• Title/Summary/Keyword: defective and nearly defective system

Search Result 4, Processing Time 0.019 seconds

Design procedure for modal controllers for defective and nearly defective systems

  • Chen, Yu Dong;Chen, Su Huan;Yang, Guang
    • Structural Engineering and Mechanics
    • /
    • v.15 no.5
    • /
    • pp.551-562
    • /
    • 2003
  • This paper presents a procedure for designing feedback controllers for defective systems with repeated eigenvalues, and also for a nearly defective system with close eigenvalues. For the nearly defective system, we first transform it into a defective one, and then apply the same method to deal with the nearly defective system. A method for computing the gain matrices is discussed here. The methodologies proposed are based on the modal coordinate equation to avoid the tedious mathematical manipulation. As an application of the present procedure, a numerical example is given.

Multi-stage design procedure for modal controllers of multi-input defective systems

  • Chen, Yu Dong
    • Structural Engineering and Mechanics
    • /
    • v.27 no.5
    • /
    • pp.527-540
    • /
    • 2007
  • The modal controller of single-input system cannot stabilize the defective system with positive real part of repeated eigenvalues, because some of the generalized modes are uncontrollable. In order to stabilize the uncontrollable modes with positive real part of eigenvalues, the multi-input system should be introduced. This paper presents a recursive procedure for designing the feedback controller of the multi-input system with defective repeated eigenvalues. For a nearly defective system, we first transform it into a defective one, and apply the same method to manage. The proposed methods are based on the modal coordinate equations, to avoid the tedious mathematic manipulation. As an application of the presented procedure, two numerical examples are given at end of the paper.

- An Empirical Research on the Product Liability Response System for Consumer Safety- (소비자 안전을 위한 제조물 책임 대응시스템에 관한 실증적 연구)

  • Kim Jin Yong;Oh Byeong Wan
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.3
    • /
    • pp.65-75
    • /
    • 2004
  • Product liability is the law of the manufacturer's responsibilities for the consumers' personal injuries or the losses of property resulted from defective products. In today's many countries, the product liability law are being enacted because of the safety of product use and the protection of consumer's right. In korea, the product liability is going to enforce on July 1, 2002. Though the construction of product liability response system is urgent situation, domestic manufacture company's PL response system is not nearly prepared in present. Consequently, the purpose of this study is to discuss the Quality Management's importance and the PL countermeasures by presenting the difference of PL response system construction degree by the Quality Management Maturity degree

Studies on the method of bring to perfectly from defective cutting Sapling (삽목재육묘의 육함에 관한 연구)

  • 김문협
    • Journal of Sericultural and Entomological Science
    • /
    • no.11
    • /
    • pp.31-44
    • /
    • 1970
  • This experiment is conducted fer method cf bring to perfectly from defective cutting sapling 25 a production method of sapling which is to substitute for conventional graf ting. 1. In green wood cutting root comes out after 15 days of cutting with nearly straight development of root system; after 40 days of cutting, roots with total length of 1119 mms 43 roots, and 5.4 grs a root in total weight obtained. 2. Survival percentage of green wood cutting ranges between 56% and 90%, average 73% of that and it varies with natural characteristics of varietes. The results show variety of Gaeryang-Suban and Iljiroe with 80% as a best ones in contrast with the variety of Shipyung. 3. The varietics or Gaeryang-Suban. Iljiroe, Suwon-Sang No.4, Rosang makes of much more roots than Yongchonchuwoo and Shipyung do. 4. Root ability made good number of roots commercially, when cutting is conducted soaking in 0.01 % NAA solution or 0.02% NAA solution for 2 or 3 seconds as a chemical promoter. 5. Economical measures for increase of scion adapted 1) 2 scions from a green wood 50 cm long should be taken and basal pan of scion at its middle portion should be cut right under the node. 2) Scions below 50cm long may be used. Small scions or growthceased shoots h3ve also considerable root ability enough to be used. 3) Thus far, up 100,000 scions might be produced in 10 a. 6. We can find number of root increased, when cutting the opposite side in obliquity manner at 450. 7. When 110,000 saplings in 10 a. for the production of bring to perfectly from defective cutting sapling planted, quality of stocks does not go to bad condition without any obstacles in practical use. 8. Although the times or grafting delayed until middle of July, quality of sapling goes just a little down. Grafting may be conducted from early June to middle of July separately in several times, and the green wood of prunned mulberry in spring is available for a scion after end of June. 9. 10 grs weight of defective cutting sapling makes 95% of complete sapling, otherwise 5 or 10 grs in weight of one becomes 80% of complete sapling with its quality as similar as grafted one. 10. When the sapling planted, its branches should be cut, leaving 3 or 4 buds at the bottom of new branches. 11. In view of economical stand point, production cost of bring to perfectly from defective cutting sapling obtains 52% of grafting cost.

  • PDF