• Title/Summary/Keyword: dam leakage

Search Result 62, Processing Time 0.028 seconds

A Study on the Estimation of Stability of Fill Dam by Long-term Electrical Resistivity Monitoring (장주기 전기비저항 모니터링 기법을 이용한 필댐의 안정성 평가)

  • Kim, Gi-Ho;Lim, Heui-Dae;Ahn, Hee-Yoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.5
    • /
    • pp.53-64
    • /
    • 2013
  • Resistivity monitoring is based on the fact that a change in the porosity leads to the changes in water content and fine particles, which alter the electrical resistivity. At every embankment dam, internal erosion always occurs as time passes. The internal erosion generally develops into piping over a long time by backward erosion and concentrated leak, and finally leads to dam failure. Resistivity is known to be very sensitive to the changes in porosity in embankment dams. Thus resistivity monitoring is a reasonable method to find out the leakage zone. However, resistivity is strongly influenced by seasonal variation of temperature, TDS of reservoir water and water level. In this paper. we first installed electrodes permanently at the center of the crest. The electrical resistivity monitoring data was acquired every 6 hours from Apr. 3, 2011 to July. 31, 2012. To analyze the characteristics of monitoring data, each resistivity data was calculated from up to 2,950 data sets. The result indicated a seasonal resistivity variation due to related temperature. Finally, a quantitative method to estimate porosities of the embankment dam from the resistivity monitoring data was analyzed. The applicability and reliability were verified and the importance of electrical resistivity monitoring for obtaining reliable result was emphasized.

Time-lapse Inversion of 2D Resistivity Monitoring Data (2차원 전기비저항 모니터링 자료의 시간경과 역산)

  • Kim, Ki-Ju;Cho, In-Ky;Jeoung, Jae-Hyeung
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.4
    • /
    • pp.326-334
    • /
    • 2008
  • The resistivity method has been used to image the electrical properties of the subsurface. Especially, this method has become suitable for monitoring since data could be rapidly and automatically acquired. In this study, we developed a time-lapse inversion algorithm for the interpretation of resistivity monitoring data. The developed inversion algorithm imposes a big penalty on the model parameter with small change, while a minimal penalty on the model parameter with large change compared to the reference model. Through the numerical experiments, we can ensure that the time-lapse inversion result shows more accurate and focused image where model parameters have changed. Also, applying the timelapse inversion method to the leakage detection of an embankment dam, we can confirm that there are three major leakage zones, but they have not changed over time.

A Study on the Face Slab Deformation of Concrete Faced Rockfill Dams During Initial Impoundment (초기 담수 중 콘크리트 표면차수벽형 석괴댐의 슬래브 거동에 관한 연구)

  • Won, Myoung Soo;Kim, Hyeong Joo;Jung, Young Chae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.129-139
    • /
    • 2015
  • Concrete-Face Rock-Fill Dams (CFRDs) are rock-fill dams with watertight-concrete slabs on its upstream slope instead of its central earth cores. The design for CFRDs are still largely empirical and typically based on past experiences. This paper presents a description of the concrete face slabs and leakage behaviors of two post-constructed CFRDs based on the data gathered through instrumentation during the initial impoundment. The results show that the strain on the concrete face slab and the horizontal displacements of the vertical slab joints are slightly affected by both the seasonal temperature change and water loading during the initial impoundment. The deformation of perimetric joints are less affected by the temperature change, however it is significantly affected by the water loading during the initial impoundment. The leakage rate is significantly affected by the hydrostatic load and the deformation of the perimetric joints.

Numerical Simulation for Evaluation the Feasibility of Using Sand and Gravel Contaminated by Heavy Metals for Dam Embankment Materials (중금속으로 오염된 사력재의 댐축조 재료 활용 가능성 평가를 위한 수치 모델링)

