• Title/Summary/Keyword: diversion length

Search Result 10, Processing Time 0.024 seconds

Analytical study on seepage behavior of a small-scale capillary barrier system under lateral no-flow condition

  • Byeong-Su Kim
    • Geomechanics and Engineering
    • /
    • v.35 no.1
    • /
    • pp.13-27
    • /
    • 2023
  • The model production for large-scale (lateral length ≥ 2.0 m) capillary barrier (CB) model tests is time and cost-intensive. To address these limitations, the framework of a small-scale CB (SSCB) model test under the lateral no-flow condition has been established. In this study, to validate the experimental methodology of the SSCB model test, a series of seepage analyses on the SSCB model test and engineered slopes in the same and additional test conditions was performed. First, the seepage behavior and diversion length (LD) of the CB system were investigated under three rainfall conditions. In the seepage analysis for the engineered slopes with different slope angles and sand layer thicknesses, the LD increased with the increase in the slope angle and sand layer thickness, although the increase rate of the LD with the sand layer thickness exhibited an upper limit. The LD values from the seepage analysis agreed well with the results estimated from the laboratory SSCB mode test. Therefore, it can be concluded that the experimental methodology of the SSCB model test is one of the promising alternatives to efficiently evaluate the water-shielding performance of the CB system for an engineered slope.

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF

Numerical study of dividing open-channel flows at bifurcation channel using TELEMAC-2D (TELEMAC-2D모형을 이용한 개수로 분류흐름에 대한 수치모의 연구)

  • Jung, Dae Jin;Jang, Chang-Lae;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.7
    • /
    • pp.635-644
    • /
    • 2016
  • This study investigates variation of flow characteristics due to variation of branch channel width and discharge ratio at bifurcation channel using 2D numerical model. The calculated result considering secondary flow is more accurate and stable than without considering one. The diversion flow rate ($Q_3/Q_1$) is reduced by flow stagnation effect according to the interaction of the secondary flow and flow separation zone in branch channel. The less upstream inflow or the lower upstream velocity, the bigger variation of diversion flow rate by changing branch channel width. At uniform downstream boundary condition, the rate of change in Froude number of downstream of main channel($Fr_2$)-diversion flow rate ($Q_3/Q_1$) relations is similar about -2.4843~-2.6675 when branch channel width ratio (b/B) is decreased. At uniform diversion flow rate ($Q_3/Q_1$) condition, the width of recirculation zone in branch channel is decreased when branch channel width ratio (b/B) is decreased. The less upstream inflow in the case of increasing branch channel width or the narrower branch channel width in the case of increasing upstream inflow, the bigger reduction ratio of recirculation zone width. At uniform inflow discharge ($Q_1$) condition, diversion flow rate, the width and length of recirculation zone in branch channel are decreased when branch channel width ratio (b/B) is decreased.

Rock Support Design of Bakun Tunnelling Project in Sarawak, Malaysia (바쿤 가배수로 터널의 최적지보설계)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.8 no.4
    • /
    • pp.296-306
    • /
    • 1998
  • Ongoing huge Bakun Hydropower project is including the construction of a 210 m height hydroelectric rockfill dam with an installed capacity of 2,520 MW and a power transmission system connecting to the existing networks between Sarawak and peninsula Malaysia. In order to allow the main dam construction during the dry season, the Ballui river will have to be detoured through 3 concrete lined diversion tunnels with an internal diameter of 12 m and a length of 1,400 m each. The geology of Bakun site belongs to the several thousand meters thick Belaga formation deposited from the late Cteteceous to the early Teriary in the Northwest Borneo geosyncline. The orientation of the bedding plane, strike at N55$^{\circ}$E to N70$^{\circ}$E and dip at 50$^{\circ}$SE to 70$^{\circ}$SE, is developed uniformly in Bakun sedimentary rocks. Rock mechanical characteristics of Bakun site have been classified into 4 rock mass types(RMT) depending on the degree of weathering and the occurrence of rock jointing with RMR. Graywacke(Sandstone) as well as Shale can take place together in the same rock mass type if their rock mass properties are similar. It was summarized the rock support type and support system design of underground diversion tunnels in view of rock mechanics.

