• Title/Summary/Keyword: delay components

Search Result 329, Processing Time 0.029 seconds

Channel Estimation Method Using Power Control Schemes in Wireless Systems

  • Kim, Byoung-Gi;Ryoo, Sang-Jin
    • Journal of Communications and Networks
    • /
    • v.12 no.2
    • /
    • pp.140-149
    • /
    • 2010
  • Green communication is a new paradigm of designing the communication system which considers not only the processing performance but also the energy efficiency. Power control management is one of the approaches in green communication to reduce the power consumption in distributed communication system. In this paper, we propose improved power control schemes for mobile satellite systems with ancillary terrestrial components (ATCs). In order to increase system capacity and reduce the transmitting power of the user's equipment, we propose an efficient channel estimation method consisting of a modified open-loop power control (OLPC) and closed-loop power control (CLPC). The OLPC works well if the forward and reverse links are perfectly correlated. The CLPC is sensitive to round-trip delay and, therefore, it is not effective in a mobile satellite system. In order to solve the above problem, we added monitoring equipment to both the OLPC and CLPC to use information about transmitting power that has not yet been received by the receiver over the satellite/ATC channel. Moreover, we adapted an efficient pilot diversity of both OLPC and CLPC in order to get a better signal to interference plus noise ratio estimation of the received signal.

A Study on the Process of Tower Crane Construction Planning in Steel Structure (철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구)

  • Jung, Deok-Gi;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.145-146
    • /
    • 2011
  • Lifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.

  • PDF

SAFETY ANALYSIS OF INCREASE IN HEAT REMOVAL FROM REACTOR COOLANT SYSTEM WITH INADVERTENT OPERATION OF PASSIVE RESIDUAL HEAT REMOVAL AT NO-LOAD CONDITIONS

  • SHAO, GE;CAO, XUEWU
    • Nuclear Engineering and Technology
    • /
    • v.47 no.4
    • /
    • pp.434-442
    • /
    • 2015
  • The advanced passive pressurized water reactor (PWR) is being constructed in China and the passive residual heat removal (PRHR) system was designed to remove the decay heat. During accident scenarios with increase of heat removal from the primary coolant system, the actuation of the PRHR will enhance the cooldown of the primary coolant system. There is a risk of power excursion during the cooldown of the primary coolant system. Therefore, it is necessary to analyze the thermal hydraulic behavior of the reactor coolant system (RCS) at this condition. The advanced passive PWR model, including major components in the RCS, is built by SCDAP/RELAP5 code. The thermal hydraulic behavior of the core is studied for two typical accident sequences with PRHR actuation to investigate the core cooling capability with conservative assumptions, a main steam line break (MSLB) event and inadvertent opening of a steam generator (SG) safety valve event. The results show that the core is ultimately shut down by the boric acid solution delivered by Core Makeup Tank (CMT) injections. The effects of CMT boric acid concentration and the activation delay time on accident consequences are analyzed for MSLB, which shows that there is no consequential damage to the fuel or reactor coolant system in the selected conditions.

Development of FROG Hardware and Software System for the Measurement of Femto-Seconds Ultrashort Laser Pulses (지속시간 펨토초 수준의 빛펄스틀 재는 이차조화파발생 프로그(SHG FROG) 장치 개발)

  • 양병관;김진승
    • Korean Journal of Optics and Photonics
    • /
    • v.15 no.3
    • /
    • pp.278-284
    • /
    • 2004
  • A Second Harmonic Generation Frequency Resolved Optical Gating(SHG FROG) system was developed. Its performance test shows that it is capable of accurately measuring the temporal evolution of the electric field, both amplitude and phase, of femtosecond light pulses. For the retrieval of the temporal evolution of light pulses from their spectrograms obtained by using the FROG system, Principal Components Generalized Projection(PCGP) algorithm is used and in addition we used additional constraints of second-harmonic spectrum, marginals in frequency and time-delay of the spectrogram. Such modification of the software brings about significant improvement in speed and stability of the pulse retrieval process.

