• Title/Summary/Keyword: delay-based control

Search Result 1,390, Processing Time 0.031 seconds

Priority-based Scheduling Policy for OpenFlow Control Plane

  • Kasabai, Piyawad;Djemame, Karim;Puangpronpitag, Somnuk
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.13 no.2
    • /
    • pp.733-750
    • /
    • 2019
  • Software Defined Networking (SDN) is a new network paradigm, allowing administrators to manage networks through central controllers by separating control plane from data plane. So, one or more controllers must locate outside switches. However, this separation may cause delay problems between controllers and switches. In this paper, we therefore propose a Priority-based Scheduling policy for OpenFlow (PSO) to reduce the delay of some significant traffic. Our PSO is based on packet prioritization mechanisms in both OpenFlow switches and controllers. In addition, we have prototyped and experimented on PSO using a network simulator (ns-3). From the experimental results, PSO has demonstrated low delay for targeted traffic in the out-of-brand control network. The targeted traffic can acquire forwarding rules with lower delay under network congestion in control links (with normalized load > 0.8), comparing to traditional OpenFlow. Furthermore, PSO is helpful in the in-band control network to prioritize OpenFlow messages over data packets.

Distributed Control of DC Servo Motor on LonWorks-IP Virtual Device Network for Predictive and Preventive Maintenance (LonWorks-IP 가상 디바이스 네트워크상에서 예지 및 예방보전을 위한 DC 서보모터의 분산제어)

  • Song, Ki-Won
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.25-32
    • /
    • 2006
  • LonWorks over IP(LonWorks-IP) virtual device network(VDN) is an integrated form of LonWorks device network and IP data network. In especially real-time distributed servo applications on the factory floor, timely response is essential for predictive and preventive maintenance. The time delay in servo control on LonWorks-IP based VDN has highly stochastic nature. LonWorks-IP based VDN induced transmission delay deteriorates the performance and stability of the real-time distributed control system and can't give an effective preventive and predictive maintenance. In order to guarantee the stability and performance of the system, and give an effective preventive and predictive maintenance, LonWorks-IP based VDN induced time-varying uncertain time delay needs to be predicted and compensated. In this paper new Pill control scheme based on Smith predictor, disturbance observer and band pass filter is proposed and tested through computer simulation about position control of DC servo motor. It is shown that how can the proposed control scheme be designed to minimize the effects of uncertain varying time delay and model uncertainties. The validity of the proposed control scheme is compared and demonstrated with the comparison of internal model controllers(IMC) based on Smith predictor with and without disturbance observer.

Position Control of Linear Actuator with Uncertain Time Delay in VDN

  • Kim, Jonghwi;Kiwon Song;Park, Gi-Sang;Park, Gi-Heung
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.118.2-118
    • /
    • 2002
  • Uncertain time delay happens when the process reads the sensor data and sends the control input to the plant located at a remote site in distributed control system. As in the case of data network using TCP/IP, VDN that integrates both device network and data network has uncertain tim e delay. Uncertain time delay can cause degradation in stability of distributed control system based on VDN. This paper investigates the transmission characteristic of VDN and suggests a control scheme based on the Smith's predictor to minimize the effect of uncertain time delay. The validity of the proposed control scheme is demonstrated with tracking position control of experiments.

  • PDF

Passive-based Bilateral Controller Design under Varying Time Delay

  • Gu, Ying;Chong, Kil-To
    • Proceedings of the IEEK Conference
    • /
    • 2009.05a
    • /
    • pp.97-99
    • /
    • 2009
  • Bilateral teleoperation systems, connected to computer networks such as Internet have to deal with the time delay varying depending on factors such as congestion, bandwidth or distance. And the entire system is easy to become unstable due to irregular time delay. Passivity concept has been using as a framework to solve the stability problem in bilateral control of teleoperation. Acontrol scheme for teleoperation systems with varying time delay is proposed based on a passivity concept is proposed in this paper. One approach makinguse of the characteristic impedances is proposed to achieve a passive control. Since passive control does not mean that the system performance will be acceptable, another transmission scheme which focuses on both the passive feature and the acceptable performance is configured for varying time delay in this paper. The tracking performance has been proved through the computer simulation for varying time delay bilateral teleoperation system using Matlab Simulink.

  • PDF

End-to-end Delay Analysis and On-line Global Clock Synchronization Algorithm for CAN-based Distributed Control Systems (CAN 기반 분산 제어시스템의 종단 간 지연 시간 분석과 온라인 글로벌 클럭 동기화 알고리즘 개발)

  • Lee, Hee-Bae;Kim, Hong-Ryeol;Kim, Dae-Won
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.677-680
    • /
    • 2003
  • In this paper, the analysis of practical end-to-end delay in worst case is performed for distributed control system considering the implementation of the system. The control system delay is composed of the delay caused by multi-task scheduling of operating system, the delay caused by network communication, and the delay caused by the asynchronous between them. Through simulation tests based on CAN(Controller Area Network), the proposed end-to-end delay in worst case is validated. Additionally, online clock synchronization algorithm is proposed here for the control system. Through another simulation test, the online algorithm is proved to have better performance than offline one in the view of network bandwidth utilization.

