• Title/Summary/Keyword: crane equipment

Search Result 169, Processing Time 0.026 seconds

Dual Cycle Plan for Efficient Ship Loading and Unloading in Container Terminals (컨테이너 터미널의 효율적인 선적 작업을 위한 Dual Cycle 계획)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.33 no.8
    • /
    • pp.555-562
    • /
    • 2009
  • At container terminals, a major measurement of productivity can be work-efficiency in quay-side. At the apron, containers are loaded onto the ship and unloaded to apron by Q/C(Quay Crane). For improving the productivity of quay crane, the more efficient Y/T(Yard Tractor) operation method is necessary in container terminals. Between quay-side and yard area, current transferring methods is single-cycling which doesn't start loading unless it finishes unloading. Dual-cycling is a technique that can be used to improve the productivity of quay-side and utility of yard tractor by ship loading and unloading simultaneously. Using the dual-cycling at terminals only necessitates an operational change without purchasing extra equipment. Exactly, Y/T operation method has to be changed the dedicate system to pooling system. This paper presents an efficient ship loading and unloading plan in container terminals, which use the dual-cycling. We propose genetic and tabu search algorithm for this problem.

A Study on Calculation of Air Pollutants Emission Factors for Construction Equipment (건설기게의 대기오염물질 배출계수 산정을 위한 연구)

  • lim, Jae-Hyun;Jung, Sung-Woon;Lee, Tae-Woo;Kim, Jong-Choon;Seo, Chung-Youl;Ryu, Jung-Ho;Hwang, Jin-Woo;Kim, Sun-Moon;Eom, Dong-Sup
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.25 no.3
    • /
    • pp.188-195
    • /
    • 2009
  • Generally. mobile sources of air pollution were classified in on-road and non-road. Due to increased registration number of construction equipment in Korea. updated emission factors for non-road mobile sources, such as construction machinery. should be developed. NONROAD model of U.S. EPA already has introduced transient adjustment factors and sulfur adjustment factors for emission factors of diesel powered engine. In addition to this. European Environment Agency (EEA) has proposed emission factors for off-road machinery including several types of construction equipment. In this study. six types of construction equipment, such as excavator. forklift, loader, crane, roller and bulldozer, were studied to estimate emission factors based on total registration status in Korea. Total 445 construction equipments between 2004 and 2007 model year were tested with KC1-8 mode and air pollutants (CO, THC, $NO_x$, and PM) were measured. After statistical estimation and calculation, emission factors for CO, THC, $NO_x$, and PM for excavator, forklift, loader, crane, roller and bulldozer were provided and compared with previous emission factors. Moreover, updated emission factors for six types of construction equipment in this study were verified after comparison with emission factors of U.S. EPA. Finally, estimated emission amounts of four air pollutants were suggested according to six types of construction equipment.

A Study On the Safety Management of construction equipment Using Smart Phone Technology (Focused on poclain and mobile elevated work platform) ("스마트폰" 기반을 활용한 건설장비 안전관리에 관한 연구 (굴삭기, 고소작업대중심으로))

  • Jo, Jeong-Ho;Im, Jae-Chang;Go, Yeong-Uk;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.43-59
    • /
    • 2012
  • As contemporary building construction type is getting higher and deeper,construction equipment usage is getting more, and related fatal accidents are on an increasing trend. In these days, due to the deteriorating construction business circumstance, job finding problem of equipment operator, and dumping contract, equipment lease suppliers are putin jeopardy. In high-rise building construction, especially tower crane, mobile elevated work platform and other High place operation cars among construction equipment cause many critical accidents because of drop supply of construction biding bringing out dumping contract could cause unsafe and poor construction management. Because of this, a method was drawn which could grasp the present state of construction equipment management and manage safety of the equipment more easily for accident prevention by choosing 2 kinds of Construction equipment which cause safety accident frequently among the equipment mainly used in construction site. This study suggested a method about construction equipment safety management using "smart phone" base which could be used in safety management for construction equipment by whomever in construction site. After attachment of QR code included safety checklist, It became possible that site managers could check more efficiently by scanning with their smart phone when they inspect equipment. Moreover, by the construction interested who didn't know what and how they have to inspect could point out unsafe condition in the early stage of equipment entering or take unsafe one out of the site by using new smart phone safety checking system is installed, it became possible that critical accident caused by construction equipment was prevented in advance.

  • PDF

A Research of Loading Equipment Simulator Development (하역장비 시뮬레이터 개발에 관한 연구)

  • Son, J.K.;Kwon, S.J.;Bae, J.I.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2772-2774
    • /
    • 2000
  • According to the development of marine transportation business and the modernization and over sizing of vessel transportation equipment. shipping equipment used in the terminal are getting more atomized and speedier. thus the efficiency of shipping and discharging depends upon the degree of practice of terminal operating manpower. It means that cultivation of experts in this field is essentially needed and it is becoming a serious problem to guarantee the training programs to provide high-class. high-skilled manpower. The best result can be expected when we use the real equipment for training purposes. but it will cause many difficulties such as budget problem. To overcome this situation. we developed the Virtual Container Crane Simulator(VCCS System) which enables the operator to learn the operation of the equipment as well as safety problems within a short time. VCCS system begins with establishing the direction of operation by setting the appropriate motions for each step. and then it instructs the basic operation. It enhances the driver's ability to cope with accidents during operation and completes and completes the mastery of operating techniques with The repetition of practice.

