• Title/Summary/Keyword: defect warranty liability

Search Result 15, Processing Time 0.021 seconds

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.

Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building (공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구)

  • Seo, Deok-Seok;Park, Jun-Mo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

On the problem and improvements about 'End of Confirmation for Defect Liliability' on the Management of Apartment Houses Decree (공동주택관리법 하자담보책임 종료 확인 절차의 문제점 및 개선방안)

  • Kim, Jin-Kuk;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.274-275
    • /
    • 2017
  • Decree on the Management of Apartment Houses. Article 36 (Liability for warranty Repair Defects), Article 37 (About Repair Defect, etc), and its implementing ordinances, Article 36 (Term of warranty liability) Article 37 (Defect criteria), Article 38 (procedure of Repair defect), Article 39 (type of warranty liability), Enforcement Rule Article 17 (Certifiation of warranty liability). On the basis of the upper Decree, In spite of Standard and forms of 'Completion of Repair Defect' was exist, it was hard to receive 'End of Confirmation' in practice. The purpose of this study is to propose basics in order that Practitioners can apply problems and improvements about Decree on the Management of Apartment Houses.

  • PDF

A Study on the Term of Warranty Liability by the Law-suit Requesting of the Guarantee against Defects in the Apartment Building (공동주택 하자보증금 청구소송에 의한 하자담보책임기간 연구)

  • Koo, Hae-Shik
    • KIEAE Journal
    • /
    • v.12 no.3
    • /
    • pp.11-18
    • /
    • 2012
  • The purpose of this study is to contribute to solution of the defect dispute in apartment house in advance. We want to propose the improved devices in defect problems by investigating the money that exacted from the practical business of the inspection company and the money that a judge gave a decision in a civil court in 50 cases of the lawsuit to requesting the guarantee against defects and the improved schemes of the applied rate by analyzing the diagnosis money of each applied years about the term of warranty liability in 40 cases of the lawsuit separately from that. As the result, we have to reflect the defect of non construction and error construction on apartment building defects, which recognizes very important factor when we compute the defect repair warranty money and it needs to be rearranged the applied ratio in guarantee peried of housing law practically.

An Analysis of Defects Apartment Houses Occurring during the Term of Warranty Liability (하자담보책임기간에 발생하는 공동주택 하자 분석)

  • Yu, Byong-Jae;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.135-136
    • /
    • 2022
  • Defects caused by apartment houses have the term of warranty liability according to the enforcement ordinance of Acts of the Management of Apartment Houses. In case when defects occur during the term, free defect maintenance can be provided from the construction company. Yet, there occur conflicts between the construction company and residents, as to whether there occur defects or not. To resolve these conflicts, this study aimed to analyze construction classification and types that need managing, based on defects of apartment houses occurring during the term of warranty liability. This research analyzed 138,576 cases of data, as of five apartment house complexes. For the construction classification for defects of apartment houses, wooden flooring products accounted for the highest rate, followed by paper hanging, and wooden window. For the construction types of defects, torn/scratching took up with the highest rate, followed by the condition of defect in fixing and operating. In order to embody defects occurring during the term of warranty liability, into the visualization technique, this researcher utilized the word cloud method. This study will pursue the method for maintaining defects during the term of warranty liability, in the subsequent research, using the data that this research presented.

  • PDF

A Study on the Interpretation Trend of Current Cases for Warranty in U.S.A (미국의 Warranty 제도와 관련된 판례동향 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.101-109
    • /
    • 2010
  • Under the Civil Code and related law in Korea, the liability for defects after delivery belongs to the Contractor. However, various disputes have occurred in relation to the remedy of such defects and the compensation for damages, which are the main liability of a contractor in the event of defects. Despite court decisions regarding defect liability, many problems prevail in the real world. For this reason, this working-level research considers the introduction of a performance warranty contract system. To establish the system successfully, it is necessary to analyze the trend of various warranty cases in the US. Therefore, the warranty system of the US was first examined, and the effect of acceptance, notification and burden of proof, remedies under warranty clauses, and default termination were investigated and analyzed in this study.

Basic Research on Evaluation of Defect Repair Period of Finishing Works in Apartment Houses according to Performance Data (실적자료에 의한 공동주택 마감공사의 하자보수기간의 적절성 평가 기초연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.245-246
    • /
    • 2015
  • Cases of lawsuit and conflict are increasing because of defects in apartments in use after the completion of construction. Further, with changes in the consciousness of residents and in the social environment, many residents are showing interest in defect-related lawsuits. However, the term of warranty liability defined in the current law is not practically appropriate, and the verification of the determination of the term of warranty liability is insufficient. Against this background, this research aims to evaluate the appropriateness of defect repair periods by examining the actual defect condition of the finishing work among the various defects related to apartments. Collected performance data are analyzed by statistical techniques by considering the defect occurrence rate per construction type and the construction year of the finishing work in apartment construction. The analysis results will be used as basic data for evaluating the appropriateness of the standards for the term finishing works warranty liability.

  • PDF

Study on the Defects of Finishing Works of Apartment Houses during Warranty Liability Period and its Correlation (공동주택 마감공사의 하자보수기간 현황 및 연관성 연구)

  • Lee, Ung-Kyun;Seo, Deok-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.385-391
    • /
    • 2017
  • The warranty liability period for defects in apartment buildings by work type is not based on scientific analysis, making the appropriateness of the term a culprit behind the lawsuits. Therefore, this research aims to evaluate the appropriateness of the warranty liability term of apartment buildings by identifying the current status of defects, in particular, caused by finishing works. That is because the number of defects, caused during the finishing works, accounted for the largest portion of the total defect cases of apartment buildings reported to the Apartment Defect Dispute Mediation Committee under the Ministry of Land, Infrastructure, and Transport of Korea between 2010 and 2011. The result from analyzing claims for defect repairs of the finishing works showed that most cases by work type continued to be made after two years, and only about 60% were charged within the warranty period. And, defects by work type have correlation, which needs to be considered for a better construction technique. Considering a low correlation between the possibility of defects and the construction performance rankings, which are highly relevant to the apartment preference. It is believed that there needs to be a qualification process for agencies that actually performs finishing works.

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

The Harmony and Moderation of Between Defect Liability and Default Liability in the Construction Contract (도급계약에서 하자담보책임과 채무불이행책임의 조화와 중용 - 대법원 2020.6.11. 선고 2020다201156판결에 대한 고찰 -)

  • Ahn, Sanghyo;Sin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.65-75
    • /
    • 2022
  • On 11 June 2021, the Supreme Court ruled that the judgment of the lower court was justified for the subject case, that the plaintiff could assert the defendant's liability for default due to incomplete performance even though the warranty period for defects which stipulated in the particular condition of the contract has expired. In Korean civil law, the concurrent between the exclusion period for defect warranty and the extinctive prescription for default liability is conceded, since the exclusion period and the extinctive prescription have their respective purposes in law, therefore these two should be judged by harmonizing them based on that they are mutually related. If the subject judgment is generalized, there is no reason to exist for the provisions of defect liability in the construction contract any longer. This study examines the subject judgments through the general theory and precedent case studies on the defect liability and default liability, then derived any problems that may arise if the subject judgment is generalized. In addition, based on a realistic model, it was suggested for a practical improvement method that both the provisions of the warranty period shall be changed realistic and to stipulate the character of its nature as written provisions in the contract.