• Title/Summary/Keyword: drainage facility

Search Result 142, Processing Time 0.026 seconds

A Study on a Drainage Facility of the Western Shore in Wolji Pond (월지(月池) 서측 호안의 출수시설(出水施設)에 관한 고찰)

  • Oh, Jun-Young
    • Korean Journal of Heritage: History & Science
    • /
    • v.51 no.3
    • /
    • pp.72-87
    • /
    • 2018
  • This study highlights a drainage gate and a ditch, which existed around the whole area of the western shore of Wolji Pond(月池) and focuses on a possible connection between the drainage facility on the western shore and the historical drainage system of Wolji Pond. Specifically, it primarily considered locations and the form of a drainage gate, the relationship between northwestern ditch of Wolji Pond and the drainage gate, and the establishment period and the character of the drainage facility on the western shore. The drainage gate found in excavation in 1975 is determined as the same facility as Surakgu(水落口) recorded on an actual measurement drawing, 1922. Therefore, it is highly probable that there were already the drainage facility in the western shore of Wolji Pond before the 1920s. The drainage gate constructed by processing rectangular stones has four drainage holes for controlling water level. The way of the drainage through the drainage holes is the same as that of the northern shore of Wolji Pond. From a cadastral map drawn in 1913, it is found that the ditch existed in northwest of Wolji Pond. The ditch was proximate to the drainage gate and shared the same axes. Hence, the ditch and the drainage gate are determined as a organic facility connected to the drainage system of Wolji Pond. In particular, the ditch existed in northwest of Wolji Pond is the basis for judging that the drainage facility in the western shore were established before the 1910s. Water flowed in through drainage holes of the drainage gate is drained into the northwest of Wolji Pond, through the ditch. The establishment period and the intention of the drainage facility on the western shore can be interpreted in two aspects. First, they might be 'a agricultural irrigation facility in the Joseon era', given that Wolji Pond was recorded as a agricultural reservoir, and that the whole northwestern area of Wolji Pond was used as farm land areas. Second, they might be 'a drainage facility for controlling the water level in creating Wolji Pond', given that the drainage gate was annexed to the lower shore forming the waterline of Wolji Pond, and that the hight of drainage holes on top of the drainage gate was similar to the full water level of Wolji Pond. Considering the related grounds and circumstance, the latter possibility is high.

The Prototype and Structure of the Water Supply and Drainage System of the Wolji Pond During the Unified Silla Period (통일신라시대 월지(月池) 입·출수 체계의 원형과 구조)

  • Kim, Hyung-suk;Sim, Woo-kyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.4
    • /
    • pp.124-141
    • /
    • 2019
  • This research explored the relationship between the water quality issue of Wolji Pond (Anapji Pond) with the maintenance of the channel flow circulation system. The water supply and drainage system closely related to the circulation system of pond has been reviewed, rather than the existing water supply and drainage system that has been analyzed in previous studies. As a result of reviewing the water supply system, it has been learned that the water supply system on the southeastern shore of Wolji Pond, being the current water supply hole, has been connected to the east side garden facility (landscaping stone, curved waterway, storage facility of water) between the north and south fence and the waterway. This separate facility group seems to have been a subject of the investigation of the eastern side of Wolji Pond, with the landscaping stones having been identified in the 1920's survey drawings. The water supply facility on the southeastern shore, being the suspected water supply hole, seems to have some connection with the granite waterway remaining on the building site of Imhaejeon (臨海殿) on the southern side of Wolji Pond. It is inferred that it provides clean water, seeing that the slope towards the southwestern shore of Wolji Pond becomes lower, the landscaping stones have been placed in the filter area, and it is present in the 1920's survey drawings and the water supply hole survey drawing of 1975. The water drainage facility on the northern shore is composed of five stages. The functions of the wooden waterway and the rectangular stone water catchment facility seem not to be only for the water drainage of Wolji Pond. In light of the points that there are wood plugs in the wooden waterway and that there is a water catchment facility in the final stage, it is judged that the water of Balcheon Stream (撥川) may be charged in reverse according to this setup. Namely, the water could enter and exit in either direction in the water drainage facility on the northern shore It also seems that the supply to the wooden waterway could be opened and shut through the water catchment facility of rectangular stone group as well. The water drainage facility on the western shore is very similar to the water drainage facility on the northern shore, so it is difficult to avoid the belief that it existed during the Silla Dynasty, or it has been produced by imitating the water drainage facility on the northern shore at some future point in time. It seems to have functioned as the water drainage facility for the supply of agricultural water during the Joseon Dynasty. The water supply and drainage facilities in Wolji Pond have been understood as a systematized distribution network that has been intertwined organically with the facility of Donggung Palace, which was the center of the Silla capital. Water has been supplied to each facility group, including Wolji Pond, through this structure; it includes the drainage system connecting to the Namcheon River (南川) through the Balcheon Stream, which was an important canal of the capital center.

