• 제목/요약/키워드: delay management

검색결과 1,196건 처리시간 0.03초

급성심근경색 환자에서 재관류 치료 지연율과 그에 관련된 요인 (Factors associated with delay in reperfusion therapy in patients with acute myocardial infarction)

  • 김윤;고봉련
    • 보건행정학회지
    • /
    • 제13권4호
    • /
    • pp.115-130
    • /
    • 2003
  • Reperfusion delay in patients with acute myocardial infarction leads to increased morbidity and mortality. We sought to measure the rates of reperfusion delay and to identify factors associated with reperfusion delay after arrival to hospitals. We included 360 patients who had acute myocardial infarction with ST-elevation or left bundle branch block on electrocardiogram and received reperfusion therapy from the three participating academic medical centers from 1997 to 2000. Through retrospective chart review, we collected data about time to reperfusion therapy, patient and hospital factors potentially associated with reperfusion delay. Factors independently associated with reperfusion delay were determined by logistic regression analysis. Median door­to­needle time was 60.0 minutes, and median door­to­balloon time was 102.5 minutes. According to recommendation of the American College of Cardiology/American Heart Association Guidelines, 226 out of 264(85.6%) of thrombolytic patients and 43 out of 96(44.8%) percutaneous transluminal coronary angioplasty(PTCA) patients experienced reperfusion delay. The significant factors associated with delay were type of reperfusion therapy, patient factors including hypertension and delayed symptom onset to presentation(>4 hours), and hospital factors including nocturnal presentation(6pm∼8am), weekend, and an individual hospital. A significant proportion of patients experienced reperfusion delay. The identified predictors of reperfusion delay may help design a hospital system to reduce the delay in reperfusion therapy

Priority Assignment Procedure in Multi-Product Disassembly

  • Min, Sundong;Matsuoka, Shinobu;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • 제3권1호
    • /
    • pp.12-21
    • /
    • 2004
  • This paper investigates the design of a priority rule in a multi-product disassembly environment. Specifically, it is concerned with product scheduling by which the inventory control of disassembled parts can be incorporated into a priority rule to reduce part lead times. The part lead time consists of two components: flow time and supply delay. The primary focus of the paper is on the development of a disassembly priority rule that aims to reduce the supply delay. We propose a priority rule, called Minimum Distance (MD) rule, to improve the supply delay performance. Finally, we provide a comparative analysis on the performance of traditional rules and the new rule proposed in this paper via a simulation model.

무엇이 정보시스템 프로젝트 일정을 지연시키는가? (What Factors Make the Delay of the Information System Project Implementation?)

  • 성병욱;박상철;고준
    • 지식경영연구
    • /
    • 제22권1호
    • /
    • pp.1-19
    • /
    • 2021
  • 대규모 병원정보시스템 프로젝트가 계획 대비 지연되는 경우가 종종 발생하고 있다. 따라서 프로젝트 관리 측면에서 일정 지연을 촉발하는 원인을 검토하고 지연 유발 요인들 간 인과관계 분석이 필요하다. 본 연구는 근거이론 방법론을 활용하여 병원정보시스템 개발 프로젝트 사례에 대한 일정 지연 요인을 발견하고 이들 간의 인과관계를 파악하고자 한다. 연구 결과, '비현실적 일정 수립'은 도미노 현상과 같이 전반적인 일정 지연에 영향을 미치고, '기존 시스템 분석 미흡'은 분석 품질의 저하를 야기하는 반면 '서브시스템 통합 인터페이스 부실'은 설계 품질의 저하로 이어졌다. 본 연구는 학술적인 측면에서 프로젝트 지연에 영향을 미치는 요인을 찾아내고 지연 요인들 간의 인과 관계를 분석하였으며, 실무적 관점에서는 System Integration (SI) 기업, 병원, 프로젝트 관리자 입장에서 프로젝트 일정 지연을 최소화할 수 있는 방안을 제시한 점에 의의가 있다.

국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로 (A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases)

  • 황정오;오현승;최봉완;임동순
    • 산업경영시스템학회지
    • /
    • 제43권4호
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.

