• 제목/요약/키워드: daily construction volume

검색결과 22건 처리시간 0.023초

도로포장 유지보수 공사비산정기준 개정에 대한 연구 (A Study on Revising Construction Cost Calculation for Road Paving Maintenance Work)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.155-156
    • /
    • 2020
  • Unlike new construction projects, road paving maintenance work shows large productivity discrepancies depending on the conditions of the worksite. The current construction cost calculation scheme, however, only provides daily construction volume categorized by work scope and scale: There are no detailed standards that can be implemented on various types of worksites. To develop standards that enable the calculation of appropriate construction costs by taking into account worksite conditions, the current study conducted on-site surveys and interviews. The on-site research and analysis revealed that location, construction width, the day's worksite lot, work scope, and construction objectives were found to cause differences in construction volume. In addition to the existing work scope and work scape variables, the current study added weight constants reflecting the daily work volume based on movement conditions at site and the size of the worksite lot. In this process, the current study found that even one type of construction project can have fifteen different levels of daily construction volume. Such detailed classification was deemed to enable the proper calculation of construction costs based on worksite conditions.

  • PDF

PS Ball 풍쇄슬래그의 일일복토재 및 집배수재 재활용을 위한 연구 (A Study on the alternative daily cover and envelop materials of PS Ball slag)

  • 김상근;정하익;송봉준;장원석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1408-1411
    • /
    • 2005
  • The purposes of daily cover are to control odor and volatile organic compound emissions, to control litters, to mitigate rainfall infiltration. Under usual operation of landfill, the soil layer of 15cm thick is used for daily cover, but about $20{\sim}$25% of landfill capacity is consumed by daily cover volume. Considering our limited land and difficulty in getting landfill site, developing an alternative daily cover material which usually occupies much less volume than soil will be very significant. Also, if we can use waste material for alternative daily cover, we can get additional benefit of recycling waste.

  • PDF

A Study on the Correlation Analysis between the Daily Earthwork Volume and Fine Dust Concentration

  • Dong-Myeong, CHO;Ju-Yeon, LEE;Tae-Hwan, JEONG;Woo-Taeg, KWON
    • 웰빙융합연구
    • /
    • 제6권1호
    • /
    • pp.1-7
    • /
    • 2023
  • Purpose: Fine dust is classified as a group 1 carcinogen and poses a significant environmental problem that urgently requires improvement to protect the environmental rights of citizens. Given the difficulty of implementing measures to reduce overseas sources of fine dust, it is essential to first devise specific measures to address domestic emission sources. As such, this study aims to analyze the correlation between earthwork volume control and fine dust concentration as preliminary management measures to reduce the impact of scattering dust at construction sites. Based on real-time air quality information, field management measures will be presented to mitigate the effects of dust emissions. Research design, data and methodology: As examples, we selected construction sites that had recently undergone small-scale environmental impact assessment consultations. The standard earthwork volume was classified into grades using 20% intervals, and we applied AERMOD to predict the weighted concentration of fine dust based on the earthwork volume class and analyzed its correlation. Results: The results of this study demonstrate a strong correlation between earthwork volume and fine dust concentration. By utilizing the correlation analysis between earthwork volume and fine dust concentration on-site, this finding can be utilized as an effective fine dust management plan. Conclusions: This involves determining the daily earthwork intensity based on real-time air quality information and implementing measures to reduce scattering dust.

교통수요변동을 내생화한 도시고속도로의 장래교통량예측에 관한 연구

  • 신제철;오윤표
    • 대한교통학회지
    • /
    • 제7권2호
    • /
    • pp.29-43
    • /
    • 1989
  • The purpose of this study is to construct a forecasting model involved in a diverted traffic volume of the 2nd intra-urban expressway in construction presently, in the case of the future prediction of traffic demand for the intra-urban expressway in Pusan. In this study, the model involved in a diverted traffic volume is constructed trustworthy. And the future traffic demand of intra-urban expressway by this model was forecasted 114,005 volume/daily in 1996 and 147,090 volume/daily in 2001. However, it will made a study more and more concretely for practicality and limitation as well as construction of the forecasting model considered an intrinsic problem of an observational error and necessity of survey for much more socio-economic data, the traffic volume on all orad and OD pairs in Pusan.

  • PDF

시간자료의 공간화를 통한 일교통량 결측대체 방법론 연구 (Missing Imputation Methodologies for Daily Traffic Counts by Transforming Time Data into Spatial Data)

  • 허태영;오주삼
    • 한국도로학회논문집
    • /
    • 제9권3호
    • /
    • pp.21-28
    • /
    • 2007
  • 본 연구에서는 결측된 일교통량의 대체를 위하여 교통공학에서 많이 활용되고 있는 기존의 선형내삽법에 공간상관성 기법을 고려한 새로운 선형내삽법을 제안하였다. 일교통량과 같이 시간적 특성을 지닌 자료를 공간위에 배치하여 공간적 상관성을 고려할 수 있도록 하였다. 공간상관성을 측정하기 위하여 일교통량의 순환성을 감안하여 같은 주의 요일간 상관성과 주별 같은 요일의 상관성을 나타내는 지표로서 Moran Index를 사용하였다. 실제 분석을 위하여 한국건설기술연구원에서 제공한 2004년 11월의 28일간의 일교통량 자료를 $4{\times}7$ 격자 형태로 배치하여 일별 교통량자료를 공간화 시켜 공간 상관성을 살펴보았으며, 여러 가지 통계적 지표를 통하여 공간 선형내삽법의 우수성을 확인하였다.

