• Title/Summary/Keyword: difference of tide height

Search Result 17, Processing Time 0.026 seconds

Accuracy Assessment of Tide Models in Terra Nova Bay, East Antarctica, for Glaciological Studies of DDInSAR Technique (DDInSAR 기반의 빙하연구를 위한 동남극 테라노바 만의 조위모델 정밀도 평가)

  • Han, Hyangsun;Lee, Joohan;Lee, Hoonyol
    • Korean Journal of Remote Sensing
    • /
    • v.29 no.4
    • /
    • pp.375-387
    • /
    • 2013
  • Accuracy assessment of tide models in polar ocean has to be performed to accurately analyze tidal response of glaciers by using Double-Differential Interferometric SAR (DDInSAR) technique. In this study, we used 120 DDInSAR images generated from 16 one-day tandem COSMO-SkyMed DInSAR pairs obtained for 2 years and in situ tide height for 11 days measured by a pressure type wave recorder to assess the accuracy of tide models such as TPXO7.1, FES2004, CATS2008a and Ross_Inv in Terra Nova Bay, East Antarctica. Firstly, we compared the double-differential tide height (${\Delta}\dot{T}$) for Campbell Glacier Tongue extracted from the DDInSAR images with that predicted by the tide models. Tide height (T) from in situ measurement was compared to that of the tide models. We also compared 24-hours difference of tide height ($\dot{T}$) from in situ tide height with that from the tide models. The root mean square error (RMSE) of ${\Delta}\dot{T}$, T and $\dot{T}$ decreased after the inverse barometer effect (IBE)-correction of the tide models, from which we confirmed that the IBE of tide models should be corrected requisitely. The RMSE of $\dot{T}$ and ${\Delta}\dot{T}$ were smaller than that of T. This was because $\dot{T}$ is the difference of tide height during temporal baseline of the DInSAR pairs (24 hours), in which the errors from mean sea level of the tide models and in situ tide, and the tide constituents of $S_2$, $K_2$, $K_1$ and $P_1$ used in the tide models were canceled. This confirmed that $\dot{T}$ and ${\Delta}\dot{T}$ predicted by the IBE-corrected tide models can be used in DDInSAR technique. It was difficult to select an optimum tide model for DDInSAR in Terra Nova Bay by using in situ tide height measured in a short period. However, we could confirm that Ross_Inv is the optimum tide model as it showed the smallest RMSE of 4.1 cm by accuracy assessment using the DDInSAR images.

Redefinition of the Original Benchmark Height using Long-term Tide Observations Analysis and GPS Levelling Methods (장기간 조위관측자료 분석과 GPS 수준측량 수준원점 성과 재정의)

  • Jung, Tae-Jun;Yoon, Hong-Sic;Hwang, Jin-Sang;Lee, Dong-Ha
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.4
    • /
    • pp.393-403
    • /
    • 2011
  • In this study, we suggested the period of tide observations is proper to calculate the mean sea level(MSL) precisely on Incheon tide station using wavelet analysis, and newly determined then the vertical reference surface of Korea using the calculated MSL. In order to calculate the height difference between the calculated MSL and specific ground station (ICGP) near the Incheon tide stations, we performed the laser measurements directly to the sea surface where located below ICGP. The orthometric-height of ICGP was determined that corrected the height difference to the calculated MSL using linear interpolation method. Finally, we connected the orthometric-height of ICGP with the original benchmark (ORBM) using GPS leveling methods for determining the new orthometric-height of ORBM. As the results, there is a variation amount of 0.026m between the new MSL was calculated in this study and old MSL was calculated in 1910's. Also, there is a difference of 0.035m between the new and old orthometric-heights of ORBM. The connection (or leveling) error of 0.009m was revealed in new orthometric height of ORBM with consideration of MSL variation which may caused by the error of GPS ellipsoid height and/or geoid model. In this study, we could be determined precisely the orthometric-height of ORBM based on the new MSL of Incheon Bay using only GPS leveling method, not a spirit leveling method. Therefore, it is necessary to determine the vertical datum strictly using long-term and continuously tide observations more than 19 years and to use the GPS leveling method widely in the height leveling work for the effective changeover from the orthonormal to the orthometric in national height system.

