The Pullout Behavior of a Large-diameter Batter ]Reaction Piles During Static Pile Load Test for a Large Diameter Socketed Pipe Pile (대구경 말뚝의 정재하시험시 대구경 경사반력말뚝의 인발거동)

  • 김상옥;성인출;박성철;정창규;최용규
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.1
    • /
    • pp.5-16
    • /
    • 2002
  • The pullout behavior of large-diameter steel pipe piles(diameter = 2,500mm, length = 38~40m), which were designed as compression piles but used as reaction piles during a static compression load test on a pile(diameter = 1,000m, length = 40m), was investigated. The steel pipe piles were driven by 20m into a marine deposit and weathered soil layer and then socketed by 10m into underlying weathered and soft rock layers. The sockets and pipe were filled with reinforced concrete. The steel pipe and concrete in the steel pipe zone and concrete and rebars in the socketed zone were fully instrumented to measure strains in each zone. The pullout deformations of the reaction pile heads were measured by LVDTs. Over the course of the study, a maximum uplift deformation of 7mm was measured in the heads of reaction piles when loaded to 10MN, and 1mm of residual uplift deflection was measured. In the reaction piles, about 83% and about 12% of the applied pullout loads were transferred in the weathered rock layer and in the soft rock layer, respectively. Also, at an uplift force of 10MN, shear stresses due to the uplift in the weathered rock layer md soft rock layer were developed as much as 125.3kPa and 61.8kPa, respectively. Thus, the weathered rock layer should be utilized as resisting layer in which frictional farce could be mobilized greatly.

Reliability Estimation of Static Design Methods for Driven Steel Pipe Piles in Korea (국내 항타강관말뚝 설계법의 신뢰성평가)

  • Huh, Jung-Won;Park, Jae-Hyun;Kim, Kyung-Jun;Lee, Ju-Hyung;Kwak, Ki-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.12
    • /
    • pp.61-73
    • /
    • 2007
  • As a part of Load and Resistance Factor Design(LRFD) code development in Korea, in this paper an intensive reliability analysis was performed to evaluate reliability levels of the two static bearing capacity methods for driven steel pipe piles adopted in Korean Standards for Structure Foundations by the representative reliability methods of First Order Reliability Method(FORM) and Monte Carlo Simulation(MCS). The resistance bias factors for the two static design methods were evaluated by comparing the representative measured bearing capacities with the design values. In determination of the representative bearing capacities of driven steel pipe piles, the 58 data sets of static load tests and soil property tests were collected and analyzed. The static bearing capacity formula and the Meyerhof method using N values were applied to the calculation of the expected design bearing capacity of the piles. The two representative reliability methods(FORM, MCS) based computer programs were developed to facilitate the reliability analysis in this study. Mean Value First Order Second Moment(MVFOSM) approach that provides a simple closed-form solution and two advanced methods of FORM and MCS were used to conduct the intensive reliability analysis using the resistance bias factor statistics obtained, and the results were then compared. In addition, a parametric study was conducted to identify the sensibility and the influence of the random variables on the reliability analysis under consideration.

A Field Test Study on Skin Friction Behavior of Driven Steel Piles (항타강관말뚝의 주면마찰저항 특성에 관한 현장실험 연구)

  • Lee, Min-Hee;Lee, Chung-Sook;Jung, Chang-Kyu;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.575-582
    • /
    • 2005
  • Static pile load tests for three instrumented driven steel pipe pies were performed. Based on the distributions of pile axial loads along the pile depth, Characteristics of unit skin friction were analyzed.

  • PDF

Dynamic Behavior of Large Diameter steel Pipe Piles during driving (대구경 강관말뚝의 항타시 동적 거동)

  • 이영남;이종섭
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.4
    • /
    • pp.141-148
    • /
    • 2000
  • For the construction of 4.8km long Multi-Purpose Jamuna Bridge in Bangladesh, 2 or 3 large diameter open-ended steel pipe piles were used for the foundation of piers. A total of 123 piles were driven for 50 piers and 2 test piles from the river bed through the normally-consolidated upper sand layer and rested n top of gravel layer. Two types of piles, having 3.15 or 2.50m diameter and variable wall thickness in the range of 40 to 60mm, were driven to the depths of 69 to 74m with the rake of 6:1 by connecting 2 or 3 pieces of short piles. Dynamic pile tests were performed on 24 selected piles during pile driving and soil plug length inside the pile was also measured after driving of each short section.These piles were plugged with soil to, though slightly affected by pile diameters, about 75% of total length of pile driven. Active plug at the tip of pile contributed substantial amount of inner skin friction to the total capacity. Piles soon after driving showed a skin-friction dominant pile behaviour, tat is, 90% of total capacity being developed by skin resistance. Quakes values and Smith damping factors were almost constant regardless of pile diameters. This result reflects the influence of uniform soil condition at the site.