  • PDF

Time Delay Prediction of Networked Control Systems using Cascade Structures of Fuzzy Neural Networks (종속형 퍼지 뉴럴 네트워크를 이용한 네트워크 제어 시스템의 시간 지연 예측)

  • Lee, Cheol-Gyun;Han, Chang-Wook
    • Journal of IKEEE
    • /
    • v.23 no.3
    • /
    • pp.899-903
    • /
    • 2019
  • In networked control systems, time-varying delay of the transmitting signal is inevitable. If the transmission delay is longer than the fixed sampling time, the system will be unstable. To solve this problem, this paper proposes the method to predict the delay using logic-based fuzzy neural networks, and the predicted time delay will be used as a sampling time in the networked control systems. To verify the effectiveness of the proposed method, the delay data collected from the real system are used to train and test the logic-based fuzzy neural networks.

Development of Coordinated Scheduling Algorithm and End-to-end Delay Analysis for CAN-based Distributed Control Systems (CAN기반 분산 제어시스템의 종단 간 지연시간 분석과 협조 스케줄링 알고리즘 개발)

  • 이희배;김홍열;김대원
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.53 no.7
    • /
    • pp.501-508
    • /
    • 2004
  • In this paper, a coordinated scheduling algorithm is proposed to reduce end-to-end delay in distributed control of systems. For the algorithm, the analysis of practical end-to-end delay in the worst case is performed priory with considering implementation of the systems. The end-to-end delay is composed of the delay caused by multi-task scheduling of operating systems, the delay caused by network communications, and the delay caused by asynchronous timing between operating systems and network communications. Through some simulation tests based on CAN(Controller Area Network), the proposed worst case end-to-end delay analysis is validated. Through the simulation tests, it is also shown that a real-time distributed control system designed to existing worst case delay cannot guarantee end-to-end time constraints. With the analysis, a coordinated scheduling algorithm is proposed here. The coordinated scheduling algorithm is focused on the reduction of the delay caused by asynchronous timing between operating systems and network communications. Online deadline assignment strategy is proposed for the scheduling. The performance enhancement of the distributed control systems by the scheduling algorithm is shown through simulation tests.

An effective online delay estimation method based on a simplified physical system model for real-time hybrid simulation

  • Wang, Zhen;Wu, Bin;Bursi, Oreste S.;Xu, Guoshan;Ding, Yong
    • Smart Structures and Systems
    • /
    • v.14 no.6
    • /
    • pp.1247-1267
    • /
    • 2014
  • Real-Time Hybrid Simulation (RTHS) is a novel approach conceived to evaluate dynamic responses of structures with parts of a structure physically tested and the remainder parts numerically modelled. In RTHS, delay estimation is often a precondition of compensation; nonetheless, system delay may vary during testing. Consequently, it is sometimes necessary to measure delay online. Along these lines, this paper proposes an online delay estimation method using least-squares algorithm based on a simplified physical system model, i.e., a pure delay multiplied by a gain reflecting amplitude errors of physical system control. Advantages and disadvantages of different delay estimation methods based on this simplified model are firstly discussed. Subsequently, it introduces the least-squares algorithm in order to render the estimator based on Taylor series more practical yet effective. As a result, relevant parameter choice results to be quite easy. Finally in order to verify performance of the proposed method, numerical simulations and RTHS with a buckling-restrained brace specimen are carried out. Relevant results show that the proposed technique is endowed with good convergence speed and accuracy, even when measurement noises and amplitude errors of actuator control are present.

A Time Delay-Based Gain Scheduled Control and It's Application to Electromagnetic Suspension System (시간지연 이득계획제어와 자기부상시스템에의 응용)

  • Hong Ho-Kyung;Jo Jeong-Min;Cho Heung-Jae
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.54 no.12
    • /
    • pp.569-575
    • /
    • 2005
  • This paper proposes a gain scheduled control technique using time-delay for the nonlinear system with plant uncertainties and unexpected disturbances. The time delay-based gain scheduled control depends on a direct estimation of a function representing the effect of uncertainties. The information from the estimation is used to cancel the unknown dynamics and the unexpected disturbances simultaneously. The proposed estimation scheme with a finite convergence time is formulated in order to estimate the unknown scheduling variable variation. In other words, the time delay-based gain scheduled control uses the past observation of the system's response and the control input to directly modify the control actions rather than to adjust the controller gains or to identify system parameters. It has a simple structure so as to minimize the computational burden. The benefits of this proposed scheme are demonstrated in the simulation of an electromagnetic suspension system with plant uncertainties and external disturbances, and the proposed controller is compared with the conventional state feedback controller.

Maximum Allowable Delay Bounds and Real-time Scheduling Method of Networked Discrete-time Control Systems (네트워크 기반 이산 시간 제어 시스템의 최대 허용 지연 한계 및 실시간 스케줄링 기법에 관한 연구)

  • Kim Dong-Sung;Choi Dong-Hyuk
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.12 no.7
    • /
    • pp.719-727
    • /
    • 2006
  • This paper proposes a new method to obtain a maximum allowable delay bound for a scheduling of networked discrete control systems and event-based scheduling method. The proposed method is formulated in terms of linear matrix inequalities and can give a much less conservative delay bound than the existing methods. A network scheduling method is presented based on the delay obtained through the proposed method, and it can adjust the sampling period to allocate same utilization to each control loop. The presented method can handle three types of data (sporadic, emergency data, periodic data and non real-time message) and guarantees real-time transmission of periodic and sporadic emergency data using modified EDF scheduling method.