A Study on the Tide Differences in the Tide Tables of Major Ports in Korea - Focusing on the Comparison of UK and Korean Harmony Constants - (국내 주요항 조석표상 조석 차이에 관한 연구 - 영국과 한국 조화상수 비교를 중심으로 -)

  • Jeon, Jae-Ho;Moon, Serng-Bae
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.7
    • /
    • pp.827-833
    • /
    • 2019
  • There are several factors to consider for a ship to enter or depart a port safely. It is particularly important to identify the tides in the port to reduce the risk of stranding the ship. Most previous studies have focused on finding and analyzing harmonic constants. However, the research on the analysis and accuracy of harmonic constants in other hydrographic agencies is lacking. In this study, six Korean ports (Incheon, Gunsan, Yeosu, Busan, Ulsan, and Sokcho) were compared to the British and Korean tide tables based on actual information. To find the cause of tidal difference, the tide height, tide time, and form factor were calculated using harmonic constants. The information was then compared with British and Korean data. As a result of the difference in analysis of actual information and tide tables, there was a difference between the actual tide height and time at each port. The cause was found to be the difference in the harmonic constant, tide, and form factor between the UK and Korea. Therefore, this study, the Korean standard port should be added to the British tide table, and harmonic constants, which are the criteria for creating tides, must be constantly updated with the latest information. Additionally, the tide tables produced in each country are more accurate than the tide tables produced in UK.

Preliminary Study of Vertical Datum Determination in Korea (수직기준 결정을 위한 기초 연구)

  • Jeong, Tae-Jun;Yun, Hong-Sic;Huang, He
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.55-58
    • /
    • 2007
  • This study describes a problem of the Original Bench Mark which is used currently. We calculate New Mean Sea Level(MSL) in Incheon Port using tide data for 57 months and take 8 points GPS/Leveling data in research area. We calculate orthometric height of one control point using tide data and GPS/Leveling data. After fixed the control point, we decide final orthometric heights using relative geoidal height and ellipsoidal height from GPS survey. To analysis the Original Bench Mark compares final orthometric heights with the orthometric heights in Korea height system. We get the result that the New Original Bench Mark's height is 26.7176m. It appears 3.05cm difference as the Original Bench Mark's height is 26.6871cm in Korea height system.

  • PDF

The analysis of the tide and drift correction models for precise gravity surveying (정밀 중력측정을 위한 조석 및 계기 보정 모델 분석)

  • Lee, Ji-Sun;Kwon, Jay-Hyoun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.5
    • /
    • pp.523-530
    • /
    • 2010
  • Recently more gravity data is being obtained due to the increased demands from the fields of geodesy, geophysics, and military. In general, the observed gravity values are corrected for the effect of tide, instrument drift, and instrument height to generate the absolute gravity values at a point. Until yet, the models for tide and drift corrections and those procedures are not determined in Korea which led to the inconsistent data processing for different data sets. Therefore, in this study, the models for tide and drift are analyzed to select the appropriate models. Based on the analysis, it was found that there is not much difference between Longman and Tamura tide models for celestial objects. Earth tide, however, should be considered in tide correction procedure. In drift corrections, the difference between the model considering only the common points and that considering all points appears significantly large up to 0.04mGal. In this case, the model with all points should be used as it the correct one according to the adjustment theory and it generates estimates with better precision.

The Evaluation of Water Quality in Coastal Sea of Saemangeum by Chemical Environmental factors (새만금 하구역의 이화학적 환경요인에 따른 수질 평가)

  • Kim, Jae-Ok;Kim, Won-Jang;Jo, Kuk-Hyun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.5
    • /
    • pp.57-65
    • /
    • 2007
  • The objective of this study was to evaluate chemical water quality by hourly monitoring(25hr) of Saemangeum esturary. For this study, we selected 2 sites like a Mangyong Bridge(St. 6) and Dongjin Bridge(St. 7). Inflow of salt water was not detected during low tide(maximum 553, 508cm) of all stations, while the salinity rises were detected in spring tide(750cm). When 602m of maximum tide was reached, salinity concentration was increased at St. 7, while there was no change in St. 6. Therefore, We know that salinity variation is greatly influenced by tide height at survey site. Also, significant variance of salinity(p<0.05) was found between St. 6 and St. 7 because dike construction made the flood tide move into the Dongjin river. Total suspened solids(TSS) concentration was increased because of the river runoff at St. 6, and also the turbulance and resuspension according to salt intrusion at St. 7. During the high tide, the water discharge from the sea seemed to dilute the nutrient but to elevate TSS concentration in St. 7. Silicate and nitrate concentrations in the studied site were decreased by the mixing of sea water, whereas the evident trend of phosphate concentration was not found. This result can be explained by the phosphorus condition. Phosphorus exists inactive when it is affected by hydrated iron and adsorbed onto suspended matters. Compared to the environmental conditions of the St. 6 and St. 7, physical factors such as temperature, dissolved oxygen and TSS have statistically no significant difference(p<0.001), but nutrient concentrations were higher at St. 6 than St. 7. It could be suggested from these results that it is important to control the discharge of fresh water by sewage treatment plants located in St. 6 for water quality management.

