• 제목/요약/키워드: cost-schedule data

검색결과 188건 처리시간 0.025초

Stochastic Time-Cost Tradeoff Using Genetic Algorithm

  • Lee, Hyung-Guk;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.114-116
    • /
    • 2015
  • This paper presents a Stochastic Time-Cost Tradeoff analysis system (STCT) that identifies optimal construction methods for activities, hence reducing the project completion time and cost simultaneously. It makes use of schedule information obtained from critical path method (CPM), applies alternative construction methods data obtained from estimators to respective activities, computes an optimal set of genetic algorithm (GA) parameters, executes simulation based GA experiments, and identifies near optimal solution(s). A test case verifies the usability of STCT.

  • PDF

FACE 적합성을 위한 항공전자 소프트웨어 데이터 모델링 방안 및 검증 (Avionics Software Data Modeling Method and Test For FACE Conformance)

  • 조경연;이두환;차상철;김정열
    • 항공우주시스템공학회지
    • /
    • 제16권6호
    • /
    • pp.45-53
    • /
    • 2022
  • 항공전자 시스템에서는 하드웨어 장비가 변경되면 통신 방식 및 ICD 변경이 빈번히 발생하며, 소프트웨어 또한 그에 맞게 수정이 필요하다. 이는 개발 일정 및 비용에 큰 영향을 주는 요소이다. 따라서 최근 항공전자 산업에서는 소프트웨어의 이식성을 높이기 위해 개방형 아키텍처를 도입하고 있으며, 관련 연구 또한 활발히 진행되고 있다. 본 논문에서는 개방형 항공전자 아키텍처 중 하나인 FACE를 준수하기 위한 데이터 모델링 방안 및 고려사항에 대하여 설명한다. 또한, 항전 장비 중 하나인 VOR/ILS에서 출력하는 데이터에 대해 FACE 데이터 모델을 설계 및 구현하고, FACE Conformance Test Suite(CTS) 프로그램을 이용하여 데이터 모델이 FACE를 준수하여 설계되었다는 것을 검증한다.

The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity

  • Hyun, Chang-Taek;Hong, Tae-Hoon;Ji, Soung-Min;Yu, Jun-Hyeok;An, Soo-Bae
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.37-43
    • /
    • 2011
  • Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.

PROBABILISTIC MODEL-BASED APPROACH FOR TIME AND COST DATA : REGARDING FIELD CONDITIONS AND LABOR PRODUCTIVITY

  • ChangTaek Hyun;TaeHoon Hong;SoungMin Ji;JunHyeok Yu;SooBae An
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.256-261
    • /
    • 2011
  • Labor productivity is a significant factor related to control time, cost, and quality. Many researchers have developed models to define method of measuring the relationship between productivity and various constraints such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only contains the average productivity data of the construction industry, and it is difficult to predict the time and cost of any particular project; hence, there are some errors in estimating duration and cost for individual activity and project. To address these issues, this research collects data, measures productivity, and develops time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites and it is possible that the result will be used as the EVMS baseline of cost management and schedule management.

  • PDF

BIM 객체분류체계 (OBS) 개념 및 구조 (Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM)

  • 정영수;김예솔;김민;주태환
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.88-96
    • /
    • 2013
  • 건설정보화의 다양한 노력 중, 최근 Building Information Modelling (BIM) 활용이 급속히 확대되고 있으며 그 활용 형태 또한 점차 '고도화' 및 '효율화'되고 있다. 그럼에도 불구하고, BIM 실무활용을 위해서 요구되는 다대한 추가 업무 부담은 BIM 실무적용의 가장 중요한 장애요인으로 지적되어 왔다. 이러한 맥락에서, 본 연구는 BIM 활용의 기능적인 '고도화'를 더욱 발전시키면서 동시에 이에 요구되는 업무 부담을 최소화시키는'효율화'를 연구목표로 설정하고, 이를 위한 핵심 요소기술로서, "BIM 객체 분류체계 (OBS)"를 정의하고 개발하였다. 본 연구에서 제안된 OBS는 BIM 도형정보의 각 객체별 식별번호를 목적에 부합한 규칙에 의해 부여함으로써, 비도형 정보(예로서 공정 및 원가)와의 연계를 용이케 하는 것을 목적으로 한다. 제안된 OBS 활용을 통하여 객체간의 물리적 위계 구성, 공정 액티비티 연계, 원가 정보 연계 등 다수 기능이 시스템화 되며, 따라서 다차원 CAD 구현을 위해 요구되는 지나치게 많은 데이터간의 연계 작업이 자동화됨으로써 BIM 실무구현의 현실성을 획기적으로 높일 수 있다. 제안된 OBS의 개념은 신한옥 주택 건설 사례를 통하여 적용 및 검증하였다.