  • PDF

보도용 블록포장 유지보수 공사 원가산정기준 개정 연구 (A Study on the Revision of the Cost accountingfor Sidewalk Block Pavement Maintenance and Repair Work)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.271-272
    • /
    • 2021
  • The maintenance and repair work of sidewalk block pavement is a construction that requires a large amount of budget to be invested every year. It is important to establish an appropriate standards for estimating construction cost to ensure proper budgeting and quality. In this study, the standards for estimating the cost of maintenance and construction work for sidewalk blocks that can be applied to the construction volume classified according to the site conditions, construction type, and equipment use differentiated from new construction was established. As a result, the daily construction volume was presented by reflecting excavator and truck as equipment in the combination of paver and common worker. The re-installation was applied by separating the construction volume of sections with general blocks and induction/raised blocks based on the installation of sidewalk blocks after demolition. Generally if block cutting is necessary, the precision construction conditions using a cutting machine were taken into consideration to secure the construction quality. In addition, it has been revised to apply classified construction volume into A and B-Type depending on the park and site conditions.

  • PDF

소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구 (A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

Design criteria of wind barriers for traffic -Part 2: decision making process

  • Kim, Dong Hyawn;Kwon, Soon-Duck;Lee, Il Keun;Jo, Byung Wan
    • Wind and Structures
    • /
    • 제14권1호
    • /
    • pp.71-80
    • /
    • 2011
  • This study presents a decision making process for installation of wind barrier which is used to reduce the wind speed applied to running vehicles on expressway. To determine whether it is needed to install wind barrier or not, cost and benefit from wind barrier are calculated during lifetime. In obtaining car accidental risk, probabilistic distribution of wind speed, daily traffic volume, mixture ratio in the volume, and duration time for wind speed range are considered. It is recommended to install wind barrier if benefit from the barrier installation exceed construction cost. In the numerical examples, case studies were shown for risk and benefit calculation and main risky regions on Korean highway were all evaluated to identify the number of installation sites.

Le Corbusier 건축의 구조와 외피에 나타나는 모듈러 시스템에 관한 연구 (A Study on The Modulor System Shown in Structure and Envelope of Le Corbusier's Works)

  • 조성현
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권1호
    • /
    • pp.15-22
    • /
    • 2010
  • As for structural system, which constitutes his construction, there are column inside dimension and span which constitutes plane, and as for constructions for section, there are C.H and slab, and as for constructive factors for envelope, there are window and closing panel of outer wall, and as for opening, there are punching window and wave window. With these constructive parts and opening of envelope, his construction composes volume and mass. The relation of structure and modulor which are shown in his later construction can be divided in two cases that modulor is directly and indirectly adapted for rate and measure calculation of the constructive body. As for indirectly adapted case, we can find it form most of his later construction, it is living place in which human beings life is, and it is adapted mainly for small space. In his construction, he tried to tell human scale and sense of musical rhythm through modulor. In other words, he played sense of space and musical scale by adapting regular and repetitive modulor of opening, and in small space for daily life, he made the size of space into the space which human can perceive. And, if we interpret mudulor in modern meaning, it is an establishment of radius of human act. And, we can make organic and harmonic design of space if we use modulor as origin of human centered measurement calculation, and if we adapt space after dividing by use.

소규모수도시설의 공급량-수요량 모니터링 체계 구축 및 가뭄 대응 방안 연구 (A Study on the Establishment of Water Supply and Demand Monitoring System and Drought Response Plan of Small-scale Water Facilities)

  • 최정렬;정일문;조현재
    • 지질공학
    • /
    • 제29권4호
    • /
    • pp.469-481
    • /
    • 2019
  • 가뭄으로 인한 제한급수나 단수로 인해 발생할 수 있는 물 복지 소외지역의 불편과 경제적 피해를 예방하기 위해서는 Sand Dam 건설과 같은 구조적 안정화 방안과 더불어 합리적 수요/공급량 관리 등을 통한 비구조적 관리 대책이 필요하다. 본 연구에서는 소규모수도시설이 생활용수의 주 공급원인 춘천시 서상리 유역의 가뭄대응을 위해 공급량-수요량 모니터링 체계를 구축하였다. 공급량 모니터링을 위해 상류부 하천의 유량을 측정하였으며, 이를 SWAT (Soil and Water Assessment Tool)의 매개변수 보정에 사용하여 일별 유출량을 산정하였다. 수요량 모니터링을 위하여 하천-저수조-가정으로 이어지는 용수 공급 네트워크를 작성하였으며, 저수조의 수위 변화를 측정하여 일별 사용량을 산정하였다. 최종적으로 산정된 일별 공급량과 수요량 간의 관계분석을 통해 용수 부족 여부를 파악할 수 있었으며, 가뭄 대응을 위한 효과적인 지표로 사용될 수 있을 것으로 판단된다.