  • Suk, Hee-Jun;Seo, Min-Woo;Kim, Hyoung-Soo;Lee, Jeong-Min
    • Economic and Environmental Geology
    • /
    • v.40 no.2 s.183
    • /
    • pp.209-221
    • /
    • 2007
  • Numerical analysis was performed to investigate the effect of heavy metal contamination on neighboring environment in case a dam is constructed by using rockfill materials contaminated by heavy metals. The numerical simulation carried out in this research includes both subsurface flow and contaminant transport in the inside of the CFRD(Concrete Faced Rockfill Dam), using two commercial programs, SEEP2D and FEMWATER. The three representative cases of scenarios were chosen to consider a variety of cases occurring in a dam site; (1) Scenario 1 : no crack in the concrete face slab, (2) Scenario 2 : a crack In the upper part of face slab, and (3) Scenario 3 : a crack between plinth and face slab in the lower part of face slab. As a result of seepage analysis, the amount of seepage in scenario 2 was calculated as $14.31\sim14.924m^3/day$ per unit width, corresponding to the 1,000 times higher value than that in other scenarios. Also, in the simulation of contaminant transport by using FEMWATER, specified contaminant concentration of 13 ppb in main rockfill zone was set to consider continuous leakage from the rock materials. Through the analysis of contaminant transport, we found that elapsed times to take for the contaminant concentration of about 2 ppb to arrive at the end of a dam are as follows. Scenario 1 has the elapsed time of 55,000 years. In Scenario 2. it is 50 years. Finally, scenario 3 has 27,000 years. The rapid transport of the contaminant in scenario 2 was attributed to greater seepage flow by 500 times than other scenarios. Although, in case of upper crack in the face slab, it was identified that the contaminant might transport to the end of a dam within 100 years with about 2 ppb concentration, however, it happened that the contaminant was hardly transported out of the dam in other scenarios, which correspond to either no crack or a crack between plinth and face slab. In conclusion, the numerical analysis showed that the alternative usage of the contaminated sand and gravel as the dam embankment material can be one of the feasible methods with the assumption that the cracks in a face slab could be controlled adequately.

Electrical Instabilities of Mesoporous Silica Thin Films

  • Dung, Mai Xuan;Jeong, Hyun-Dam
    • Journal of Integrative Natural Science
    • /
    • v.3 no.4
    • /
    • pp.219-225
    • /
    • 2010
  • On the surface of mesoporous silica thin films (MSTF) which were fabricated by sol-gel approach there are existences of water and three different silanol types including chained, germinal and isolated silanol. Their amounts changes as a function of aging time of used sol solution, as confirmed by FT-IR. The adsorbed water generates ionic carriers such as H+ and OH- and passivates the Si dangling bonds at the interface of silicon wafer-MSTF. The ionic carriers can not only transport across the thickness of thin film to enhance the leakage current but also diffuse toward the silicon wafer-MSTF interface to depassivate Si dangling bonds. On the other hand, chained silanols or germinal silanols promote the moisture adsorption of MSTF and tend to form strongly hydrogen bonded systems with adsorbed water molecules resulting in very high dielectric constant. Isolated silanol, on the contrary, affects less on electrical properties of thin film.

Thermal Stress Analysis on the Heat of Hydration Considering Creep and Shrinkage Effects of Mass Concrete (크리이프와 건조수축영향을 고려한 매스콘크리트에서 수화열에 대한 온도응력해석)

  • 김진근;김국한
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1992.04a
    • /
    • pp.107-113
    • /
    • 1992
  • The heat of hydration of cement the causes the internal temperature rise at early age, particulary in massive concrete structures such as a mat-slab of nuclear reactor building or a dam or a large footing. As the result of the temperature rise and restraint of foundation, the thermal stress enough to induce concrete cracks can occur. Therefore, the prediction of the thermal stress is very important in the design and construction stages in order to control the cracks developed in massive concrete structures. And, more creep and shrinkage take place at elevated temperatures in young concrete, Thus the effect of creep and shrinkage must be considered for checking the safety and servicebility(crack, durability and leakage).

  • PDF

Implementation of on Expert System to Supervise GIS Arrester Facilities (GIS 피뢰설비 관리를 위한 전문가 시스템 구현)

  • Kil, Gyung-Suk;Song, Jae-Yong;Kim, Il-Kwon;Moon, Seung-Bo;Kwon, Jang-Woo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.1
    • /
    • pp.75-81
    • /
    • 2007
  • This paper dealt with the design and implementation of an expert system to monitor and diagnose the lightning arresters in GIS substations. The expert system consists of a data acquisition module(DAM) based on microprocessor and diagnostic algorithms. The DAM measures and analyzes several parameters necessary for the arrester diagnosis such as system voltages, leakage current components, and temperatures. Also, it includes an intelligent surge counter which can record the date and tin, the polarity, and the amplitude of surge currents. All the data acquired is transmitted to a remote computer by a low rate wireless network specified in IEEE 802.15.4 to avoid electromagnetic intereference under high voltage and large current environments. The decision-making for the arrester diagnosis completes with a Java Expert System Shell(JESS) which is composed of a knowledge base, an inference engine and a graphic user interface(GUI).

