• 제목/요약/키워드: cost improvement

검색결과 3,106건 처리시간 0.032초

서울 지하철의 운임제도 개선방안 (The Improved Device of Seoul Subway Fare System)

  • 이태식;전영준;권오철;정종기;이동욱
    • 한국철도학회논문집
    • /
    • 제9권2호
    • /
    • pp.200-205
    • /
    • 2006
  • Subway widely used as a major mean of public transportation both at home and abroad contributes to ease chronic traffic congestion in cities. However, subway operating expense is expected to increase continuously because subway requires vast amount of money at the construction stage, huge sum of maintenance cost is spent during operation, and passenger needs for more convenient facilities is increasing. on the contrary to enormous operating expenses, fare that is occupying most of operating income doesn't come up to its prime cost causing chronic operating deficit. It is urgent to prepare fare system improvement measures to increase operating income in order to resolve financial difficulty of a subway operating organization. Therefore, the current study analyzed present condition and problems of subway fare system, and suggested improvement measures such as improvement of fare adjustment procedure, improvement of free-ride system, diversification of ticket, etc.

분산형 공급체인에서 단계별 정보지연 개선이 주는 효과 (The Impact of Information Lead Time Improvement on the Distributed Supply Chain System)

  • 김철수;최근영
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제10권2호
    • /
    • pp.129-150
    • /
    • 2001
  • In this study, we model a decentralized supply chain system which is managed by four types of centers, sequentially located: Retailer, Wholesaler, Distributor, and Factory Each center contributes to enhancing the performance of the supply chain system individually with its own local inventory information. Through experiments which are performed with a programmed simulation (like the MIT beer game), we investigate how the information lead time improvement in each center affects the whole system. And we show that the impact of the lead time improvement in the downstream, like retailers, affects more to the system than the one in the upstream, like factories, in a cost-effective way. Moreover, by using information lead time for each center, we analyze how much the extent of the improvement affects the whole system, especially for the total cost and the order level.

  • PDF

A-GNSS Performance Test in Various Urban Environments by Using a Commercial Low Cost GNSS Receiver and Service

  • Han, Kahee;Lee, Jung-Hoon;Im, Ji-Ung;Won, Jong-Hoon
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제7권4호
    • /
    • pp.205-215
    • /
    • 2018
  • The recent emergence of new Global Navigation Satellite Systems (GNSS) has resulted in a gradual improvement in the performance of positioning services. This paper verifies the degree of improvement in positioning performance of Assisted-GNSS (A-GNSS) receivers using assistance information compared to standalone-GNSS receivers that do not use assistance information in various urban environments in Korea. For this purpose, field tests are performed in various urban and indoor environments in Korea. The assistance information is provided by u-blox's AssistNow Online and low-cost commercial receivers are used for mobile station receivers. Through experiments, the Time to First Fix (TTFF), acquisition sensitivity, and position accuracy performance improvement are analyzed. The results of the experiments show that using assistance data improved the performance in all experiment locations, and, in particular, a significant performance improvement in terms of TTFF.

VE 적용에 의한 지하 골조공사 개선연구 (Case Study on the Improvement of Underground Building Works through the VE)

  • 홍재욱;김선국;이종국
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.106-113
    • /
    • 2004
  • 건설산업의 고부가가치화를 위해서는 계획적인 원가절감에 의한 방법과 기능의 향상에 의한 방법 및 효율적인 추가 원가투입에 의하여 더 높은 기능 향상을 실현함으로써 부가가치를 높이는 방법을 추구하여야 할 것이다. 특히 건축공사에서 골조공사는 전체 공정 및 원가에 영향을 크게 미치는 주요 공정으로서 철저한 공사관리 계획과 관리가 요구되는 부분으로서 생산 활동 및 공사 방식 선정의 효과를 크게 볼 수 있는 항목이라 할 수 있다. 본 연구는 현재 도심지 공사에서 날로 증가하고 있는 지하공사의 비율을 감안하여 지하골조 공사의 성능개선에 초점을 두었다. 건축물의 지하골조공사에 있어 효과적인 공기 및 원가절감을 위하여 VE 기법을 검토하여 VE 프로세스와 분석차원을 모델링하고, 이를 현장에 적용, 사례연구를 통하여 그 타당성을 입증하였다. 따라서 본 연구는 건축물 지하골조공사의 VE 활용모델로서 기술대안 선정방식 수립의 기초적인 연구가 될 것으로 기대된다.

