• Title/Summary/Keyword: derrick crane

Search Result 9, Processing Time 0.014 seconds

Construction Stage Analysis of Hybrid Composite Cable-Stayed Girder Bridge Using Eccentrically Loaded Derrick Crane (편중 가능한 사장교 가설용 데릭 크레인을 이용한 합성형 복합 사장교 시공 단계 해석)

  • Park, Taekwun;Kim, Moon Kyum;Won, Jong Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.277-286
    • /
    • 2010
  • Derrick or caterpillar crane is generally used for the long-span/cable-stayed bridge construction by pre-cast segment lifting from over-land or water transportation. The heavy weight of them, however, could make defects on unstable under-construction structure and, furthermore a method of conventional segment transportation is also able to occur additional time and cost. In this study, in order to improve conventional construction method, the newly developed derrick crane is mainly considered. It could be not only eccentrically loadable on constructing girder but having rotatable boom for segment transportation from back-side. A series of construction stage using developed derrick crane is defined and also its numerical analysis is conducted. To reflect load characteristics of developed derrick crane on construction stage analysis, on/out of service load is separately calculated by considering vertical/lateral rotation range of boom and it is loaded on 4 fixed positions of crane. The derrick crane on this study could be time and cost saving solution for cable-stayed bridge construction and also make contributions to construction load reduction in its process.

Stress Analysis of a Derrick System Cargo Gear (Derrick식 하역설비의 Vector 삼각형을 이용한 응력해석)

  • Min, Byeong-Eon;Koo, Hong
    • Journal of the Korean Institute of Navigation
    • /
    • v.5 no.2
    • /
    • pp.99-108
    • /
    • 1981
  • As far as ship's cargo handling devicesareconcerned, the derrick system has been used comprehensively in the marine. Even though there are several new devices for ship's cargo gear, such as gantry crane, jib crane adn self unloader, the derrick system, with its improved rigging method, still retains its utmost reputations among ship's owners. Therefore the method of calculating the system's militating stresses in the course of cargo operation needs to be more convenient and analytical. Here the author attempts to introduce the calculating method of stresses by means of vector analysis. The calculating method is able to analyze the stresses acting in every part of the cargo gear systems, such as union purchase, slewing or its modified system.

  • PDF

A COMPARISON OF OLD AND NEW OSHA REGULATIONS ON CRANES AND DERRICKS USING COMPREHENSIVE GAP ANALYSIS

  • Chung-Suk Cho;Francis Boafo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.74-79
    • /
    • 2013
  • Aiming at reducing deaths and injuries involving construction crane operations, OSHA has recently updated its 40-year-old crane safety standards with new rules addressing the use of cranes and derricks in construction. The goal of this change in rule is to deal with the leading causes of fatalities related to crane and derrick operations. Employers in the construction industry are mandated to ensure that employees in the work zone are trained to recognize hazards associated with the use of the equipment and any related duties that they are assigned to perform. However, those responsible at construction sites for the supervision and management of safe crane operations often lack the integrated knowledge of the standards, regulations and best practices for conducting or supervising daily, monthly, or quarterly inspection of cranes. As such, proper planning, management and implementation of crane operations, including inspections are just as paramount to reducing accidents on the construction site. It is important that engineers responsible for the management and planning of crane operations understand the latest OSHA crane and hoisting standards to ensure a safer work environment is maintained. Many on site engineers overseeing crane operations do not have adequate training, experience, and knowledge of the inspection requirements to assess safe crane operation and too often rely on the crane operator's judgement. This paper highlights recent research effort in defining significant changes in new crane and hoisting standards and provides basis for safety construction operations.

  • PDF

3-Dimensional FE Analysis of Construction Stages of The Cable-stayed Bridge with Steel-box Girder (강박스 사장교의 시공단계를 고려한 3D 상세 유한요소 해석)

  • Lee Tae-Yeol;Kim Young-Hoon;Shin Hyun-Yang;Kim Jae-Kwon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.249-256
    • /
    • 2005
  • Rigorous FE(Finite Element) analyses of the cable-stayed bridge with steel-box girder, the main construction method of which is FCM (Free Cantilever Method), are presented in this paper. The analysis and the checking of design for a derrick crane under several loading conditions are performed using the software MIDAS/Civil and the beam elements are used to model the main structure. Among all the construction stages, special construction stages are chosen and considered to ensure the safety of segments of box girder The stress analysis for lifting of a segment of box girder is performed using the software SAP2000 and the shell elements of which having 6 DOF(Degrees Of Freedom) per nodes are successfully used to model the segment of box girder for the purpose of capturing the detailed behaviors on the folded-plates in the segment. Finally, concluding remarks are given to improve a design of the derrick crane and the segment based on the results from this study.

  • PDF

Closing Analysis of Symmetric Steel Cable-stayed Bridges and Estimation of Construction Error (대칭형 강 사장교의 폐합해석과 시공오차의 예측)

  • Lee, Min Kwon;Lee, Hae Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.55-65
    • /
    • 2006
  • This paper presents the closing analysis of a symmetric steel cable-stayed bridge erected by a free cantilever method. Two independent structural systems are formed before the closing procedure of a bridge is performed, and thus the compatibility conditions for vertical displacement and rotational angle are not satisfied at the closing section without the application of proper sectional forces. Since, however, it is usually impossible to apply sectional forces at the closing section, the compatibility conditions should be satisfied by proper external forces that can be actually applicable to a bridge. Unstrained lengths of selected cables and the pull-up force of a derrick crane are adjusted to satisfy nonlinear compatibility conditions, which are solved iteratively by the Newton-Raphson method. Cable members are modeled by the elastic catenary cable elements, and towers and main girders are discretized by linear 3-D frame elements. The sensitivities of displacement with respect to the unstrained lengths of selected cables and the pull-up force of the derrick crane are evaluated by the direct differentiation of the equilibrium equation. A Monte-Carlo simulation approach is proposed to estimate expected construction errors for a given confidence level. The proposed method is applied to the second Jindo Grand Bridge to demonstrate its validity and effectiveness.