A Study on the Thermal Characteristics of LPG and Hydrox Gas Cutting (Hydrox Gas 절단과 LPG 절단의 열적특성에 관한 연구)

  • Kim, Hong-Gun;Kwac, Lee-Ku
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.19 no.2
    • /
    • pp.301-305
    • /
    • 2010
  • Cutting procedures where qualities are determined by various demand factors largely influences shipbuilding productivity. Particularly, defects in cutting shapes and cutting surface results in delay for post shipbuilding stages such as in welding and assemblage lines which could become factors for reduced economic viability of the project. Existing cutting procedures utilize fossil fuels such as propane or ethylene as the main fuel component and these methods applied particularly to ship plate cutting gives relatively slow cutting speed and generates large quantities of harmful and sometimes poisonous polluting fumes of which warrants an urgent need to look for alternative cutting methods. Recent introduction of hydrox gas generated by electrically dissociating water into hydrogen and oxygen components to be utilize as an alternative cutting fuel has resulted not just in visible improvement on cutting quality and speed over the existing methods but it has also been welcomed as an environmentally friendly clean fuel source. This paper has been prepared to serve as the basis for accommodating this environmentally friendly hydrox gas cutting method into actual working environment by observing and recording hydrox gas cutting thermal characteristics.

A Study on the Practical Suggestions in the Contract for the Turnkey Supply of an Industrial Plant - Focused on the Commentary of ICC Model Contract - (턴키방식 플랜트계약의 실무상 유의점에 관한 연구 - ICC 표본 계약서의 해설을 중심으로 -)

  • Oh, Won-Suk;Lee, Ki-Ok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.53
    • /
    • pp.3-29
    • /
    • 2012
  • This article examines the Practical Suggestions in the Contract for the Turnkey Supply of an Industrial Plant based on a study focused on the commentary of "ICC Model Contract" clause which is encouraged by ICC. Especially practical issues are inquired into on business and legal perspective as follows. First, in regard to supply of technical documentation, equipment and spare parts, it is important to supplier and purchaser to agree on obtaining technical documents necessary for installing and operating plant, and also components necessary for it's maintenance. Second, it is about erection, testing, taking over and training chapter. Both parties need to agree about the process of the arrival of equipments and assembly conducted by the supplier and following examination and also training purchaser to operate it Third, when it comes to price, payment conditions, bank guarantees, parties are to make decision on the pricing, payment conditions and currency of contract-payment. Lastly, it is necessary to reach an agreement of the issue of whether it is to be defined as delay or non-performance of the contract and also it's consequences about rights and obligation.

  • PDF

Design and Fabrication of a Multiple Scattering Points Discriminator for a Simulated Target Measurement using a High Range Resolution RADAR (고해상도 레이다를 이용한 모의 대상물 측정용 다중산란점 분별기의 설계 및 제작)

  • Jeong, Hae-Chang
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.3
    • /
    • pp.323-330
    • /
    • 2018
  • In this paper, design and fabrication of a MSP(Multiple Scattering Points) discriminator for a simulated target measurement using a HRR(High Range Resolution) RADAR are described. The MSP discriminator is designed to provide a reference signal at the installed point on the simulated target in an outdoor test. The MSP discriminator is designed to have a remote control function that can turn the MSP discriminator on and off when the target moves to a remote location. While the MSP discriminator is off, the MSP discriminator is designed to be small enough not to spoil the target's unique RCS. The MSP discriminator consists of RF components in the Ku-band. In order to prevent spreading of the signal, a cable were added to the MSP discriminator to have an appropriate feedback loop delay considering the resolution of the RADAR. The fabricated MSP discriminator provided a reference scattering point as an RCS of approximately 1 dBsm. As a result, by using the MSP discriminator, the physical scattering points of the target were clearly identified in the measured signals with the RADAR.