26 GCM 결과를 이용한 미래 홍수피해액 예측 (Flood damage cost projection in Korea using 26 GCM outputs)

  • 김묘정;김광섭
    • 한국수자원학회논문집
    • /
    • 제51권spc1호
    • /
    • pp.1149-1159
    • /
    • 2018
  • 본 연구는 우리나라 113개 중권역에 대한 기후변화에 따른 미래 홍수 피해액의 예측을 위하여 26개 GCM 모형에서 생산한 강우자료와 1시간 최대 강수량, 10분 최대 강수량, 1일 강수량이 80 mm 초과한 일수, 일 최대 강수량, 연강수량, 유역고도, 시가화율, 인구 밀도, 자산 밀도, 도로와 같은 사회 간접 시설, 하천개수율, 하수도 보급률, 배수펌프시설, 유수지용량 및 과거 홍수 피해액 자료를 활용하였다. 구축된 자료에 대하여 구속 다중선형회귀 모형(Constrained Multiple Linear Regression Model)을 적용하여 홍수 피해액과 여타 입력자료 사이의 상관관계를 구축하고 RCP 4.5와 8.5에 대한 26개 GCM 모형 산정자료를 활용하여 미래 홍수 피해액을 예측하였다. 홍수피해에 주된 요인이 되는 연강수량, 극치 강우량 등 강우관련 요소들이 전반적으로 증가하며 이로 인하여 과거 홍수로 인한 피해액이 광범위하게 증가할 것으로 판단되고 특히 동해안 및 남강댐 유역에 미래의 홍수피해액이 높게 예측되는 경향을 보인다.

Method and Procedure for Economic Evaluation of Improvement Activities

  • Kono, Hirokazu;Ichikizaki, Osamu
    • Industrial Engineering and Management Systems
    • /
    • 제14권2호
    • /
    • pp.122-128
    • /
    • 2015
  • The purpose of this paper is to propose an appropriate evaluation scheme for improvement activities, based on a simple model comprising cash inflow by sales as well as variable and fixed cost expenditures. The paper distinguishes capacity surplus and capacity shortage situations, and examines economic benefits gained by yield increase improvement and capacity increase. The paper then proposes a basic rule of thumb for economic evaluation of improvement activities. The logic is simple but useful in practice, being conducive towards improvement activities under current economic conditions with uncertainties.

고액진료비 환자의 특성 비교분석 - 의료보험과 의료보호환자를 중심으로 - (Comparative Analysis on the Characteristics of High Cost Medical Users between the Health Insurance and Medical Assistance Program)

  • 강선희;문옥륜
    • 한국의료질향상학회지
    • /
    • 제2권2호
    • /
    • pp.112-129
    • /
    • 1996
  • Background : A small number of high cost patients usually spend a larger proportion of scarce health resources. Aged, long-term care and readmitted patients usually belong to these high cost patient group. Among others, long length of stay and readmission can be reduced by checking its cause, and these are the areas needed most of quality improvement activity. Characteristics of high cost medical users between health insurance program and medical assistance program were reviewed. Methods : The inpatient claims of health insurance and medical assistance program were analyzed. Patients were divided by 6 groups; long-term, mid-term, short-term, readmitted, cancer and aged. We defined high cost patients as those who had spent one and half million won and over per 6 months. Characteristics of high cost patients for each group were reviewed. Results : medical assistance patients used much more resources than the insured members in the average hospital cost per case but less in daily hospital cost. The former had a longer length of stay and had much heavier diseases. Major diseases of both group were cancer, diseases of circulatory system and chronic degenerative diseases. Gallstone and schizophrenia were more in the insured program. However, pulmonary tuberculosis, asthma were more common among the medical assistance patients. Early readmission before 2 weeks were 28-30% of the total readmission. Readmission rate in the malignat neoplasm and renal failure were 80% and more. Q.A program should be installed to prevent unnecessary readmissions. Conclusion : Almost 30% of early readmissions and admissions due to complications and long length of stay should be reviewed carefully to keep cost down and to enhance the quality of hospital care.

