• Title/Summary/Keyword: cost calculation standard

Search Result 144, Processing Time 0.021 seconds

A Study on Developing the Model of Reasonable Cost Calculation for Privacy Impact Assessment of Personal Information Processing System in Public Sector (공공기관 개인정보 처리시스템의 개인정보 영향평가를 수행하기 위한 합리적인 대가 산정 모델 개발에 관한 연구)

  • Shin, Young-Jin
    • Informatization Policy
    • /
    • v.22 no.1
    • /
    • pp.47-72
    • /
    • 2015
  • According to the progress of national informatization throughout the world, infringement and threaten of privacy are happening in a variety of fields, so government is providing information security policy. In particular, South Korea has enhanced personal impact assessment based on the law of personal information protection law(2011). But it is not enough to effect the necessary cost calculation standards and changeable factors to effect PIA. That is, the budgets for PIA was calculated lower than the basic budget suggested by Ministry of Government Administration Home affairs(2011). Therefore, this study reviewed the cost calculation basis based on the literature review, cost basis of similar systems, and reports of PIA and obtained to the standard with Delphi analysis. As a result, the standards of PIA is consisted to the primary labors and is utilized to how the weights by division of target system, construction and operating costs of target system, type of target systems, etc. Thus, the results of this study tried to contribute to ensure the reliability of PIA as well as the transparency of the budget for privacy in public sector.

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

A Study on the Bottom-up Long-run Incremental costing Methodology for the Korean Mobile Network (이동통신망 상호접속요금 산정을 위한 장기증분원가모형에 관한 연구)

  • Choe Seon-Mi;Hyeon Chang-Hui
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2004.05a
    • /
    • pp.25-36
    • /
    • 2004
  • The key objective of this paper is to suggest a pilot model for mobile network interconnection charge calculation by bottom-up long-run incremental costing methodology. Interconnection issues have lately attracted considerable attention by network operators and regulators. However there is no standard by all the network operators' agreement. The costing method is an acute problem because the interconnection charge is directly related to the network operators' revenue. Thus Korea has planned to launch the new interconnection policy based on the current traffic distribution and then we simulate the model in a sample area with virtual data. The results propose objective and reasonable guideline for the mobile network element cost calculation. It can be helpful for calculating price floor or bottom-up long run incremental interconnection charge by regulator.

  • PDF

Minimum cost design of overhead crane beam with box section strengthened by CFRP laminates

  • Kovacs, Gyorgy;Farkas, Jozsef
    • Structural Engineering and Mechanics
    • /
    • v.61 no.4
    • /
    • pp.475-481
    • /
    • 2017
  • An overhead travelling crane structure of two doubly symmetric welded box beams is designed for minimum cost. The rails are placed over the inner webs of box beams. The following design constraints are considered: local buckling of web and flange plates, fatigue of the butt K weld under rail and fatigue of fillet welds joining the transverse diaphragms to the box beams, fatigue of CFRP (carbon fibre reinforced plastic) laminate, deflection constraint. For the formulation of constraints the relatively new standard for cranes EN 13001-3-1 (2010) is used. To fulfill the deflection constraint CFRP strengthening should be used. The application of CFRP materials in strengthening of steel and concrete structures are widely used in civil engineering applications due to their unique advantages. In our study, we wanted to show how the mechanical properties of traditional materials can be improved by the application of composite materials and how advanced materials and new production technologies can be applied. In the optimization the following cost parts are considered: material, assembly and welding of the steel structure, material and fabrication cost of CFRP strengthening. The optimization is performed by systematic search using a MathCAD program.

An Awareness Analysis on the Design for Safety of Construction Project and Its Improvement Measures (건설프로젝트의 설계안전성 검토에 대한 인식 분석 및 개선방안)

  • Shin, Won-Sang;Son, Chang-Baek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.351-359
    • /
    • 2019
  • Recognizing that the fundamental cause of construction safety accidents was a lack of safety management activities in the planning and design phases, the government made the Design for Safety (DFS) system mandatory in May 2016. However, awareness among ordering parties and designers regarding this system is significantly low, and the system has not been properly established due to reasons such as the need for additional work and a lack of professional manpower. In this study, the awareness of ordering parties and designers of the DFS system was analyzed through a survey, various problems in DFS work execution were identified and measures for improvement were presented. Measures to improve the efficiency in DFS work execution involve the discovery of risk factors and establishment of countermeasures, and here the establishment of a DFS work support system that enables the sharing of information between institutions is the most urgent priority. In addition, it is also urgently necessary to establish a dedicated organization in charge of DFS work, cultivate professional manpower, develop the relevant education programs and establish a proper cost calculation standard for DFS work execution by design offices.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

