As the chemical industry becomes more advanced, the awareness of chemical accidents is rising, and legal systems for chemical safety management are strengthened. In this study, quantitative risk assessment of liquid chlorine leak was conducted. Risk assessment was performed in the order of frequency analysis, consequence analysis, and risk calculation. The individual risk was presented in the form of contour lines. The social risk was expressed by the FN curve. The risk of day and night was in an unacceptable area, so it was required to mitigate risk. Therefore in-building, which could trap the pool, was selected as a risk mitigation measure. As a result of the cost benefit analysis, it was concluded that this measure should be reasonably implemented.
A water treatment utility in South Korea operates a large system of pressurized hollow fiber membrane (PHFM) modules. The optimal selection of membrane module for the full scale plant was critical issue and carried out using Risk-based Life Cycle Cost (RbLCC) analysis based on the historical data of operation and maintenance. The RbLCC analysis was used in the process of decision-making for replacing aged modules. The initial purchasing cost and the value at risk during operation were considered together. The failure of modules occurs stochastically depending on the physical deterioration with usage over time. The life span of module was used as a factor for the failure of Poisson's probability model, which was used to obtain the probability of failure during the operation. The RbLCC was calculated by combining the initial cost and the value at risk without its warranty term. Additionally, the properties of membrane were considered to select the optimum product. Results showed that the module's life span in the system was ten years (120 month) with safety factor. The optimum product was selected from six candidates membrane for a full scale water treatment facility. This method could be used to make the optimum and rational decision for the operation of membrane water purification facility.
International conference on construction engineering and project management
/
2020.12a
/
pp.103-113
/
2020
The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.
This study investigates whether and how a firm's cost of equity is influenced by the extent of a firms's name change. Even though corporate name change doesn't give any benefit to investors, it can be a signaling about firm's future valuation. And also, if that signaling has high credibility, it can be decrease information cost and the firm's cost of equity. on the contrary to this, if corporate name change is kind of break with the past and corporate image laundering, it is bad signaling to investors. So it can be increase information risk and the firm's cost of equity. Using yearly cross-sectional regressions of the cost of equity on our proxies for corporate name change, size, beta, market-to-book ratio and other innate risk factor over the 2005-2010, we find that the cost of capital is positively associated with corporate name change after controlling for all other factors. This result implies that corporate name change increase information risk of the business, and thus increase information asymmetries between managers and outside investors with respect to a firm's true future value. This increases information risk, and creates an adverse selection problem, on the part of outside investors. Rational investors therefore demand a premium for bearing this corporate name change-related information risk, which in turn leads us to observe a positive relation between the intensity of corporate name change and the cost of equity.
Korean Journal of Construction Engineering and Management
/
v.23
no.5
/
pp.98-107
/
2022
The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.
Proceedings of the Korean Operations and Management Science Society Conference
/
1996.04a
/
pp.213-216
/
1996
R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.
Korean Journal of Construction Engineering and Management
/
v.1
no.1
s.1
/
pp.35-44
/
2000
The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.
It is difficult for consumers to satisfy high safety request with post-management method such as inspection and surveillance, as various changes in-and-out of the country associated with food safety. In terms of food safety problems related to foods, it is crucial to recognize public health and consumer protection and construct pre-preventive Food Control System. A joint committee, FAO/WHO made the following consultations to the National Food Safety System. ${\circ}$ Approach entirely from farm to table ${\circ}$ Get ready for Risk Analysis System ${\circ}$ Secure transparency ${\circ}$ Establish the optimal policy by evaluating the effect of regulation When it comes to summarizing the consultation, it would be accumulated as two key words; "Efficiency" and "Credibility". Whereas the problem of efficiency focuses on precaution rather than post-management, it requires policy option to maximize consumer's benefit by evaluating the cost for the Food Safety Management and its benefit. Also, analyzing risk's character and amount, demanding an optimal means, and introducing scientific analysis system put much value on the stakeholder's communications are procedure's security which can satisfy both "Efficiency" and "Credibility" simultaneously. Especially, it is emphasized here that Risk Assessment need to be separated from Risk Management. This action is a valid means of credibility security throughout improving transparency. A number of nations and organizations have reformed the method of food management passing through reflection and examination of the prior National Food Safety Management since BSE occurred in Britain, 1996. FSA; Food Standard Agency, AFFSA, EFSA, BfR, and FSC are Risk Assessment Organization functionally separated from Risk Management Organization, JECFA, JMCFA, JMPR, JEMRA in Codex charge Risk Assessment internationally. In case of advanced countries excluding several those such as The U.S. and so forth, though these Risk Assessment Organizations are either separated functionally within Risk Management Organization or operated as apart organ, common factors are in which it has independence as Science Base. While securing independence of Risk Assessment Function, it is a tendency Risk Management should be functionally unified into efficiency as well. Though Germany constructs integral Risk Management System of diverse ways according to social and political conditions of each country such as GFOCP, DVFA, SNFA, CFIS and AQIS, there is a key word in the center, "Securing efficiency of Food Safety Management". However our nation has a representative plural;diversified system with The U.S., we took a step forward for unification as empowering policy's generalization;adjustment and Risk Assessment Function by means of enacting the "Food Safety Fundamental Law" in 2008 and establishing the "Food Safety Policy Commission" with private and governmental sectors in the Prime Minister's office. Even though the unification of Risk Management hereby increased, there is the lack of strengthening function of Risk Assessment and securing independence. It needs to be required for the professional committee in Food Safety Policy Commission to develop as a exclusive office of Risk Assessment by separating from a policy decision. Administrative Branches should reinforce feeble functions such as fundamental investigation;research for carrying out Risk Assessment with securing efficiency throughout reassessment of prior Risk Management Means.
International conference on construction engineering and project management
/
2007.03a
/
pp.130-139
/
2007
This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.
Economic value added (EVA) is introduced on two levels: as index for evaluation of corporation and as index for evaluation of business unit. In the latter case, application of one and the same cost of capital to all business units of a business corporation may be possible, but it is a fundamental policy for EVA to apply different cost of capital to business units with different risks. Estimate of cost of capital of business units is a problem to be resolved. The author, focusing on the question of the estimate of cost of capital of business units, has conducted a demonstrative study on risk structure of cost of capital estimates by using financial indices of Japanese manufacturers (37 automotive industries, 141 electrical and electronic machinery industries, 63 food processing industries, 98 chemical industries, 125 general machinery industries) for a period of 5 years from 1995 to 1999. The author presumes that $\beta$ is explained by a regression formula ${\beta}=B_0+{\Sigma}B_iY_i+{\alpha}$ ($Y_i$: financial indices) and selects 40 explanatory variables from financial statements as risk components. Using their financial indices, the author concludes through a series of statistical analyses that there is a good likelihood of estimating cost of capital for Japanese industries and is convinced that it will lead to more reliable and practical results by assigning averages and variances to 40 primary financial indices for a period of 3 to 5 years selected in this demonstrative study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.