Development of Delay Responsibility Determination Model based on the Probabilistic Risk Analysis

  • Cho, Ji Hoon;Lim, Dong Yui;Kim, Sang Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.599-599
    • /
    • 2015
  • This research attempts to resolve the construction delay issues of indirect delays by developing the "Delay Responsibility Determination Model" (DRM) based on probabilistic risk analysis. DRM is envisioned to provide a way of quantitatively analyzing impacts of delayed activities while considering both direct and indirect influences. With the successful development of DRM, it would be possible to present relative probabilistic measures to all the related stakeholders in terms of their contributions to schedule delays. Upon the development completion of DRM, "Korean Construction Delay Claim/Dispute Resolution Protocols" will also be prepared to facilitate the effective use of DRM.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

건설공사의 작업지연 원인분석 프로세스 (THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION)

  • 지근창;김창덕;유정호
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.138-148
    • /
    • 2006
  • 작업의 지연을 줄이거나 예방하기 위해서는 작업지연상황을 지속적으로 확인하여 작업지연을 야기하는 원인을 찾아내고 대책을 세워야 한다. 그래서 지금까지 작업지연기간 산정방법 또는 작업지연의 클레임 사례에 관한 연구 등이 이루어졌으나 프로젝트 종료 후 결과에 의한 분석방법이나 원인분류체계를 제시한 것이 대부분이다. 건설 프로젝트는 동일한 조건하에서도 주변 환경에 따라 결과값이 다르게 나타나는 일회성이 강한 분야 중에 하나이다. 따라서 공사 진행 중에 발생하는 작업지연에 대해 효과적으로 대처할 수 있는 분석방법과 절차가 필요하다. 본 연구는 작업지연 원인분석 범위를 프로젝트내의 현장관리 분야로 국한하고 작업지연 원인분류 체계를 투입요소를 대상으로 작업지연 원인인자와 작업지 연 원인속성으로 나눴다. 작업지 연 원인분류 체계는 전문가 인터뷰 및 설문조사를 통해 검증하고 작업지 연 원인속성 및 원인인자의 특성을 분석하고 VSM을 응용한 작업지연 원인 분석방법 및 절차를 제시한다.

건설공사 생산성 관리를 위한 데이터모델 (Datamodel for Productivity Management of Construction Project)

  • 류한국;유정호;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.442-445
    • /
    • 2002
  • 건설공사 클레임 중에서 공기지연 클레임의 발생빈도가 높다. 공기지연 클레임은 발주자와 원도급자 모두에게 프로젝트 자체의 경제적 문제 뿐 만 아니라 회사의 존폐와 관련이 된다. 체계적인 증빙자료의 부재로 인하여 산정방법이 정량적이지 못하기 때문에 공기지연 클레임을 공평하게 해결하는 데 어려움이 많다. 따라서, 건설공사 단계에서 공사정보 또는 증빙자료를 체계적으로 구축할 수 있어야 한다. 본 연구는 예비적 고찰로 공기지연 클레임 데이터베이스의 기존 연구와 문제점을 고찰하였다. 단계별 공정표와 데이터베이스 연계구축 방안을 제시하였고, 건설생산성 데이터베이스 구축을 위한 요구정보에 근거하여 개념적 데이터모델링과 논리적 데이터모델링을 통한 건설공사 생산성 관리를 위한 데이터 모델링을 구축하였다. 이에 본 연구는 손실생산성을 고려한 공기지연일수 산정을 위해 건설공사 생산성 관리를 위한 데이터모델의 구축을 목적으로 한다.

  • PDF

Traffic and Resource Management for Provisioning QoE in Mobile Communication Networks

  • Lee, Moon-Ho;Lee, Jong-Chan
    • 한국컴퓨터정보학회논문지
    • /
    • 제21권11호
    • /
    • pp.65-71
    • /
    • 2016
  • This paper proposes a novel traffic and resource management scheme based on Service Level Agreement (SLA) which allows to guarantee the quality of experience (QoE) for various high-quality mobile multimedia service users to a certain level. For this purpose, QoE-SLA coupling structure is considered and a novel scheme is suggested to suppress the processing delay of the mobile terminal and to decrease the transfer delay in the transmission network. According to simulation results, our proposed scheme can increase the total throughput and decrease the average delay by adjusting SLA.

RFID와 바코드가 적용된 검수작업의 대기비용 비교를 위한 시뮬레이션 (A Study on RFID and Bar-code System Simulations for Delay Time Cost in DC Inspection Process)

  • 박성미;김정자
    • 산업경영시스템학회지
    • /
    • 제30권4호
    • /
    • pp.111-117
    • /
    • 2007
  • Comparing with bar-code systems, RFID systems can supply more efficient work. Using RFID systems, logistic management systems could be helped effectively to gather real-time information. It's available to reduce the working time and object's delay time, and to deal with real-time information by using RFID system. Until now, based on how many pallets used, there is few study about best workload of RFID system. Therefore, in this study, both bar-code and RFID system simulations were executed for inspection process in distribution center. As a result, following the ware pallet quantity, the total cost of both working time and other delay times were calculated and the sensitivity analysis of total cost trend was executed.