자원기준 상대가치를 이용한 정신과의 간호활동비용 산정 (Estimation of Psychiatric Nursing Costs by Using the Resource-Based Relative Value Scale(RBRVS))

  • 김은경;권영대;김윤
    • 대한간호학회지
    • /
    • 제30권6호
    • /
    • pp.1580-1591
    • /
    • 2000
  • This study was conducted to assess the amount of nursing services for psychiatric inpatients and to estimate psychiatric nursing costs by using the RBRVS. Full details of medical services, including physician and nursing services, for psychiatric inpatients were surveyed and data of general characteristics of hospitals and patients were also collected. The cost of nursing activities was estimated by the multiple conversion factor which was drawn from the Korean RBRVS Development Project to the RBRVS score of each nursing activities, which was drawn from the results of Korean Nurses Association (KNA)'s projects about nursing RBRVS development and cost of nursing activities. The data about 89 inpatients from 3 general hospitals with psychiatric departments were analyzed. The total cost of nursing activities for each patient per admission day was from KRW 22,185 to KRW 27,954 by hospital, and KRW 25,220 in average. The percent of nursing cost to the total cost of medical services was from 36% to 48% by characteristics of patients and 41.4% in average. The cost of nursing activities estimated in this study was between the existing NHI fee schedule and the one suggested by KNA. It is considered as appropriate and acceptable level compared to the total amount of medical services. In the process of KNA's activities to get nursing fee in NHI fee schedule, results of additional studies to estimate the cost of nursing activities balanced with total cost of medical services in every departments should be found and utilized.

  • PDF

IFC활용 BIM기반 공정/원가 통합관리 프레임워크 (A Framework Integrating Cost and Schedule based on BIM using IFC)

  • 이진강;이현수;박문서;정민혁
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.53-64
    • /
    • 2013
  • 건설프로젝트 관리 과정에는 수많은 정보가 존재한다. BIM(Building Information Modelling)은 정보전달의 매개체로써 공정 및 원가 정보를 관리하여 4D(3D+Time), 5D(4D+Cost) 시뮬레이션 등 다양한 이익을 얻을 것으로 예상되었다. 그러나 BIM 활용과정에 따른 정보의 연계 문제, BIM 객체기반 공정/원가 정보의 한계, BIM 소프트웨어 호환성 문제 등으로 인해 BIM을 활용한 공정 및 원가정보의 관리는 적극적으로 활용되지 못하고 있다. 이에 본 연구에서는 위의 문제점들을 개선하고자 IFC(Industry Foundation Classes)활용 BIM기반 공정/원가 통합관리 프레임워크를 제안하였다. 먼저, 정보 입력 문제와 정보 표현의 한계점을 개선하기 위해 공간을 최소단위로 공정 및 원가정보를 통합 관리하는 데이터베이스를 구축하고, 데이터 호환성 문제를 해결하기 위해 국제 표준 데이터 포맷인 IFC를 활용하여 앞서 구축한 데이터베이스의 정보와 BIM 소프트웨어를 연계하여 BIM을 기반으로 한 공정/원가 정보의 통합관리를 시도하였다. 이는 BIM기반 공정/원가 통합관리를 위한 정보 처리 프로세스의 기초를 제공하며, 정보 요구에 대한 정확한 이해를 도와 의사소통의 정확성을 향상시켜 BIM기반 공정/원가관리의 효율성을 높일 것으로 예상된다.

BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안 (A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase)

  • 정준호;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.23-34
    • /
    • 2011
  • 건설현장에서 정확한 진도를 관리하기 위해서는 비용정보와 일정정보를 결합한 통합정보가 요구되며 프로젝트의 성과측정을 위한 기초자료가 된다. 그러나 국내 건설공사는 비용과 일정정보를 각각 관리함으로써 객관적인 성과측정이 어려우며 내역서상의 물량을 액티비티에 분개하는 작업을 통해 생산성을 감소시킨다. 한편, BIM을 활용한 연구가 진행되면서 BIM을 통해 보다 효율적으로 진도관리하는 연구가 필요한 실정이며 현장에서는 일일 작업관리에 대한 필요성이 요구되고 있다. 이러한 건설 산업의 흐름에 따라 본 논문에서는 BIM 모델의 위치정보와 BIM기반의 견적데이터를 활용하여 3가지 타입의 진도관리단위를 생성하고 이를 통해 일일 진도율 및 일일 기성액을 파악하는 정보모텔을 제시하고자 한다.

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 - (BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -)

  • 이해찬;김진만;최철호;송상훈
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.