• Title/Summary/Keyword: crevice gap size

Search Result 4, Processing Time 0.018 seconds

An Electrochemical Evaluation on the Crevice Corrosion of 430 Stainless Steel with Variation of Crevice Wide by Micro Capillary Tubing Method (Micro Capillary Tube 방법을 이용한 430 스테인레스강 틈의 폭변화에 따른 틈부식의 전기화학적 평가)

  • Na, Eun-Young
    • Journal of the Korean Electrochemical Society
    • /
    • v.6 no.4
    • /
    • pp.250-254
    • /
    • 2003
  • In this study, the IR drop theory was adopted to explain the initiation of crevice corrosion in the framework of IR drop in crevice electrolyte. Furthermore, the electrochemical polarization was measured to study the mechanism of crevice corrosion for type STS430 stainless steel. lest method adopts under condition that the size of specimen is $10\times20\times5mm,\;in\;1N\;H_2SO_4+0.1N\;NaCl$ solution, and the artificial crevice gap sizes are three kinds, the Micro capillary tube size is inner diameter 0.04 mm, outer diameter 0.08 mm. Crevice corrosion is measured under the applied voltage of passivation potential -200mV/SCE, resulted from anodic potentio-dynamic polarization to the external surface along the crevice. The potential difference was measured by depth profile by Micro capillary tube which inserted in the crevice. The obtained results of this study showed that 1) As artificial crevice gap size became narrow, the current density was increased, whereas no crevice corrosion was found in the crevice gap size $3\times0.5\times16mm\;in\;1N\;H_2SO_4+0.1N\;NaCl\;solution\;at\;20^{\circ}C$ 2) potential of the crevice was about from -220 to -358mV which is lower than that of external surface potential of -200mV The results so far confirmes that the potential drop(so-called IR drop) in the crevice is one of the major mechanisms the process of crevice corrosion for 430 stainless steel.

Study on the Effects of Environmental Parameters on High Temperature Denting Behavior in Crevices (덴팅거동에 미치는 고온틈새 환경변수들의 영향연구)

  • Kim, Myong-Jin;Kim, Joung Soo;Kim, Dong Jin;Kim, Hong Pyo
    • Corrosion Science and Technology
    • /
    • v.10 no.5
    • /
    • pp.180-188
    • /
    • 2011
  • In the present study, denting corrosion experiments were performed as a function of crevice gap size (50, 100 and 200 ${\mu}m$) in a solution containing 3,500 ppm NaCl + 0.2 M $CuCl_2$ (pH = 3 adjusted by HCl). The effects of chloride ion concentrations (3, 3,500 and 35,000 ppm as NaCl) were also outlined with two different crevice gap sizes (100, 200 ${\mu}m$). In addition, the effect of NiB on the denting corrosion was also investigated in a solution of 35,000 ppm NaCl + 0.2 M $CuCl_2$ (pH = 3 adjusted by HCl). The results showed that denting rate increased with the increasing crevice gap size at an initial stage and became nearly constant afterwards. As the concentration of chloride ion increased, the denting rate also increased. However, the addition of a NiB powder of 4 g/L in to the acid-chloride solution was observed to suppress the denting rate significantly.

A Study on the Mechanism of Crevice Corrosion for 430 Stainless Steel (430 스테인리스강의 틈부식 발생기구에 대한 연구)

  • 백신영;나은영
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.27 no.3
    • /
    • pp.447-452
    • /
    • 2003
  • Crevice corrosion is localized form of corrosion usually associated with a stagnant solution on the micro-environmental level. Such stagnant micro environments tend to occur in crevices (shielded areas) such as those formed under gaskets washers insulation material. fastener heads. surface deposits. disbonded coatings. threads. lap joints and clamps. Crevice corrosion is initiated by changes in located electrochemical reaction within the crevice such as a) depletion of inhibitor in the crevice b) depletion of oxygen in the crevice c) a shift to acid conditions in the crevice and d) build-up of aggressive ion species (e.g chloride) in the crevice. In this study. the mechanism of crevice corrosion for Type 430 stainless steel is investigated undercondition that the size of specimen is $15{\times}20\{times}3mm$, in 1N $H_2SO_4$ + 0.05N NaCl solution. and the artificial crevice gap size of 3 x 0.2 x 15 mm. Crevice corrosion is measured under applied potential -300mV(SCE) to the external surface. The obtained result of this study showed that 1) the induced time for initiation of crevice is 750 seconds. 2) potential of the crevice was about from -320mV to -399mV. which is lower than that of external surface potential of -300mV It is considered that potential drop in the crevice is one of mechanisms for the crevice corrosion

A Study on the Crevice Corrosion for Ferritic Stainless Steel (페라이트 스테인리스강의 틈부식에 대한 연구)

  • Baik Shin-Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.10 no.1 s.20
    • /
    • pp.51-54
    • /
    • 2004
  • In recently days, the breed fish farm is increased in the beach side for farming fish. In such a farm, the heater is requested for preventing freezing in cold season. The heating material are requested high corrosion resistance and strength for endurance high corrosive salt and pressure. In case of low corrosion resistance and/or strength, the heating element shall be broke down and eventually make spillage or leaking contaminated salt. In the most cases, crevice corrosion is localized form of corrosion usually associated with a stagnant solution on the micro-environmental level. In this study, the crevice corrosion of Ferritic type 430 stainless steel is investigated. The size of specimen is $15{\times}20{\times}3mmt$. Test solution is 1N H2SO4 + 0.05N NaCl. The artificial crevice gap size is $0.24{\times}3{\times}15mmL$. Crevice corrosion is measured under applied voltage 300mV(SCE) to the external surface. the result of this study showed that 1) the induced time for initiation of crevice is 750seconds, 2) potential is dropped in the crevice from the top of gap opening from -320 to -399mV. The result confirmed that the potential drop(IR mechanism) in the crevice is one of mechanism for crevice corrosion.

  • PDF