• 제목/요약/키워드: cost calculation model

검색결과 261건 처리시간 0.035초

Adaptive energy group division in the few-group cross-section generation for full spectrum reactor modeling with deterministic method

  • Yichen Yang;Youqi Zheng;Xianan Du;Hongchun Wu
    • Nuclear Engineering and Technology
    • /
    • 제56권6호
    • /
    • pp.2019-2028
    • /
    • 2024
  • Advanced nuclear reactors, especially the newly developed small and micro-reactors have complex neutron spectrum, which makes the deterministic reactor core calculations sensitive to the energy group structure of few-group cross-sections. To avoid significantly increasing the cost of energy discretization in the core calculation, two energy group structures with 31 groups and 33 groups were adopted for typical thermal and fast reactor cores, respectively. Then, an adaptive scheme of group division for reactor cores with a medium neutron spectrum was proposed. The works were based on the full spectrum nuclear reactor analysis code SARAX/TULIP. An equivalent one-dimensional model of the core was proposed to capture the key neutron spectrum features of the reactor core. Such features were used to adaptively determine a few-group structure for the following reactor core calculations. Then, the neutron spectrum in different zones with more details was calculated. With this spectrum, the cross-sections were condensed into the determined energy groups. Three tests based on different neutron spectrum were calculated to verify the schemes. The results show that using the adaptive energy group division scheme, the following core calculation can meet the accuracy requirement of different reactors with different neutron spectra.

거래전략 및 Quadratic 혼잡비용을 고려한 LMP산정에 대한 연구 (LMP Calculation with Consideration of Transaction Strategy and Quadratic Congestion Cost Function)

  • 김재욱;정성훈;민경일;문영현
    • 전기학회논문지
    • /
    • 제60권2호
    • /
    • pp.257-265
    • /
    • 2011
  • As the competitive market system has been introduced to the electrical power trade, the priority concern would be that the price of electrical power should be reasonable. It is because, when this rule is solid, we can avoid the distortion of competition and assure the greater efficiency in management. LMP(Locational Marginal Price) means marginal price at each bus. This components consist of energy, loss and congestion cost. At this point, the LMP result that is calculated by traditional model is changeable by the location of the slack and can not be used in bilateral Transaction. This paper proposed algorithm is proved its rationality and credibility by comparing the result of the simulation of virtual 6_bus system that is calculated by traditional method, and showed that the LMP components are changed according to the Transaction Strategy. Furthermore, It shows the effect of additional congestion cost on the transmission line that has bottle neck frequently by simulation.

해상풍력발전단지의 해상변전소 변압기 적정 용량에 관한 연구 (A Study on the Adequate Capacity of Substation Transformer for Offshore Wind Farm)

  • 문원식;조아라;허재선;배인수;김재철
    • 조명전기설비학회논문지
    • /
    • 제29권8호
    • /
    • pp.83-89
    • /
    • 2015
  • This study suggests the methodology to decide the number and adequate capacity of substation transformer in a large-scale offshore wind farm (OWF). The recent trend in transformer capacity of offshore substation is analyzed in many European offshore wind farm sites prior to entering the studies. In order to carry out the economic evaluation for the transformer capacity we present the cost models which consist of investment, operation, and expected energy not supplied (EENS) cost as well as the probabilistic wind power model of wind energy that combines the wind speed with wind turbine output characteristics for a exact calculation of energy loss cost. Economic assessment includes sensitivity analysis of parameters which could impact the 400-MW OWF: average wind speed, availability, discount rate, energy cost, and life-cycle.

공공아파트 실적데이터 기반의 지역지수 산정 모델 개발 (Development of a Calculating Model for Local Index Based on Historical Data of Public Apartment Buildings)

  • 임대희;이승훈;서용칠
    • 한국건축시공학회지
    • /
    • 제10권2호
    • /
    • pp.75-80
    • /
    • 2010
  • 국내 주택건설시장은 가격 경쟁의 심화와 함께 형태 구조적인 다양화가 동반되어 사업의 불확실성이 증가하고 있다. 이로 인해 건설사업 기획단계의 중요성이 강조되고 있으며, 점점 더 높은 정확도를 가진 개산견적을 요구하고 있다. 현재 초기 기획단계의 공사비 산정에 관한 연구나 프로그램 개발이 다수 이루어지고 있으나, 지역성을 고려하여 결과를 도출한 경우는 많지 않다. 비용 산정 시 지역적 보정이 함께 이루어진다면 보다 정확한 비용 추정이 가능하고, 이는 곧 성공적인 프로젝트 수행에 큰 역할을 할 수 있을 것이다. 따라서 본 연구의 목적은 공공아파트 실적데이터를 기반으로 하여 지역지수 산정 방법론 및 산정 모델을 구축하고, 공사비 추정 시 활용할 수 있는 지역지수를 도출하는 것이다.

신규 도입차량 유지관리 기술과 품질보증 대책에 대한 고찰 (A Study on the New Rolling Stock Vehicle Maintenance Technology and Discussion on Quality Assurance Measures)

  • 최석중;김문홍;김봉래
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.27-37
    • /
    • 2011
  • Currently, in the course of introducing rolling stocks, RAMS standard and management by system engineering method apply to rolling stock system. Technical elements and results applied in system introduction phase are just used in acquisition stage, and these are not applied to the standard in railway site. Therefore, it is difficult to apply to standardized technology and quality assurance measure. Due to the establishment of the EU, railway operation system is internationalized and the international railway standards are being discussed in various ways. In addition, standardization is expanded from manufacture to operation and maintenance. It is to provide consistent standard in quality, cost calculation of maintenance technology, maintenance technology and quality assurance in case of international railway safety incidents. Therefore, this study is to find technology, quality and cost management model to be used for choosing railway-operation guidance by considering how technologies & quality have changed in system life cycle, compared with estimated standards, based on the technologies & quality-related result in the process of getting new rolling stocks and management guidance for operation & maintenance process.