  • PDF

Driveability and Bearing Capacity Characteristics Analysis of 590 MPa Grade High Strength Steel Pipe Pile at Songdo Area through Dynamic Load Tests (동재하시험결과 분석을 통한 송도지역 590MPa급 고강도 강관말뚝의 항타관입성 및 지지력 특성 분석)

  • La, Seung-Min;Hong, Bong-Kyun;Yoo, Han-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.2
    • /
    • pp.81-90
    • /
    • 2011
  • Domestic usage of high strength steel for pile has been limited to steel with yield strength (YS) of 490 MPa. However, design and construction cases abroad show beneficial usage of steel pipe with YS ranging in 500~700 MPa. In this study, YS 590 MPa steel pipe has been tested for driven pile foundation in Songdo area. Pile dynamic analysis (PDA) was carried out for 18 piles of which 16 piles have been reviewed for comparison of the PDA test results with those of GRLWeap analysis using SPT N value. Back analysis of PDA analysis was also carried out to narrow the deviation of standard SPT N value used in GRLWeap analysis. A regression equation is suggested for the shaft and toe resistance according to SPT N values for future GRLWeap analysis that can be used in the designing stage at Songdo area.

A Study of Field Loading Tests for Derivation of Load Transfer Curves of the Driven Steel Pipe Piles (타입 강관말뚝 하중전이곡선 도출을 위한 현장재하시험 연구)

  • Lim, Jong-Seok;Choi, Yong-Kyu;Ha, Hyuk;Sim, Jong-Sun;Park, Jong-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1188-1194
    • /
    • 2008
  • As computation technologies has developed, the analysis using load transfer is mainly performed. But most of the functions used in the above program has been developed in foreign countries. Also in our nation, lots of studies concerning load transfer are being researched. The investigation of suitability about the piles installed in our grounds, however, is required as functions acquired experientially, basing on the piles installed in foreign grounds. In this background, the load transfer curve required to use load transfer method on its design through the analysis of field tests inside our nation intends to be made, on which this research focuses.

  • PDF

A Study on the Derivation of Load Transfer Curves of the Driven Steel Pipe Piles by Soil (타입강관말뚝의 토질별 하중전이곡선 도출에 관한 연구)

  • Lim, Jong-Seok;Choi, Yong-Kyu;Sim, Jong-Sun;Park, Jong-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.539-550
    • /
    • 2009
  • As computation technologies has developed, the analysis using load transfer is mainly performed. But most of the functions used in the above program has been developed in foreign countries. Also in our nation, lots of studies concerning load transfer are being researched. The investigation of suitability about the piles installed in our grounds, however, is required as functions acquired experientially, basing on the piles installed in foreign grounds. In this background, the load transfer curve required to use load transfer method on its design through the analysis of field tests inside our nation intends to be made, on which this research focuses.

  • PDF

A Study of Field Loading Tests for Derivation of Load Transfer Curves of the Driven Steel Pipe Piles (타입 강관말뚝 하중전이곡선 도출을 위한 현장재하시험 연구)

  • Lim, Jong-Seok;Choi, Yong-Kyu;Sim, Jong-Sun;Park, Jong-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.760-766
    • /
    • 2008
  • As computation technologies has developed, the analysis using load transfer is mainly performed. But most of the functions used in the above program has been developed in foreign countries. Also in our nation, lots of studies concerning load transfer are being researched. The investigation of suitability about the piles installed in our grounds, however, is required as functions acquired experientially, basing on the piles installed in foreign grounds. In this background, the load transfer curve required to use load transfer method on its design through the analysis of field tests inside our nation intends to be made, on which this research focuses.

  • PDF

Design Efficiency Improvement Method Research for High Strength Steel Pipe Pile at Gwangyang Area (광양지역 고강도 강관 항타말뚝의 설계효율 향상 방안 연구)

  • La, SeungMin;Yoo, Hankyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6C
    • /
    • pp.231-240
    • /
    • 2011
  • Various pile load tests were carried out at Gwangyang district for 10 different piles in order to analyze the characteristcs of steel pile using high strength steel and high driving energy. Pile drivability results showed that PHC piles needed highest total blow count even with the shortest pile length and high strength steel pipe piles showed smallest total blow count eventhough driven to a more hard ground condition with longer pile length. Pile dynamic analysis results showed that for PHC pile and general steel pipe pile the allowable pile design load was decided by the allowable material strength but for high strength steel pipe pile the design load can be decided according to the ground bearing capacity. Static load test and load transfer test results showed that the pile design efficiency could be improved over 80% allowing lesser number of piles necessary for a more economical solution. Set-up effects was analyzed and regression equation for the site ground condition was derived. Bearing capacity was checked with widely used design equation and the limitation of current design method and future technology development on this subject is dicussed in this paper.