• Title/Summary/Keyword: design work

Search Result 8,333, Processing Time 0.034 seconds

A Study of Nude Construction Roon Composition & Application for Interior Construction Education (실내시공 교육을 위한 누드시공실 구성과 운용에 관한 연구)

  • 박의정
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.133-139
    • /
    • 2001
  • Today the social concern about Interior Design gradually requires wide comprehension. Also according to demanders' requirement. Universities cope with speed. Interior Design made by experts for the function and purpose in the conception of decoration. Therefore, Universities we responsible to educate for more capable professional designers. But management is the first concern for Interior Design Company students are going to work at. Interior Design has not the important state yet in Korea, it is hard to manage the company with design alone. As architecture must get admittion, design is apart from construction. but they are worked together in Interior Design. It is true that all the work of construction is Capenters' or technical engineers' work except space design. Of course students are interested in just design not in construction. Students majoring in design need wide understanding of construction not a concept design. but detailed design for construction and proper valuation ability to manage company. I propose component and practical use of nude construction department to understand detailed design.

  • PDF

Design of Optimized Ultrasound Clinical Work-Flow; Usability Perspective

  • Bag, ByungEun;Yoo, SunKook;Jang, WonSeuk
    • Journal of International Society for Simulation Surgery
    • /
    • v.2 no.1
    • /
    • pp.40-42
    • /
    • 2015
  • Purpose Usability is an important factor in our life. This paper presents an approach to design the clinical work-flow for ultrasound system. And, we tried to apply this work-flow in diagnosis ultrasound system. Materials and Methods For user learnability, we follow international standard IEC 60601-1-1 and IEC 62366 which describes usability of medical instrument. User requirement are applied by 10 clinicians who are well aware of usability. We considered user environment and designed clinical work-flow into two types: general use and emergency use. The designed clinical work-flow was evaluated by 10 clinicians and results derived from the evaluation were analyzed. Results We could successfully design optimized clinical workflow of ultrasound system. Conclusion This paper suggests usability testing for optimized ultrasound clinical workflow. Using this clinical work flow, users can enhance their clinical performance and reduce operation time.

A Survey on the Risk Factors Analysis and Evaluation for the types of VDT Work

  • Kim, Day Sung
    • Journal of the Ergonomics Society of Korea
    • /
    • v.32 no.5
    • /
    • pp.469-474
    • /
    • 2013
  • Objective: The purpose of this study was to analyze the risk factors of MSDs for the types of office work. Background: Physical risk factors of VDT(Video Display Terminal) associated with shoulder and neck musculoskeletal disorders(MSDs) include static work postures and workstation status. Method: In this study, office work was divided into data search, data entry and design work(drawings, etc.), and then we were surveyed 7 major work places which was included these works. We recorded working postures and obtained still images, depending on the types of office work. Then, RULA(Rapid Upper Limb Assessment) and ROSA(Rapid Office Strain Assessment) were used to analysis the risk factors. Results: The results of RULA showed that design work was under risk levels and required change, but ROSA showed that data entry and design work were high risk. The RULA is to evaluate the level of risk factors based on the working posture; on the other hand, the ROSA is to consider the use of peripheral, same as chair, keyboard/mouse, monitor and computer workstations. Conclusion: Conclusions of this study, the office work is necessary to identify the risk factors caused by the use of peripheral, as well as working posture.

A Design of Ottchil Products, Chinese Qing Dynasty Decorative Ceramic Deformities (중국 청나라 장식도자 기형을 적용한 칠기작품디자인)

  • Zou, Wanli;Chung, Hae Cho;Kim, Chung Ho
    • Journal of the Korea Furniture Society
    • /
    • v.27 no.4
    • /
    • pp.375-382
    • /
    • 2016
  • This study focuses on the shape of the bottle, the Chinese Qing Dynasty porcelain decoration. Consideration given to understand the basic form of the catheter, and the basic division. To study the binding form to the principles of the design work to prepare a lacquer on the basis of the results obtained here. When classified by type illness Qing Dynasty porcelain decorative porcelain six types, semi-porcelain could be classified into five types. Production form to pursue work in this study design is produced in the form of asymmetrical vases object type curve. These bottles of Qing Dynasty porcelain for decoration. The basic type of pottery types and selected six of its basic and applied work. Production design work was produced Hyupjeotae production techniques that facilitate formative representation.