Risk Analysis Method for Deriving Priorities for Detailed Inspection of Small and Medium-sized Fill Dam (중소형 필댐의 정밀점검 우선순위 도출을 위한 간이 위험도 분석 방법)

  • Kim, Jinyoung;Kang, Jaemo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.10
    • /
    • pp.11-16
    • /
    • 2020
  • Korea's agricultural reservoir is one of the country's major infrastructures and plays an important role in people's lives. However, aging reservoirs are a risk for life and property. Currently, large and small dams and reservoirs have been constructed nationwide for more than 40 years of aging. Dams and reservoirs built nationwide are managed by various institutions. Therefore, it is difficult to manage all dams and reservoirs due to cost and time. Managers in the field with less management personnel and lack of expertise should be able to quickly identify risk factors for multiple reservoirs. In this study, risk factors such as seepage, leakage, settlement slide, crack and erosion were selected. To assess the risk of the items, we used the analytical hierarchical process (AHP), one of the Multi-Criteria Decision Making (MCDM) methods. The analysis showed that seepage has the greatest impact on reservoir collapse. It is judged that the priority of detailed diagnosis can be determined by evaluating the risk of dam reservoir collapse in a convenient way in advance using the calculated weight.

Thermal Stress Analysis on ike Heat of Hydration for Mass Concrete Considering Creep Effect (크리이프를 고려한 매스콘크리트의 수화열에 대한 온도응력 해석)

  • 김진근;이종대;김국한
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1992.10a
    • /
    • pp.67-72
    • /
    • 1992
  • The heat of hydration of cement causes the internal temperature rise at early age, particulary in massive concrete structures such as a footing of nuclear reactor building or a dam. As the result of the temperature rise and restraint of foundation, the thermal stress may induce cracks in concrete. Therefore, the prediction of the thermal stress is very important in the design and construction stages in order to control the cracks developed in massive concrete structures. And, in case of young concrete, creep effect by the temperature load is larger than That of old concrete. Thus the effect of creep must be considered for checking the cracks, serviceability, durability and leakage. This study is composed of two items. The first, it is to develop a finite element program which is capable of simulating the temperature history in mass concrete. The second, when the thermal stress of mass concrete structures considering creep is calculated by using the modified elastic modulus due to the inner temperature change. It is shown that the analytical results of this study is in comparably good agreement with JCI's analytical results.

  • PDF

A Case Study on Chlorine Dioxide Usage at a Conventional Water Treatment Plant (기존 정수장 이산화염소 시범도입 사례연구)

  • Lee, Song-Hee;Lee, Byung-Doo;Kim, Jin-Keun;Seog, Kwon-Soo;Lee, Joung-Taek
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.1
    • /
    • pp.115-119
    • /
    • 2005
  • As the regulations on DBPs are tightened, many water treatment plants (WTPs) in Korea have already introduced or will introduce enhanced coagulation, alternative disinfectants and advanced treatments such as ozonization and granular activated carbon to improve drinking water qualify. After a phenol leakage accident at the Nakdong-River in 1991, 26 WIPs in Korea introduced carbon dioxide generators, but there has been no accumulation of significant operating data. This research summarizes things that should be considered for the introduction of carbon dioxide disinfection process to WTPs based on one year operation data from A WTP that has had high concentration of DBP during a specific period in the summer. The removal efficiency of DBP was $30{\sim}40%$, but those of 2-MIB, Geosmin were less than 10%. The generation rate of $ClO_2$ by-products such as chlorite and chlorate were $70{\sim}100%$ of input dosage, but the ratios increased over time. At the same time, strong chlorine odors may be produced in the distribution system when $ClO_2$ was used with $Cl_2$ as a result of reaction between the chlorite and residual chlorine.