  • PDF

Design of Sedimentary Rock Slopes in River Diversion Works (가배수로 터널공사의 퇴적암 사면 안정화 설계)

  • Jee, Wang-Ruel
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.17-32
    • /
    • 1998
  • The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia, The power station will consist of a 210m height concrete faced rockfill dam. During the construction of the dam and the power facilities the Balui river has to be diverted by three diversion tunnels with a length of some 1,400m each. The inner diameter of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet and outlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four. defined Rock Mass Types (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each 'global' slope without any rock support and shotcrete system. In the second stage, it is calculated for each 'local'slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

Diversion of locomotor activity rhythm and neural control by Azadirachtin in Leucophaea maderae (Azadirachtin에 의한 Leucophaea mederae의 활동주기 변화와 뇌신경에 의한 조절관계 조사)

  • 한상진
    • The Korean Journal of Zoology
    • /
    • v.32 no.4
    • /
    • pp.441-449
    • /
    • 1989
  • Azadirachtin은 Leucophaeq muderae (Fabricius연 하루 활동주기길이를 0.16 $\pm$ 0.03 h 단축시켰으며, 실험동물의 40 %에서 리듬의 Splitting현상이 관찰되었다. 하루에 두개의 활동주기를 보이는 Splitting현상은 서로 180$^{\circ}$를 유지하여 나타났고, 이는 동물의 실험 전의 본래 주기길이가 평균보다 더 긴 주기를 지닌 동물에게 주로 나타났다. 또한 활동주기의 Splitting현상을 보이는 동물의 안구와 뇌신경(optic lobe) 절단수술 후 Splitting이 사라짐으로써 Azadirachtin이 뇌신경에 자극을 주어 Splitting을 야기시켰으며, 한쌍의 optic lobe 중 어느 한쪽만으로도 동물의 활동주기 조절가능성이 있다는 것이 본 실험을 통하여 밝혀졌다. Azadirachtin shortens the period length of the locomotor activity rhythm in the circadian rhythm of Leucophoeo maderae and induces splitting of this rhythm in ho components in about 40% of the animals. The phase relationship between the ho components is 180$^{\circ}$Both shortening of period and splitting are more pronounced in animals processing longer periods before the injection of azadirachtin. Splitting disappears after the surgical transection of optic lobe.

  • PDF

Improvement study of river-crossing structures in geyongnam prefecture (경남의 지방하천에 설치된 하천횡단구조물의 현황과 개선방안)

  • Kim, Ki-Heung;Lee, Hyeong-Rae;Jung, Hea-Reyn
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.10
    • /
    • pp.809-821
    • /
    • 2016
  • The study area is local river of 671 (total length 3,741 km) in Gyeongnam prefecture, the results are as follows. Total number of river-crossing structures was investigated as 7,730, and it was found that structures were installed in 2.1 sites per 1 km (river length) on average. Diversion weirs for agriculture were 4006 (51.82%) and drop structures for channel bed maintenance were 3670 (47.48%), but the rest (riverbed road etc.) were 54 (0.70%). The number of high structures (height > 1.0 m) that affect many impact in upstream and downstream was investigated as 3,897 (51%), and the number of low structures (height < 0.5 m) that affect negligibly was 1109 (14%). Fish ladders have been installed on 640 (8%) structures in 153 (23%) rivers. In flood control and environment conservation, river-crossing structures brought about various impact that flood water level is raises and the eco-corridor is intercept. In order to improve these problems, we proposed a few engineering measures that can be realize with respect to river-crossing structures.