Conceptual Design and Technical Feasibility Analysis of an All-in-one Attachment Based Steel Pipe Pile Cutting Robot (굴삭기 기반 강관말뚝 두부정리 및 절단 부위 핸들링 로봇의 개념디자인 및 기술적 타당성 분석)

  • Yeom, Dong Jun;Han, Jae Hyun;Jung, Eui Hyun;Kim, Young Suk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.45-54
    • /
    • 2018
  • The primary objective of this study is to develop a conceptual design of all-in-one attachment based steel pipe pile cutting robot that improves the conventional work in safety, quality, convenience and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)field investigation, 3)selection of element technology for conceptual design, 4)deduction of conceptual design and its work process, 5)technical feasibility analysis of the conceptual design and its work process. As a result, leveling laser and laser detector, plasma cutter, rotary grapple are selected as core technologies. Futhermore, a conceptual design and work process of an all-in-one attachment based steel pipe pile cutting robot are developed based on the core technologies. According to the technical feasibility analysis result, at least 76.8% of the respondents are selected positive answer about each device of the all-in-one attachment based steel pipe cutting robot. It is expected that the application range and impact on the construction industry will be enormous due to the increasing trend of the steel pipe pile market.

A Study on the Collaboration Design System Operation and Component Using the Network in Architectural Design (건축계획에서 네트워크 구축을 통한 공동설계의 운영과 구성에 관한 연구)

  • 조성오
    • Korean Institute of Interior Design Journal
    • /
    • no.18
    • /
    • pp.9-15
    • /
    • 1999
  • Computers and internet have the potential to radically development. But, computer is a just tool by itself. This study is control implement in a way that exploits the capacity of network of processors to execute many tasks concurrently in architectural desigv. The collaboration design system constituted integrated CAD (computer-aided design) system at the base of standardization database environment network and world wide web (WWW). Collaboration design management system is composed of Project Management, Part Management, Process Management , and Appraisement system. They can provide frameworks for effective coordination and management of design work in accordance with the Collaboration Design Support System operating rule accommodatingly. architectural data can be collaboration design environment accessible through a web browser and located at a server. whenever their work investigated each others. Throughout process, the database acted as an individual design and it made them available in realtime. And they can have quick overview of the work. That way a continuous evaluation of best design was distinctly and highly. In the future, New architectural design methods are collaboration environment could result in productivity and quality.

  • PDF

Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects - (설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 -)

  • Lee, Jin Woong;Kim, Taehoon;Cho, Kyuman
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.97-104
    • /
    • 2018
  • Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.

Analysis the Design Attribution to Assess the Design Quality Based on Detailed Design (실시설계도면 기반 설계속성 도출 및 설계품질평가)

  • Yang, Ji Su;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.3-12
    • /
    • 2016
  • Recently, construction industry shows active expansion in overseas construction market. But the active work limited in construction work, on the other hand, design-drawing work is evaluated shortage of competitive power. So this study aim to improve the competitive of 'domestic design-drawing work'thorough objective evaluation. Objective evaluation is consist of 'design attribution'. Design attribution is based on the execution drawing and complement by existing reasearch, expert interview. And then, list up the 'design attribution' evaluation list to carry out a survey targeting hands-on worker. Survey is consist of 'Likert 5-point scale, FMEA method'. As a result, construction company and design company show different opinions in both relative position evaluation and importance evaluation.

Design and Implementation of Distributed Collaborative Writing System for Engineering Design Process (다자간 협동 공학설계를 위한 DCWA 시스템의 설계 및 구현)

  • 이병걸
    • Journal of Korea Multimedia Society
    • /
    • v.3 no.1
    • /
    • pp.63-76
    • /
    • 2000
  • Most work done in CSCW (Computer Supported Collaborative Work) system has been targeted toward supporting the exchange of documents or messages among group members, and yet support for cognitive aspects such as group organization, division and merge of work, and work flow control. The objective of the study is to provide CSCW environment for the engineering design process such as CAD (Computer Aided Design) and CASE (Computer Aided Software Engineering). The proposed DCWA (Distributed Collaborative Writing Aid) system suggests a mechanism that unifies the group organization, work division, and work flow control in the CAO, CASE, and software simulation tool. In particular, CAD relates the group and work partition by providing expressing the relation of drawing object (e.g., binding, attachment, and proportional scaling) which is owned by different members of group, and CASE combining with the simulation tool supports the flexibility of the work flow control. Simulating the prototype before manu-facturing a product can reduce time and cost in development.

  • PDF

A Feedback System for Internship & Capstone Design Integrated Program (인턴십·종합설계 연계 교육 모델의 환류체계 구축)

  • Shin, Youn-Soon;Jung, Jin-Woo;Ahn, Jong-Suk;Lee, Kang-Woo
    • Journal of Engineering Education Research
    • /
    • v.19 no.1
    • /
    • pp.61-66
    • /
    • 2016
  • To enhance the university-industry collaboration, a novel program named as Internship & Capstone Design Integrated program (ICIP) is developed by Dongguk University. Senior students must take one Capstone design class for graduation. By participating in summer Internship and one-year Capstone Design work, practical problems given by businesses are solved. The ICIP is a Project and Internship-based course. By participating in summer internship and one-year Capstone Design work, practical problems given by businesses are solved. The internship course requires students to work in teams under mentors who work in the partner company proposed project themes. Students apply their academic experiences in constructing real projects at work under the supervision of their site mentors and academic advisor. In this regard, this study attempts to present a case study on the assessment of program outcomes using the Internship.