Construction Method of Seohae Grand Bridge (서해대교 시공 공법 소개)

  • Yoon Tae Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.255-266
    • /
    • 2000
  • Since 1993, Seohae grand bridge has been continued construction for 7 years and will be completed late this year. The bridge is a part of west sea castal highway and consists of 3 types of bridge including precast segmental method, free cantilever method and cable stayed bridge. A cable stayed bridge is the core of this bridge and it consists of 5 span, symetrical cable-stayed bridge with a total length of 990 m. The main span between two H-shaped pylons extending approximately 180 M above massive foundation of a cable stayed bridge is 470 m long and an approach span of that is 260 m long respectively. The circular cofferdam with 16 ea of 25 m diameter flat type sheet pile had been applied to construct foundation. The slipform method had been applied for forming of con'c of two H-shaped pylons with 3 cross beams respectively which is varied horizontally and vertically. The deck has been erected with balanced cantilever method using movable derrick crane. The stay cables is a bundle of parallel individually protected, 7 wire high tensile strands. The strands is hot deep galvanized and sheathed with a tight high density polyethylene coating. A petroleum wax fills all the inter-wire voids. The bundle of strands to prevent from deterioration due to the ambient problem covered with high density polyethylene pipe. The Isotension method has been applied for the stressing of cable strands to ensure uniformity of force in all the strands of a syay and such works has been performed on the stay specially provided in the pylon.

  • PDF

Analytical Study for Ultimate Behavior of Steel Cable-stayed Bridges under Construction Stage (시공중 강사장교의 극한거동에 대한 해석적 연구)

  • Lee, Joo-Tak;Kim, Seung-Jun;Kim, Jong-Min;Choi, Jun-Ho;Kang, Young-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.6
    • /
    • pp.691-704
    • /
    • 2011
  • This paper presents an investigation on the ultimate behavior of steel cable-stayed bridges in the construction stage, considering various geometric nonlinearities and material nonlinearities. To numerically determine the state of cable-stayed bridges in the construction stage, initial shape analysis and construction stage analysis via backward process analysis were done sequentially. Then nonlinear analysis of the state under the construction load condition, considering the weight of the derrick crane and the key segment of the girder loaded onto the tip of the center span, was performed to investigate the ultimate behavior of the structure. The effects of the girder-mast stiffness ratio, the cable-arrangement types, and the area of the stay cables on the ultimate behavior were also extensively investigated. Moreover, the results of the ultimate analysis, considering both geometric nonlinearities and material nonlinearities, were compared with the results of the geometric nonlinear analysis, for a more meaningful investigation of the ultimate behavior of steel cable-stayed bridges in the construction stage.

Closing Step Analysis in Cable-Stayed Bridges to Produce Initial Equilibrium Condition (초기평형상태 구현을 위한 사장교의 폐합단계 해석)

  • Park, Yong Myung;Yun, Jae Sun;Cho, Hyun Jun;Park, Chung Gon
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.191-199
    • /
    • 2007
  • This paper presents a closing method for a cable-stayed bridge erected by the free cantilever method to produce the initial equilibrium configuration at the final construction stage. To realize the initial equilibrium condition in cable-stayed bridge by the cantilever method, compatibility conditions for vertical displacements, rotational angles, and axial displacements at the closing section of both side girders should be satisfied. In this paper, it was shown that it can be accomplished by using some applicable loads during construction such as the pull-up force of the derrick crane, some cable tension forces, and jacking force at the pylon. The proposed method was applied to a construction stage analysis of a sample bridge to demonstrate its validity, and it was acknowledged that the tower was considerably affected by the compatibility condition for axial displacement in the closing step.

Stability Analysis of Steel Cable-stayed Bridges under Construction Stage (폐합 전 강사장교의 안정성 해석)

  • Kim, Seung-Jun;Shim, Kyung-Suk;Won, Deok-Hee;Cho, Sun-Kyu;Kang, Young-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.1
    • /
    • pp.99-111
    • /
    • 2011
  • This paper presents an investigation of the structural stability of cable-stayed bridges in the construction stage, using geometric nonlinear finite-element analysis and considering various geometric nonlinearities, such as the sag effect of the cables, the P-${\Delta}$ effects of the girder and mast, and the large displacement effect. Initial shape analysis and construction-stage analysis were performed to determine the equilibrium of the structure in the construction stage. After that, geometric nonlinear analysis was performed to study structural stability. In this study, the weight of the derrick crane and the key segment were considered the main external loads, which were applied to the tip of the center span. The cable arrangement type and the stiffness ratios of the girder and mast were considered the main parameters of the analytic research. Based on the results of the analysis, the change in the buckling mode and critical load factors with respect to the cable arrangement type and the stiffness ratios of the girder and mast was investigated. The buckling modes of the steel cable-stayed bridges in the construction stage were classified, and the ranges of the stiffness ratios of the girder and mast, which show these classified buckling modes, were suggested.