Two-Step Rate Distortion Optimization Algorithm for High Efficiency Video Coding

  • Goswami, Kalyan;Lee, Dae Yeol;Kim, Jongho;Jeong, Seyoon;Kim, Hui Yong;Kim, Byung-Gyu
    • Journal of Multimedia Information System
    • /
    • v.4 no.4
    • /
    • pp.311-316
    • /
    • 2017
  • High Efficiency Video Coding (HEVC) is the newest video coding standard for improvement in video data compression. This new standard provides a significant improvement in picture quality, especially for high-resolution videos. A quadtree-based structure is created for the encoding and decoding processes and the rate-distortion (RD) cost is calculated for all possible dimensions of coding units in the quadtree. To get the best combination of the block an optimization process is performed in the encoder, called rate distortion optimization (RDO). In this work we are proposing a novel approach to enhance the overall RDO process of HEVC encoder. The proposed algorithm is performed in two steps. In the first step, like HEVC, it performs general rate distortion optimization. The second step is an extra checking where a SSIM based cost is evaluated. Moreover, a fast SSIM (FSSIM) calculation technique is also proposed in this paper.

Sensitivity Analysis of Major Cost Parameters on the Launch Cost of Reusable Vehicles (재사용발사체의 발사비용에 미치는 가격인자들의 민감도 분석)

  • Yang, Soo Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.24 no.2
    • /
    • pp.35-42
    • /
    • 2020
  • Recently the reusable launch vehicle is being a major trend in the worldwide space market, because a few commercial companies, especially SpaceX, are trying to cut down the launch price through developing and succeeding the reusable launch vehicles. However, there is still a big controversy about whether in view point of the launch cost which is more favorable between expendable and reusable. Therefore, a study and close examination is required for the launch cost in the early development phase of the reusable launch vehicle. In this study the sensitivity analysis is performed with respect to the major cost parameters which have great effects on the launch cost and price. The standard vehicle of this sensitivity analysis is the expendable vehicle having a payload 20 tons. The cost estimation relationships used in this calculation are referred from the commonly proven cost models such as TRANSCOST. The major cost parameters chosen in this study are as follows: development cost, production cost, refurbishment cost, and maximum reusable number.

A Survey of the effective BIM introduction plan on school building construction by Delphi Technique (델파이 기법을 이용한 학교건축물의 효율적 BIM 도입방안 조사 연구)

  • Seo, Deok Seok;Won, Ho Sik
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.1
    • /
    • pp.24-31
    • /
    • 2014
  • This study is focused to find the ways to improve the effective BIM introduction plan on school building construction by Delphi Technique. For this, the questionnaire is made by in-depth interviews of 10 BIM specialists, the survey of other 30 experts was carried out. The results of 30 experts Delphi survey are as followed. (1) The haptic effect of BIM introduction is very rare as lack of awareness and information on BIM. (2) Problems are arising from deficiency of training and experience on BIM. (3) Practical utilizations of BIM are very useful. (4) Barriers of the spread of BIM are high cost and insufficient environments. (5) The development potential of BIM is high. In order to activate the BIM market, the introduction of an accurate evaluation criteria and rational cost calculation standard are needed.

Pixel decimation for block motion vector estimation (블록 움직임 벡터의 검출을 위한 화소 간축 방법에 대한 연구)

  • Lee, Young;Park, Gwi-Tae
    • Journal of the Korean Institute of Telematics and Electronics S
    • /
    • v.34S no.9
    • /
    • pp.91-98
    • /
    • 1997
  • In this paper, a new pixel decimation algorithm for the estimation of motion vector is proposed. In traditional methods, the computational cost can be reduced since only part of the pixels are used for motion vector calculation. But these methods limits the accuracy ofmotion vector because of the same reason. We derive a selection criteria of subsampled pixels that can reduce the probablity of false motion vector detection based on stochastic point of view. By using this criteria, a new pixel decimation algorithm that can reduce the prediction error with similar computational cost is presented. The simulation results applied to standard images haveshown that the proposed algorithm has less mean absolute prediction error than conventional pixel decimation algorithm.

  • PDF