Surgical Treatment Outcomes of Acquired Benign Tracheoesophageal Fistula: A Literature Review

  • Kim, Sang Pil;Lee, Juhyun;Lee, Sung Kwang;Kim, Do Hyung
    • Journal of Chest Surgery
    • /
    • v.54 no.3
    • /
    • pp.206-213
    • /
    • 2021
  • Background: Tracheoesophageal fistula (TEFs) is a rare condition that requires complex surgical treatment. We analyzed the surgical outcomes of TEF reported in the literature and at Pusan National University Yangsan Hospital using standardized techniques. Methods: This retrospective study included 8 patients diagnosed with acquired benign TEF between March 2010 and December 2019. The surgical method was determined based on the size of the fistula observed within the endoscope. Results: TEF occurred in 7 patients (87.5%) after intubation or tracheostomy and in 1 patient (12.5%) after esophageal surgery due to conduit necrosis. For tracheal management, 5 and 2 patients underwent tracheal resection and end-to-end anastomosis and primary repair, respectively. The median length of resection was 2.5 cm (range, 1.3-3.4 cm). For esophageal management, 6 patients underwent primary repair and 1 patient underwent esophageal diversion. One patient underwent TEF division with a stapler. Interposition of a muscle flap was performed in 2 patients. TEF recurrence, esophageal stenosis, and dehiscence or granulation occurred in 1, 1, and 2 patients, respectively. A long-term tracheostomy tube or T-tube was used in 2 patients for >2 months. Conclusion: Although TEF surgery is complex and challenging, good results can be achieved if surgical standards are established and experience is accumulated.

Application of OECD Agricultural Water Use Indicator in Korea (우리나라에 적합한 OECD 농업용수 사용지표의 설정)

  • Hur, Seung-Oh;Jung, Kang-Ho;Ha, Sang-Keun;Song, Kwan-Cheol;Eom, Ki-Cheol
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.39 no.5
    • /
    • pp.321-327
    • /
    • 2006
  • In Korea, there is a growing competitive for water resources between industrial, domestic and agricultural consumer, and the environment as many other OECD countries. The demand on water use is also affecting aquatic ecosystems particularly where withdrawals are in excess of minimum environmental needs for rivers, lakes and wetland habits. OECD developed three indicators related to water use by the agriculture in above contexts : the first is a water use intensity indicator, which is expressed as the quantity or share of agricultural water use in total national water utilization; the second is a water stress indicator, which is expressed as the proportion of rivers (in length) subject to diversion or regulation for irrigation without reserving a minimum of limiting reference flow; and the third is a water use efficiency indicator designated as the technical and the economic efficiency. These indicators have different meanings in the aspect of water resource conservation and sustainable water use. So, it will be more significant that the indicators should reflect the intrinsic meanings of them. The problem is that the aspect of an overall water flow in the agro-ecosystem and recycling of water use not considered in the assessment of agricultural water use needed for calculation of these water use indicators. Namely, regional or meteorological characteristics and site-specific farming practices were not considered in the calculation of these indicators. In this paper, we tried to calculate water use indicators suggested in OECD and to modify some other indicators considering our situation because water use pattern and water cycling in Korea where paddy rice farming is dominant in the monsoon region are quite different from those of semi-arid regions. In the calculation of water use intensity, we excluded the amount of water restored through the ground from the total agricultural water use because a large amount of water supplied to the farm was discharged into the stream or the ground water. The resultant water use intensity was 22.9% in 2001. As for water stress indicator, Korea has not defined nor monitored reference levels of minimum flow rate for rivers subject to diversion of water for irrigation. So, we calculated the water stress indicator in a different way from OECD method. The water stress indicator was calculated using data on the degree of water storage in agricultural water reservoirs because 87% of water for irrigation was taken from the agricultural water reservoirs. Water use technical efficiency was calculated as the reverse of the ratio of irrigation water to a standard water requirement of the paddy rice. The efficiency in 2001 was better than in 1990 and 1998. As for the economic efficiency for water use, we think that there are a lot of things to be taken into considerations to make a useful indicator to reflect socio-economic values of agricultural products resulted from the water use. Conclusively, site-specific, regional or meteorogical characteristics as in Korea were not considered in the calculation of water use indicators by methods suggested in OECD(Volume 3, 2001). So, it is needed to develop a new indicators for the indicators to be more widely applicable in the world.