Economical Analysis and Estimate Method of Possible Working Hours for Marine Rock Excavation Work Regarding the Tide Cycle (조석의 주기를 고려한 해상 암굴착 공사의 경제성 분석 및 작업가능시간 산정 방법에 관한 연구)

  • Kwon, Soon-Boum;Ock, Jong-Ho;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.142-151
    • /
    • 2007
  • The rock excavation work on the sea is planned as underwater process if the elevation of the rock is lower than the M.S.L.(Mean Sea Level). However, in case of West and South sea which are largely different between the rise and fall of the tide, the earth work can be performed on the ground while the work surface is exposed above the sea according to the tide cycle. Thus, it may a good substitute to make up for shortcomings of underwater construction works such as safety problems of workers, loss of efficiency and increasement of construction costs. But the difference between the height of the rock excavation surface and the water surface changed by the tide makes the exposure time of work surface, that is the possible working hours be changed. Also, it may cause the changes of construction cost. Thus, this study analyzes the economical efficiency of the construction method using the difference between the rise and fall of the tide in comparison with the construction method which is performed under the sea, and it also suggests the way to analyze the economical working hours by estimating the possible working hours on the ground. We also try to find out the application possibility of the way like the rock excavation work on the sea using the difference between rise and fall of the tide.

Time-series Analysis of Seawater Temperature in the Garolim Bay, the West Coast of Korea (서해 가로림만 수온의 시계열 분석)

  • Yang, Joon-Yong;Cho, Sunghee;Lee, Joon-Soo;Han, Changhoon;Heo, Seung
    • Journal of Environmental Science International
    • /
    • v.30 no.7
    • /
    • pp.585-595
    • /
    • 2021
  • We used seawater temperature data, measured in the Garolim Bay, to analyze temperature variation on an hourly and daily basis. Lagrange's interpolation using before and after data was applied to restore nonconsecutive missing temperature data. The estimated error of the data restoration was 0.11℃. Spectral analyses of seawater temperature showed significant periodicities of approximately 12.4 h (semidiurnal tide) and 15.0 d (long-period tide), which is close to those of M2 and Mf partial tides. Variation in seawater temperature was correlated more with tidal height than with air temperature around the Garolim Bay. In June and December, when the seawater temperature difference between the inside and outside of the Garolim Bay was very large, the periodicities of 12.4 h and 15.0 d were highly prominent. These results indicate that the exchange of seawater between the inside and outside of the Garolim Bay induced variations in seawater temperature owing to tide. Understanding temperature variation because of tide helps to prevent abnormal mortality of cultured fish and to predict seawater temperature in the Garolim Bay.

A Scenario for the Standard Basis of Crest Elevation Estimation along Korean Coast based on Expected Overtopping Probability (마루높이 설정(設定) 기준(基準)을 위한 기대월파확률 추정 Scenario)

  • Kweon, Hyuck Min;Kim, Gun Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4B
    • /
    • pp.365-376
    • /
    • 2009
  • The importance of resonable treatment of tide characteristics has been shown by Kweon, et al. (2005, 2006) for the crest elevation estimation because of a big difference of tidal elevation along Korean coast. For the procedure of crest elevation design, the expected overtopping probability (EOP) was estimated by Kweon, et al. (2006). The comparisons on each sea showed that EOP was lower east, south and west sea in order. The results involved the assumption that the tide and design level wave height meet any time in a year. However, big waves mainly occur in summer or winter in Korean coast, the study focuses on the encounter probability of big waves and seasonal tide level. A theory of the encounter probability is not derived by the present study but it shows reasonable acceptability of the proposed scenario in which the expected overtopping probability could be an index for the crest elevation estimation in Korean coast. The calculation based on the scenario gives the possibility range for the crest elevation estimation which has no tendency of each sea along Korean peninsular. The range is within the expected overtopping probability of 1% in the whole coast of Korea.

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF