    • /
    • v.29 no.3
    • /
    • pp.157-168
    • /
    • 2012
  • In this study, we consider an order promising problem at parallel machine shops where orders arrive dynamically. We develop methods for the problem, which instantly quote the due-dates of arrived orders. In this study, we first propose methods which can estimate flow times of orders, in which the current and future inventory status as well as the specific scheduling scheme used in the shop are taken into account, and then the due-dates are set by the order promising methods using the estimation results. The quoted due-dates of orders are compared with the actual completion times of those which are obtained from the simulation runs. The series of computational experiments show that the superior performance of the proposed methods in terms of the accuracy of due-date quotation.