• Title/Summary/Keyword: design work

Search Result 8,317, Processing Time 0.036 seconds

Conceptualizing Digital Shadow Work: Focused on Mandatory and Reward Related Issues (디지털그림자노동(Digital Shadow Work)의 개념화: 강제성과 대가성 이슈를 중심으로)

  • Bu, Shaoyang;Koh, Joon
    • The Journal of Information Systems
    • /
    • v.31 no.3
    • /
    • pp.89-108
    • /
    • 2022
  • Purpose The purpose of this study is to clarify the conceptualizations of mandatory and reward that have come into focus in the definition of digital shadow work. And explore how users in a shared services environment view cost and coercion from the perspective of digital shadow work. Design/methodology/approach We conducted one-on-one interviews with 4 participants, with each interview being an average of 25 minutes. Based on literature review, stakeholder observation, and interviews on digital shadow work so far, very objective results can be derived through triangulation based on the basis of multiple sources. Findings According to the results of the preliminary study, there are some rewards for each type of digital shadow work, but time saving and service convenience are considered more than financial rewards. Unfair demands in determining whether to implement them in consideration of the difficulty and expected benefits of the demanding digital work can cause dissatisfaction with the service. Academic implications and future research directions are also discussed.

A Study on Development of Safety Shell Molds for Precision Machining of Sand Mold Casting Product (사형제품 기계가공을 위한 안전금형 개발에 관한 연구)

  • Choi, Jae-Hoon;Nam, Seung-Done
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.179-184
    • /
    • 2013
  • An accident from machine work is often fatal to the worker. This accident is mostly preventable through perfect process jig. In case of this machine work, however, the disaster frequently occurred because of the design which is not considered the beginning of product design, post-process and mass process of production. As for sand casting method, this has the merits of the production; the product is easily produced by manual labor. On the other hand, this method has the demerits of a bigger dimensional error contrary to other mass process of production. When the sand casting product is in machine work, there are various problems such as unsafe fix and excessive cutting, product desorption and rapid life depreciation of equipment and tools. Considering the characteristics of sand casting method, it is accepted as difficulty to improve the problems. In this study, it suggests shell mold method for mold instead of the machine work after the sand casting of the circle shape container product. And the surface accomplishes the following average of surface roughness Ra$9.94{\mu}m$ of machine work with the casting of flask mold by shell mold method. In accordance with the simplification of processing process and reducing the average thickness variation by mass production of product with detailed appearance, it has a good influence on safety accident prevention caused by production and damaged product. It is confirmed that making higher degree of size precision of all machine work product is possible to increase the safety and productivity, reduce the processing process and improve environment.

Moderation of Meaningful Work on the Relationship of Supervisor Support and Coworker Support with Work Engagement

  • Ahmed, Umair;Majid, Abdul Halim Abdul;Zin, MdLazim Mohd
    • Asian Journal of Business Environment
    • /
    • v.6 no.3
    • /
    • pp.15-20
    • /
    • 2016
  • Purpose - The aim of this article is to outline the concept of work engagement and the importance of job resources including supervisor support and coworker support pertaining to work engagement. Research Design, Data, and Methodology - The article discusses the concept of work engagement and what empirical evidences suggest about its relationship with job resources including supervisor and coworker support. Result - Critical review of the literature has indicated towards strengths and pitfalls of social support resources including supervisor and coworker at work, particularly with regards to work engagement thus, requiring further empirical attention. Accordingly, the article has also indicated towards the critical significance of meaningful work for fostering employee well-being at work. Conclusions - The article has highlighted noteworthy empirical gaps in the body of knowledge concerning to job resources including supervisor support and coworker support and their relationship with work engagement. The article has also underlined the lack of research and potential of 'meaningful work' towards enhancing work engagement as well as, acting as a moderator between supervisor support, coworker support and work engagement relationship.

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.