  • PDF

버스정류장 시설 개선의 정량적 효과 분석: 이용자 만족도 조사 기반 CVM을 중심으로 (A Quantitative Analysis of Effects on Enhancing Bus Shelter Infrastructure: Focusing on Contingent Valuation Method by an User's Satisfaction Survey)

  • 김규혁;김명규;김나연;김희수;송태진
    • 한국ITS학회 논문지
    • /
    • 제23권2호
    • /
    • pp.89-105
    • /
    • 2024
  • 버스 이용자의 편의성 제고를 위해 정류장 시설을 개선하는 것은 매우 중요하며, 기 시행된 정류장 개선 사업의 효과를 정량적으로 분석하는 것은 사업의 지속적 확대를 위해 필수적이다. 그럼에도 불구하고 현재는 버스정류장 인프라 개선의 정량적 효과를 추정하는 연구가 전무한 실정이다. 본 연구에서는 정류장 개선에 대한 이용자 만족도에 기반한 조건부 가치측정법을 통해 버스정류장 인프라 개선에 대한 지불의사액과 편익-비용비를 추정했다. 결론적으로 거점지역에 위치한 정류장의 개선은 비용 대비 높은 편익을 달성할 수 있으며, 비거점지역에 위치한 정류장의 개선은 지역주민의 삶의 질 향상에 큰 영향을 미치는 것으로 나타났다. 본 연구의 결과는 버스정류장 시설 개선 사업 확장 시 근거자료로 활용될 것이라 판단된다.

하수처리장에서의 연계처리수 요금 개선에 따른 경제성 분석 (Suggestions for Cost Improvement of High concentration Linked Treatment in Municipal Wastewater Treatment Plant)

  • 이지원;길경익
    • 한국습지학회지
    • /
    • 제22권2호
    • /
    • pp.139-144
    • /
    • 2020
  • 최근 고농도의 연계처리수를 인근 하수처리장으로 유입하고 있으나, 합리적이지 못한 연계처리 요금제도로 인해 지자체에서 하수처리 운영이 어려운 실정이며 이를 증명할 수 있는 근거나 데이터가 부족한 상황이다. 하지만, 국가 필수기반시설인 하수처리장은 일반적으로 예비타당성조사를 면제를 받기 때문에 경제성 평가를 실시한 사례가 전무하다. 따라서, 본 연구진은 선행연구를 통해 기존 연계처리 부과금의 단점을 보완할 수 있는 개선안을 제시하였고, 본 연구에서는 경제성분석을 실시하여 개선안을 적용하였을 때 기존 대비 얼마나 경제성이 개선될 수 있는지 비교평가를 하였다. 이를 위해 기존 환경시설의 예비타당성 평가 자료와 노후하수처리시설 현대화 진행 시 책정한 비용인자와 편익인자를 참고하였고, 연구진이 자체적으로 판단하였을 때 연계처리로 인해서 발생할 수 있는 편익 등을 고려하여 적용하였다. 연구결과 기존에는 B/C(Benefit/cost)값이 상당히 낮았으나, 연구진이 제안한 개선안을 적용하였을 경우 B/C값이 1에 가깝게 증가하는 것을 확인할 수 있었다. 따라서 본 연구진이 제안한 연계처리 부하에 따라 연계처리 부과금을 산정하는 방식은 매우 합리적이고 타당한 것으로 판단된다.

철골 공장가공의 생산성 및 공장간접비율 실태분석 (Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant)

  • 김경원;안방률;태용호;허영기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF