• Title/Summary/Keyword: data management plans

Search Result 797, Processing Time 0.028 seconds

Development of a Construction Performance Causal Map Using System Dynamics (시스템 다이내믹스를 이용한 건설성과 인과지도 개발)

  • Kang, Jin-Young;Park, Hee-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

Approximation Method of Environmental Flows based on Flow Duration Curves (유황곡선을 기반으로 한 환경유량의 개략산정법)

  • Kim, Joo-Cheol;Lee, Sang-Jin;Ko, Ick-Hwan;Woo, Dong-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.933-937
    • /
    • 2010
  • This study aimed at the introduction of desktop method for assessment of environmental flows developed by IWMI(International Water Management Institute) recently and its application to Geum river basin. This scheme simulated the influence on aquatic ecosystem caused by watershed development and in turn the decrease of water quantity keeping the river's own flow regime. It was found to be as very effective method although it had simple structure. Flow duration curves for different environmental classes at Sutong and Gongjoo sites were estimated according to the natural conditional scenario of Geum river basin and the results were relatively compared well with the previous studies. The behaviors of monthly average runoff time series of both sites showed the level of A class. The results of this study would provide the fundamental data to establish the future plans of monitoring or management for aquatic ecosystem of Geum river basin.

  • PDF

Development of a Supporting Program for the Emergency Preparedness Plan (사고대비물질 취급자의 비상대응계획 작성 프로그램 연구)

  • Kim, Sung-Bum;Noh, Hye-Ran;Seok, Gwang-Seol;Park, Jae-Deuk
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.5
    • /
    • pp.54-58
    • /
    • 2011
  • Emergency preparedness plan(EPP) is the systematic management of activities that involve a material degree of risk of loss or other damage to the surroundings(people, property and environment), and the boundary of accident recovery plan(ARP). The main purpose of the program is to provide a safety management system to each facility in order to enable to prevent accident and to control accident immediately. The EPP includes not only typical safety-related documentations such as material safety data sheet(MSDS), standard operation procedure(SOP), emergency response plan(ERP). EPP is established basis of the preliminary safety analysis involving risk identification, assessment and prevention plans. The program is also helpful for government or related agencies to control a number of accidents in small-scale companies in the whole country.

Geoscientific land management planning in salt-affected areas* (염기화된 지역에서의 지구과학적 토지 관리 계획)

  • Abbott, Simon;Chadwick, David;Street, Greg
    • Geophysics and Geophysical Exploration
    • /
    • v.10 no.1
    • /
    • pp.98-109
    • /
    • 2007
  • Over the last twenty years, farmers in Western Australia have begun to change land management practices to minimise the effects of salinity to agricultural land. A farm plan is often used as a guide to implement changes. Most plans are based on minimal data and an understanding of only surface water flow. Thus farm plans do not effectively address the processes that lead to land salinisation. A project at Broomehill in the south-west of Western Australia applied an approach using a large suite of geospatial data that measured surface and subsurface characteristics of the regolith. In addition, other data were acquired, such as information about the climate and the agricultural history. Fundamental to the approach was the collection of airborne geophysical data over the study area. This included radiometric data reflecting soils, magnetic data reflecting bedrock geology, and SALTMAP electromagnetic data reflecting regolith thickness and conductivity. When interpreted, these datasets added paddock-scale information of geology and hydrogeology to the other datasets, in order to make on-farm and in-paddock decisions relating directly to the mechanisms driving the salinising process. The location and design of surface-water management structures such as grade banks and seepage interceptor banks was significantly influenced by the information derived from the airborne geophysical data. To evaluate the effectiveness ofthis planning., one whole-farm plan has been monitored by the Department of Agriculture and the farmer since 1996. The implemented plan shows a positive cost-benefit ratio, and the farm is now in the top 5% of farms in its regional productivity benchmarking group. The main influence of the airborne geophysical data on the farm plan was on the location of earthworks and revegetation proposals. There had to be a hydrological or hydrogeological justification, based on the site-specific data, for any infrastructure proposal. This approach reduced the spatial density of proposed works compared to other farm plans not guided by site-specific hydrogeological information.

Production Flow Analysis Simulation Integration for Collaborative Process Planning (협업 공정계획을 위한 생산흐름 분석 시뮬레이션 통합)

  • Lee Ju-Yeon;Noh Sang-Do
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.987-992
    • /
    • 2005
  • Manufacturing companies should perform process planning and its evaluation concurrently with new product developments so that they can be highly competitive in the modern market. Process planners should make decisions in the manner of concurrent and collaborative engineering in order to reduce the manufacturing preparation time and cost when developing new products. Automated generation of analysis models from the integrated database, which contains process and material information, reduces time to prepare analyses and makes the models reliable. In this research, we developed a web-based system for concurrent and collaborative system for production flow analysis, using web, database, and simulation technology. An integrated database is designed to automatically generate analysis models from process and material plans without reworking the data. This system enables process planners to evaluate their decision fast and share their opinions with others easily. With this system, it is possible to save time and cost for assembly process and material planning, and reliability of process plans can be improved

  • PDF

Spatial Transfigurations by Floor Plan Type of Elderly Center in Apartment Complex (아파트 단지 내 경로당의 평면유형에 따른 공간변용)

  • Yang, Se-Hwa;Ryu, Hyun-Joo
    • Journal of Families and Better Life
    • /
    • v.31 no.1
    • /
    • pp.29-37
    • /
    • 2013
  • The purposes of the study were to try configuring categorization of floor plans of elderly centers located in apartment complexes and to find out the spatial transfigurations regarding floor plan types. The data for the analysis of the study were collected from 56 elderly centers of apartment complexes in Ulsan by observations and interviews from July 3 through 13, 2012. The results are as follows. Firstly, the floor plans of the elderly centers were categorized into six types, which were 2R+L+K, 2R+LK, 1R+L+K/1R+LK, 1RL+K, 1RLK, and 2R+K/1R+K(no living room). Secondly, there were no salient differences among the plan types for the characteristics of physical environment of the centers. The types of 2R+L+K were relatively big in size and two thirds of the centers had gender-segregated rooms. Lastly, spatial transfigurations was found in sixty-percent of the centers, which included change of spatial arrangement, functional change, and functional addition. Interestingly, the more the spaces were segregated, the more the spatial transfigurations were performed in the way for the integration of functions of the rooms.

A study on the Applying Landscape Planning Elements Through Urban Regeneration Cases in Local Cities (지방도시 도시재생 사례를 통해 본 경관계획 요소의 적용에 관한 연구)

  • Kim, Seongho;Shin, Byeonguk;Lee, Woonggu
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.22 no.4
    • /
    • pp.51-62
    • /
    • 2020
  • Article 6 of the Landscape Act stipulates that "the Minister of Land, Infrastructure and Transport establishes a basic landscape policy plan every five years in order to create a beautiful and pleasant landscape, discover and support excellent landscapes." This is a comprehensive plan for landscape policy, a national plan that presents basic directions and strategies for the formation and continuous management of excellent national landscape. The basic landscape policy plan is a plan established every five years. It is an action plan that establishes a medium-term strategy for landscape policy and proposes specific implementation plans. Landscape-related policies are established in various fields, such as the central and local governments, and the private sector, and are based on mutual cooperation. Local cities voluntarily establish basic landscape plans, but in terms of integration, there are few cases in connection with urban regeneration. However, when the existing city establishes the basic landscape plan, the effect will be doubled if a new city is comprehensively constructed in relation to urban regeneration from the overall aspect of the city. Therefore, this study aims to provide data so that a master landscape plan can be established by analyzing and synthesizing the problems of the existing city centering on Jeonju, a representative local city.

A Delphi Study on Plans to Revitalize Occupational Health Nursing at Industrial Worksites (직업건강간호 활성화 방안에 관한 델파이 연구)

  • Lee, Young Joo;Noh, Gyeongmin
    • Korean Journal of Occupational Health Nursing
    • /
    • v.30 no.3
    • /
    • pp.90-100
    • /
    • 2021
  • Purpose: The study aimed to identify plans to revitalize occupational health nursing at industrial worksites. Methods: First, a literature review was conducted to derive the questions. Next, we used the Delphi method with two rounds to obtain experts' opinions. The 15 expert participants were seven occupational health nurses and eight professors from nursing colleges. Results: The analysis of opinions indicated that occupational health nurses should be competent in clinical nursing care to perform health management and health promotion activities of workers. It is necessary to develop high-quality occupational nursing services that can prevent and manage occupational diseases and work-related illnesses. Moreover, an improved system for stable employment of these nurses should be implemented. Conclusion: This study confirmed that occupational health nursing is an independent and important area for improving workers' disease prevention and health promotion. It will provide basic data for initiating occupational health nursing and expanding the role of the occupational health nurses.

Marketing Plans for Modern Art Gallery: The Current Literature Analysis

  • Soon-Mi KIM;Kyoung-Cheul JUNG
    • The Journal of Industrial Distribution & Business
    • /
    • v.15 no.8
    • /
    • pp.29-35
    • /
    • 2024
  • Purpose: This study delves into research on the core marketing plans for Modern Art Gallery. It begins with a review of existing literature to purposely get other researchers' contributions and views on the topic. Importantly and pertinent to this research, the review would enable the researcher to identify the existing gaps and how to address them to achieve the research objectives. Data and methodology: The researcher systematically reviewed the sources that met the inclusion criteria. The objective was to get the correct insights about other scholars' contributions and perspectives. The comprehensive outline of all the methods and methodologies is to promote the replicability of this study by other scholars or researchers. Results: The following four solutions are the critical findings vis-a-vis the marketing plan of Modern Art Gallery, its application, and its benefits to it. (1) Marketing Penetration Approach, (2) Product Innovation/ Development Approach, (3)Market Betterment and Development Strategy, and (4) Diversifying Approach. Conclusions: The findings give a direction in the future of the practitioners and stakeholders in the field. It is sufficient to state that this research's findings are helpful and valuable to Modern Art Gallery and other pertinent stakeholders such as learners, cultural departments, and researchers.

A Study on Securing Safety at Small and Medium-sized Construction Sites using The Safety and Health Register at Each Construction Stage (건설 단계별 안전보건대장을 활용한 중·소규모건설현장의 안전성 확보 방안)

  • Lee, Goon-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.187-192
    • /
    • 2020
  • In the past 20 years, accidents in the construction industry have declined in absolute numbers. On the other hand, disasters occurring at small and medium-sized construction sites account for more than 80% of the entire construction industry and are showing a continuous increase. A system for preparing a safety and health register in stages was enacted to preemptively prevent accidents by mandating responsibility for safety to owners with relatively strong authority in the construction industry. Considerable is needed to become an effective legal system. Although there have been many studies related to safety management plans and hazard prevention plans, there are no studies on the safety and health register. Therefore, in this study, an improved safety management procedure connected with the orderer's safety and health management procedure was presented as a plan for reducing accidents at small and medium-sized construction sites. All information was made as a data-based procedure to reduce the burden on the manager. The results of this study are expected to be used as basic data for the development of a safety management support information system for small and medium-sized construction sites.