Design and Implementation of a GPS-based Drainage Management System (GPS 기반 배수설비 관리 시스템 설계 및 구현)

  • Kim, Ji-Seong;Jang, Si-Woong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.05a
    • /
    • pp.126-129
    • /
    • 2021
  • The existing drainage facility management system is not systematically computerized, and it is difficult to manage each drainage facility on-site due to insufficient information and location management. Currently, in the current drainage system management, repair technicians recognize the information of the drainage facility by recognizing the QR code at the site. These methods have difficulty locating QR codes in the field, and the problem is that they incur additional maintenance costs due to loss and breakage of QR code attachments. The GPS-based drainage management system proposed in this paper stores and manages each drainage facility's data including GPS information, allowing applications to use the location and information of drainage facilities based on user location data.

  • PDF

Numerical Study on Ground Vibration Reduction Performance of Concrete Drainage Protection Facility (콘크리트 배수관로 보호구의 지반진동 저감 성능에 관한 수치해석적 연구)

  • Jung, Seung-Won;Kim, Jung-Gyu;Kim, Jun-Ha;Baluch, Khaqan;Kim, Jong-Gwan
    • Explosives and Blasting
    • /
    • v.39 no.4
    • /
    • pp.12-21
    • /
    • 2021
  • In this study, a series of FEM numerical analyses was conducted to compare the resistance performance of concrete drainage protection facility to blast vibration. Two different types of ㅁ-shaped protection facility, which are suggested in the study, were compared to the traditional ㄷ-shaped one. In the analyses, the vibration resistances of the three protection facilities were evaluated under the varying conditions of the standoff distance from the explosion and charge weight per delay. As a result, it was found that the two proposed types of drainage protection facilities are superior to the traditional one in the vibration reduction performance.

Road Drainage Facility Design Methods apply on the Hydraulic and Hydrologic Analysis (수리·수문기술을 적용한 도로 배수시설 설계 기법)

  • Lee, Man-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.4
    • /
    • pp.419-430
    • /
    • 2012
  • Due to the calculation difficulty on the hydraulic and hydrologic analysis for road drainage facilities design, these analysis techniques are not applicable. This study's result are development of minutely rainfall-intensity equation suitable for road drainage area, verification of rainfall-runoff model joining kinematic wave theory for road drainage area, computational model based GUI for road surface drainage facilities spacing and culvert's size decision and various road drainage channel design. Applicable test on the developed model is proceed, result that in case of road surface dranage facilities spacing is narrower 6~65% than present spacing calculation method, in other case of road cross dranage facilities size is bigger 6~140% than present size decision method.

Identification of Major Fungi and Bacterial Species in Solid Medium Drainage for Circulating Hydroponics System (수경재배 배액 재이용을 위한 주요 곰팡이 및 박테리아 종 파악)