  • PDF

Implementation of Efficient Container Number Recognition System at Automatic Transfer Crane in Container Terminal Yard (항만 야드 자동화크레인(ATC)에서 효율적인 컨테이너번호 인식시스템 개발)

  • Hong, Dong-Hee
    • Journal of the Korea Society of Computer and Information
    • /
    • v.15 no.9
    • /
    • pp.57-65
    • /
    • 2010
  • This paper describes the method of efficient container number recognition in colored container image with number plate at ATC(Automatic Transfer Crane) in container terminal yard. At the Sinseondae terminal gate in Busan, the container number recognition system is installed by "intelligent port-logistics system technology development", that is government research and development project. It is the method that it sets up the tunnel structure inside camera on the gate and it recognizes the container number in order to recognize the export container cargo automatically. However, as the automation equipment is introduced to the container terminal and the unmanned of a task is gradually accomplished, the container number recognition system for the confirmation of the object of work is required at ATC in container terminal yard. Therefore, the container number recognition system fitted for it is necessary for ATC in container terminal yard in which there are many intrusive of the character recognition through image including a sunlight, rain, snow, shadow, and etc. unlike the gate. In this paper, hardware components of the camera, illumination, and sensor lamp were altered and software elements of an algorithm were changed. that is, the difference of the brightness of the surrounding environment, and etc. were regulated for recognize a container number. Through this, a shadow problem, and etc. that it is thickly below hung with the sunlight or the cargo equipment were solved and the recognition time was shortened and the recognition rate was raised.

A study on efficient operation method of handling equipments in automated container terminals (자동화 컨테이너터미널에서 운송장비의 효율적인 운영방안)

  • 이상완;최형림;박남규;박병주;권해경;유동호
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2002.11a
    • /
    • pp.63-70
    • /
    • 2002
  • The main subject to become a hub pen is automation The automated container terminal has already operated in advanced pons and it bas been planned for the basic planning and operation design in domestic case. The key of automated container terminal is effective operation of both ATC(automated transfer crane) and AGV(automated guided vehicle) which is automated handling equipments. This is essential to productivity of automated container terminal. This study suggests the moat optimal method of equipment operation in order to minimize loading time using each three types of effective AT operation methods and AGV dispatching rules in automated container terminals. As the automated equipment operation causes unexpected deadlocks or interferences, it should be proceeded on event-based real tine. Therefore we propose the most effective ATC operation methods and AGV dispatching rules in this paper. The various states occurred in real automated container terminals are simulated to evaluate these methods. This experiment will show the most robust automated equipment operation method on various parameters(the degree of yard re-marshaling, the number of containers and the number of AGVs).

  • PDF

A Systematic Procedure for Selecting the Development Alternatives of Container Cranes (컨테이네크레인의 개발 대안 선정을 위한 체계적인 절차)

  • Won, Seung-Hwan;Choi, Sang-Hei
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.339-344
    • /
    • 2006
  • Container terminals compete with other ones because of the continuous increase of container flows and the appearance of large-sized vessels. Major port equipment manufacturers are interested in the development of new conceptual equipment ot greatly increase the productivity. In this study, a two-phase procedure is suggested for selecting the optimal development alternatives, when there are various development alternatives for container cranes, typical equipment in ports. The first phase removes the alternatives that violate essential requirements and the second phase selects find alternatives by using AHP (Analytic Hierarchy Process). Finally and example applying the procedure is provided.

  • PDF

Graphic Simulator of Master/Slave Manipulator in Virtual Hot Cell

  • Kim, Sung-Hyun;Song, Tae-Gil;Lee, Jong-Yul;Yoon, Ji-Sup
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.100.6-100
    • /
    • 2002
  • The crane and the master-slave manipulators (MSM) are widely used as a remote handling device in nuclear facilities such as the hot cell. The equipment to be installed in the hot cell should be optimally placed within the workspace of the wall-mounted slave manipulator for the maintenance operation. Also, the slave manipulator with the end effectors should be properly positioned and oriented for the dedicated maintenance operation. Hence, the workspace and the motion of the slave manipulator, as well as, the remote operation task should be analyzed before installing the manipulators and the hot cell equipment. For this purpose, the 3D graphic simulator, which simulates the remote operation o...

  • PDF

OPTIMAL DESIGN ALGORITHM OF THE FOUNDATION OF TOWER CRANES

  • Kim, Sun-Kuk;Kim, Jang-Young;Ryu, Sang-Yeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1047-1052
    • /
    • 2009
  • As buildings nowadays become taller in height and larger in size the safety review of lifting plan takes larger portion in construction project management. However, the cost and safety in lifting plan have a contradictory effect on each other. Therefore, an optimization algorithm needs devising as a solution of the contradictory problem. In many cases at construction sites, selections and stability review of tower cranes are assigned to equipment suppliers or field managers, which cause the problems in safety and cost of the projects. To improve the part of the current situation, a study on the optimization algorithm for designing the foundation of tower cranes is conducted in this study, which can be utilized by equipment suppliers or field managers to check the stability of tower cranes easily and promptly without substantial knowledge.

  • PDF

Physical Modeling for Enhancement of the Functionality of Construction Graphical Simulation System (건설 그래픽 시뮬레이션 시스템의 기능 개선을 위한 물리적 모델링)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.80-88
    • /
    • 2006
  • Construction graphical simulations usually do not reflect physical properties of construction equipment and material because there are restricted to the geometric model. The complete description of construction operations is difficult for graphical simulation without a physical modeling. The object of this research is to enhance the functionality of restricted simulation system to geometric model. And research is conducted to overcome the limitation of current construction graphical simulation system through the connection geometric model and physical model with the physical properties of construction equipment and material such as crane's cable oscillation. The motion equations for the oscillation of crane cable as a result of the trolley's movement and the boom's rotation were derived. The equations were solved through numerical analysis and the results were simulated visually. The realistic description with physical modeling of construction operations will contribute for ensuring preliminary against risks and improving constructability as well as the application of various fields.