• Title/Summary/Keyword: downstream

Search Result 4,052, Processing Time 0.042 seconds

Assessment of Physical River Disturbances in the Namgang-dam Downstream (남강댐하류의 물리적 하천교란 평가)

  • Kim, Ki-Heung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.3
    • /
    • pp.74-86
    • /
    • 2008
  • To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.

Improvement of river environment in the downstream reaches of dams (댐하류의 하천환경 개선)

  • Ozawa, Takashi
    • Proceedings of the Korean Society of Environment and Ecology Conference
    • /
    • 2003.10a
    • /
    • pp.1-21
    • /
    • 2003
  • I introduce the Flexible Dam Operation (FDO) and some of sediment control techniques In dams which are implemented as trials to avoid or reduce environmental impact of dams on the downstream reaches. The FDO is a dam management method to improve river environment in the downstream reaches by means of the flushing flow, the maintenance flow and so on utilizing a vacant portion of capacity for flood control without interrupting prime flood control function during the rainy/typhoon season. It Is suggested by the guideline of the FDO that EDO should be implemented regularly after the trial for about three years. The basic conception of the FDO is described here. The example of excavation of deposited sediments in check dams and placement of sand ana gravel immediately downstream of the dams and the example of coordinated sediment flushing are described as some of sediment control techniques in dams. Now they are at the stage of experiment and trial. Therefore, it is important to increase examples and establish the technical methodology and the environmental evaluation method for them.

  • PDF

Effects of Eccentric Ratio Between Stationary Upstream Circular Cylinders on Heat Transfer of a Heated Downstream Cylinder (정지된 상류의 원형실린더 사이의 편심률이 후방실린더의 열전달에 미치는 영향)

  • Riu, Gap-Jong;Park, Cheol-Woo;Jang, Chung-Sun
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.28 no.11
    • /
    • pp.1449-1458
    • /
    • 2004
  • The influence of eccentric(=staggeredness) ratio between stationary upstream circular cylinders on heat transfer characteristics of a heated downstream circular cylinder installed in a channel was investigated experimentally. In order to enhance the heat transfer rate of the heated downstream cylinder surface, we have changed the configuration of upstream cylinder. As a result, we were able to obtain local time-averaged convective heat transfer enhancement of the heated cylinder by the relative replacement of upstream cylinder. This is basically attributed to the mean flow structure change, such as flow separation, vortex shedding, and recirculation of the upstream cylinder including the reattachment and new thermal boundary developed at the downstream cylinder which are the results of the increase of the staggeredness ratio.

FLUID-GRANULE MIXED FLOIW DOWNSTREAM OF SCOUR HOLE AT OUTLET OF HYDRAULIC STRUCTURE

  • Kim, Jin-Hong;Shim, Myung-Pil;Kim, Kyung-Sub
    • Water Engineering Research
    • /
    • v.3 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • This study presents the theoretical approach for volume concentration, velocity profile, and granular discharge on the fluid-granule mixed flow downstream of the scour hole at the outlet of the hydraulic structure. Concept of dilatant model was applied for the stress-strain relationships of fluid-granule mixed flow since the flow downstream of the scour hole corresponds to debris flow, where momentum transfers through particle collisions. Mathematical formulations were derived using momentum equation and stress-strain relation of the fluid-granule mixture. Velocity profile under the assumption of uniform concentration over flowing layer showed the downward convex type. Deposition angle of downstream hump was found to be a function of an upstream slope angle, a dynamic friction angle and a volume concentration irrespective of flow itself, Granular discharge and the overflow depth were obtained with given values of inflow rates. Experimental results showed relatively good agreements with theoretical ones.

  • PDF

A Study on Flame Structure of SNG Fuel Part I : Interaction between Flames Downstream (SNG 연료의 화염구조에 관한 연구 Part I : 화염후류간 상호작용)

  • Sim, Keunseon;Lee, Keeman
    • 한국연소학회:학술대회논문집
    • /
    • 2015.12a
    • /
    • pp.53-56
    • /
    • 2015
  • A combined experimental and numerical study has been conducted to investigate the downstream interaction between simulated SNG-air premixed flames in fuel composition of 91% $CH_4$ + 6% $C_3H_8$ + 3% $H_2$. In this study, the effects of fuel molar concentration(lean-rich) and strain rate($a_g$) were major parameters. A main focus is to investigate flames behavior and chemical interaction at flames downstream. The numerical results were calculated by OPPDIF application. The reaction mechanism adopted was USC-II model including C3 reaction.