Active vibration isolation of a hydraulic system using the hetero-synaptic neural network (헤테로-시넵틱 신경회로망을 이용한 유압시스템의 진동제어)

  • 정만실;조동우
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.04b
    • /
    • pp.273-277
    • /
    • 1995
  • Many hudraulic components have nonlinearities to some extent. These nonlinearities often cause the time delay, thus degrading the performance of the hydraulic control systems and making it difficult to modelthem. In this paper, a new vibration isolation control algorithm that eliminates the necessity of a sophiscated modeling of hydraulic system was proposed. The algotithm is a hybrid type control shecheme consisting of a linear controller and a hetero-synaptic neural network controller. Using this control scheme, simulations and experiments were performed for 1 DOF(Degree of freedom) and 2 DOF vibration isolation. The hybrid type control algorithm can isolate the base vibration signifcantly rather than linear control algorithm. And from the weights in hetero-synaptic neural network, we can get the 2nd equivalent differentialmodel of the hydraulic control system with on-line control operation. This equivalent model provides us with much information, such as stability and the characteristics of the control system.

  • PDF

Study of the Superconductive Pipelined Multi-Bit ALU (초전도 Pipelined Multi-Bit ALU에 대한 연구)

  • Kim, Jin-Young;Ko, Ji-Hoon;Kang, Joon-Hee
    • Progress in Superconductivity
    • /
    • v.7 no.2
    • /
    • pp.109-113
    • /
    • 2006
  • The Arithmetic Logic Unit (ALU) is a core element of a computer processor that performs arithmetic and logic operations on the operands in computer instruction words. We have developed and tested an RSFQ multi-bit ALU constructed with half adder unit cells. To reduce the complexity of the ALU, We used half adder unit cells. The unit cells were constructed of one half adder and three de switches. The timing problem in the complex circuits has been a very important issue. We have calculated the delay time of all components in the circuit by using Josephson circuit simulation tools of XIC, $WRspice^{TM}$, and Julia. To make the circuit work faster, we used a forward clocking scheme. This required a careful design of timing between clock and data pulses in ALU. The designed ALU had limited operation functions of OR, AND, XOR, and ADD. It had a pipeline structure. The fabricated 1-bit, 2-bit, and 4-bit ALU circuits were tested at a few kilo-hertz clock frequency as well as a few tens giga-hertz clock frequency, respectively. For high-speed tests, we used an eye-diagram technique. Our 4-bit ALU operated correctly at up to 5 GHz clock frequency.

  • PDF

Impulsive sound localization using crest factor of the time-domain beamformer output (빔형성기 출력의 파고율을 이용한 충격음의 방향 추정)

  • Seo, Dae-Hoon;Choi, Jung-Woo;Kim, Yang-Hann
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.713-717
    • /
    • 2014
  • This paper presents a beamforming technique for locating impulsive sound source. The conventional frequency-domain beamformer is advantageous for localizing noise sources for a certain frequency band of concern, but the existence of many frequency components in the wide-band spectrum of impulsive noise makes the beamforming image less clear. In contrast to a frequency-domain beamformer, it has been reported that a time-domain beamformer can be better suited for transient signals. Although both frequency- and time-domain beamformers produce the same result for the beamforming power, which is defined as the RMS value of its output, we can use alternative directional estimators such as the peak value and crest factor to enhance the performance of a time-domain beamformer. In this study, the performance of three different directional estimators, the peak, crest factor and RMS output values, are investigated and compared with the incoherent interfering noise embedded in multiple microphone signals. The proposed formula is verified via experiments in an anechoic chamber using a uniformly spaced linear array. The results show that the peak estimation of beamformer output determines the location with better spatial resolution and a lower side lobe level than crest factor and RMS estimation in noise free condition, but it is possible to accurately estimate the direction of the impulsive sound source using crest factor estimation in noisy environment with stationary interfering noise.

  • PDF