  • Lee, Donggwan;Son, Jinkwan;Kang, Taegyeong;Jang, Jaekyung;Park, Minjung;Lee, Taeseok;Lim, Ryugap
    • Journal of Environmental Science International
    • /
    • v.29 no.11
    • /
    • pp.1109-1123
    • /
    • 2020
  • In this study, the amount of harmful fungi and bacteria contained in the drainage and culture medium from the paprika hydroponic facility is identified. In addition, by proposing the necessity of effective purification of discharged drainage, this study attempted to confirm the possibility of drainage reuse. Finally, this study provides basic data on the basis for calculating the need for purification facilities in the future, as well as improvements in horticulture facility for sustainable agriculture. As a result of the analysis, a total of 12 types of fungi were detected in paprika medium and 10 types of fungi were detected in the drainage, and their densities were 130 and 68, respectively. Among the fungi detected in the media and drainage of the paprika hydroponic facility, the fungi with the highest detection frequency are Fusarium, Phytophthora, and Pythium. In the case of bacteria, a total of 2 types of bacteria were detected in the paprika facilities, and the density was 28 and 23, respectively. Therefore, in order to reuse the drainage and settle the circulating hydroponic cultivation system, a water treatment process capable of appropriate treatment is required.

Effective Application Method for Pollution Mitigation Facility of Highway Runoff (고속도로 비점오염저감시설의 효율적 적용 방안)

  • Lee, Yong-Bok;Choi, Sang-Il;Jung, Hyun-Gyu;Bae, Sei-Dal;Jung, Sun-Kook
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.44 no.6
    • /
    • pp.1264-1271
    • /
    • 2011
  • To build environmentally friendly highways, we testes suitability for unique characteristics of pollution mitigation facility around the highways by evaluating optimal selections and implementation methodologies to minimize loan of non-point pollution substances into water-ways. To do this we categorized EIA target highways into three types ; big drainage basin, small drainage basin, and bridge section as to minimize non-point pollution of highway runoff. The terms of selected facility test based on the Natural and Manufactured Treatment Device were removal efficiency of TSS, BOD, COD, T-N, T-P, compatibility of site selection, economic feasibility, maintenance convenience, and the final mitigation facility.

A Study for selecting the Highway Sites' Best Management Practice for Nonpoint Source Pollution (고속도로 현장별 비점오염 저감시설 선정방안 연구)

  • Lee, Yong-Bok;Choi, Sang-Il;Park, Kye-Su;Seong, Il-Jong;Jung, Sun-Kook
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.6
    • /
    • pp.857-866
    • /
    • 2011
  • This research categorized EIA target highways into following three types in order to minimize non-point source pollution from highway runoff. 1. Big drainage basin. 2. Small drainage basin. 3. Bridge section. The Natural, Filter and Swirl-Type devices were evaluated in terms of removal efficiency of TSS, BOD, COD, T-N, T-P, compatibility of site selection, economic feasibility, and maintenance convenience through which the final BMP was selected. According to the removal efficiency result, the area of Big and Small Drainage basin and bridge section had higher removal efficiency with natural facility than that of the Filter or Swirl-Type device. To make appropriate selection of highways'BMP for non-point source pollution, this study will aim to contribute to building more environmentally friendly highways by proposing the selection process that is made of 5 stages. 1. Selecting the target drainage basin. 2. Selecting the land for the mitigation facility. 3. Analysing the ease of maintenance. 4. Technically evaluating each installation. 5. Evaluating the effective implementation methods.

A Study of alternative to rational design of Levee (하천제방의 합리적인 설계 방안)

  • Kim, Jin-Man;Choi, Bong-Hyuck
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.119-123
    • /
    • 2010
  • Causes of the levee collapse are directly or indirectly associated with geotechnical engineering as well as hydraulics. In this paper, literature survey and analysis were conducted to present the alternatives in geotechnical engineering issues for rational levee design. The alternatives include the reasonable river-bed soil utilization and precautions of numerical analysis and slope stability analysis, disruption type and improvement method of drainage facility.

  • PDF

A Study on a Neutralization Treatment Facility Design of an Acid Mine Drainage for Colliery (석탄광 산성항내배수의 중화 처리시설 설계에 관한 연구)

  • 이춘택
    • Journal of the Korean Professional Engineers Association
    • /
    • v.18 no.1
    • /
    • pp.1-17
    • /
    • 1985
  • This report is prepared to assist designers acid mine drainage treatment plants. Example of a treatment facility design is included, delineating general equipment specification and cost breakdowns. The purpose of this outline is to give the designer insight into tile evaluation of possible alternative and justification for choosing a certain method or process and also this report will allow designers to derive and estimated budget number for capital expenditures.

  • PDF