  • PDF

A Hydroacoustic Survey Analyzing Fish Populations and Their Distribution Upstream and Downstream of Changzhou Dam, China, Based on Spillway Conditions (중국 Changzhou댐의 방수로 운용에 따른 어류밀도와 분포에 관한 음향조사)

  • Tan, Xichang;Kang, Myoung-Hee;Tao, Jiangping;Li, Xinhui;Huang, Daoming
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.44 no.4
    • /
    • pp.403-412
    • /
    • 2011
  • Hydroacoustic surveys were performed to clarify the density and spatial distribution of fish upstream and downstream of Changzhou Dam in the Pearl River, China, with regard to the condition of the spillways. Fish were densely distributed in the forebay of the upstream dam and the average fish density was 0.22 individuals/$m^3$ under open spillways on 24 June 2010, but when the spillways were closed on 25 June 2010, the fish in the upstream dam dispersed and the average fish density decreased to 0.007 individuals/$m^3$. Meanwhile, the average fish density in the downstream region was 0.28 individuals/$m^3$ before the spillway was opened on 24 May 2010, but it decreased to 0.08 individuals/$m^3$ on 26 June, just after the spillway was closed. The vertical distribution of fish upstream of the dam was not consistent. The target strength (TS) of fish upstream of the dam was larger than that of fish in the downstream region, although the distribution of TS was similar between the upstream and downstream regions. Therefore, we concluded that while numerous fish could swim to the upstream region while the spillways were open, closed spillways obstructed fish migrating upward from the downstream region.

Effective Method for Remodeling of Deteriorated Agricultural Reservoirs (노후화된 농업용 저수지의 효율적인 리모델링 방법)

  • Lee, Young Hak;Lee, Dal Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.4
    • /
    • pp.43-52
    • /
    • 2017
  • This study analyzed pore water pressure, earth pressure and settlement through laboratory model tests in order to suggest the effective remodeling method in the case of reinforcing the upstream and downstream slope of deteriorated reservoirs that has no cores and filters or is not functional. The method of remodeling the upstream slope using dredge soil is first prevent seepage by installing the core, and the leakage water can be rapidly discharged through a filter installed on the downstream slope. Therefore, it is considered a highly efficient method of remodeling that reduces piping phenomena and increasing the storage capacity of the reservoir. The variation of earth pressure without the core and filter was greater than with it, while the change largely showed in the upstream slope, the downstream slope did not show any significant changes. The remodeling method of the downstream slope with the core appeared differently pore water pressure depending on the presence of the vertical and horizontal filters. In the upstream slope, the pore water pressure rises sharply, the base and middle gradually increased, and the downstream slope appeared small. The pore water pressure of embankment with a vertical and horizontal filter will be smaller than without it. The remodeling of deteriorated reservoir that does not have the function of the filter, the vertical filter must be installed in a position that is higher than the expected seepage line by removing portions of the downstream slopes. Since the horizontal filter is an important structure that provides stable drainage during an earthquake or concentrated leak, it is necessary to examine any change in the seepage characteristics depending on the filter intervals via three-dimensional finite element analysis, and it should be connected to the tow-drain to reduce the possibility of the collapse of the reservoir.

Performance Analysis of Asynchronous 2.5 Gbps / 622Mbps Optical Subscriber Network with Manchester coded Downstream and NRZ upstream re-modulation (맨체스터 부호로 코딩된 하향신호의 재변조를 이용한 비동기 2.5 Gbps / 622 Mbps 광가입자 망의 성능 분석)

  • Park, Sang-Jo;Kim, Bong-Kyu
    • Korean Journal of Optics and Photonics
    • /
    • v.20 no.3
    • /
    • pp.143-147
    • /
    • 2009
  • We propose an asymmetrical 2.5 Gbps / 622 Mbps bidirectional optical subscriber network with Manchester coded downstream and NRZ (Non-Return-to-Zero) upstream remodulation. The proposed system has important characteristics in the optical network unit (ONU): it does not require a light source or the usual control circuits such as wavelength control and output power control, and it is possible to use a synchronization scheme between upstream and downstream data. We theoretically analyze BER(Bit Error Rate) performance of upstream data remodulated with Manchester coded downstream according to the types of NRZ downstream data and perform simulations with MATLAB. The BER performance and the receiver sensitivity have been improved by 3 dB by adjusting threshold levels compared to the conventional receiver. The results have shown the remodulation scheme with Manchester coded downstream could be a useful technology for asynchronous and asymmetric optical subscriber networks with low cost and simple structures.