  • PDF

3차원 합성곱 신경망 기반 향상된 스테레오 매칭 알고리즘 (Enhanced Stereo Matching Algorithm based on 3-Dimensional Convolutional Neural Network)

  • 왕지엔;노재규
    • 대한임베디드공학회논문지
    • /
    • 제16권5호
    • /
    • pp.179-186
    • /
    • 2021
  • For stereo matching based on deep learning, the design of network structure is crucial to the calculation of matching cost, and the time-consuming problem of convolutional neural network in image processing also needs to be solved urgently. In this paper, a method of stereo matching using sparse loss volume in parallax dimension is proposed. A sparse 3D loss volume is constructed by using a wide step length translation of the right view feature map, which reduces the video memory and computing resources required by the 3D convolution module by several times. In order to improve the accuracy of the algorithm, the nonlinear up-sampling of the matching loss in the parallax dimension is carried out by using the method of multi-category output, and the training model is combined with two kinds of loss functions. Compared with the benchmark algorithm, the proposed algorithm not only improves the accuracy but also shortens the running time by about 30%.

의료보험 관리체계에 대한 연구 - 관리비용을 중심으로 - (A Study on the Health Insurance Management System; With Emphasis on the Management Operating Cost)

  • 남광성
    • 보건교육건강증진학회지
    • /
    • 제6권2호
    • /
    • pp.23-39
    • /
    • 1989
  • There have been a lot of considerable. discussion and debate surrounding the management model in the health insurance management system and opinions regarding the management operating cost. It is a well known fact that there have always been dissenting opinions and debates surrounding the issue. The management operating cost varies according to the scale of the management organization and component members characteristics of the insurance carrier. Therefore, it is necessary to examine and compare the management operating cost to the simulated management models developed to cover those eligible for the health insurance scheme in this country. Since the management operating cost can vary according to the different models of management, four alternative management models have been established based on the critical evaluation of existing theories concerned, as well as on the basis of the survey results and simulation attempts. The first alternative model is the Unique Insurance Carrier Model(Ⅰ) ; desigened to cover all of the people with no classification of insurance qualifications and finances from the source of contribution of the insured, nationwide. The second is the Management Model of Large-scale District Insurance Carrier(Ⅱ) ; this means the Korean society would be divided into 21 large districts; each having its own insurance carrier that would cover the people in that particular district with no classification of insurance qualifications arid finances as in Model I. The third is the Management Model of Insurance Carrier Divided by Area and Classified with Occupation if Largescale (Ⅲ) ; to serve the self-employed in the 21 districts divided as in Model Ⅱ. It would serve the employees and their dependents by separate insurance carriers in large-scale similar to the area of the district-scale for the self-employed, so that the insurance qualifications and finances would be classified with each of the insurance carriers: The last is the Management Model of the Multi - insurance Carrier (Ⅳ) based on the Si. Gun. Gu area which will cover their own self- employed people in the area with more than 150 additional insurance carriers covering the employees and their dependents. The manpower necessary to provide services to all of the people according to the four models is calculated through simulation trials. It indicates that the Management Model of Large-scale District Insurance Carrier requires the most manpower among the four alternative models. The unit management operating costs per the insured individuals and covered persons are leveled with several intervals based on the insurance recipients. in their characteristics. The interval levels derived from the regression analysis reveal that the larger the scale of the insurance carriers is in the number of those insured and covered. the more the unit management operating cost decreases. significantly. Moreover. the result of the quadratic functional formula also shows the U-shape significantly. The management operating costs derived from the simulated calculation. on the basis of the average salary and related cost per staff- member of the Health Insurance Societies for Occupational Labours and Korean Medical Insurance Corporation for the Official Servants and Private School Teachers in 1987 fiscal year. show that the Model of Multi-insurance Carrier warrants the highest management operating cost. Meanwhile the least expensive management operating cost is the Management Model of Unique Insurance Carrier. Insurance Carrier Divided by Area and Classified with Occupation in Large-scale. and Large-scale District Insurance Carrier. in order. Therefore. it is feasible to select the Unique Insurance Carrier Model among the four alternatives from the viewpoint of the management operating cost and in the sense of the flexibility in promoting the productivity of manpower in the human services field. However. the choice of the management model for health insurance systems and its application should be examined further utilizing the operation research analysis for such areas as the administrative efficiency and factors related to computer cost etc.

  • PDF

데토네이션 파 해석을 위한 탄화수소 연료/산화제의 Induction Parameter Modeling (Induction Parameter Modeling of Hydrocarbon Fuel/Oxidizer for Detonation Wave Analysis)

  • 최정열
    • 한국연소학회:학술대회논문집
    • /
    • 한국연소학회 제26회 KOSCO SYMPOSIUM 논문집
    • /
    • pp.57-62
    • /
    • 2003
  • A general procedure of obtaining reliable one-step kinetics model for hydrocarbon mixture from the fully detailed chemistry is described iin this study. One-step theoretical formulation of the induction parameter model IPM uses a theoretical reconstruction of the induction time database obtained from a detailed kinetics library. Non-dimensional induction time calculations is compared with that of detailed kinetics. The IPM was latter implemented to fluid dynamics code and applied for the numerical simulation of detonation wave propagation. The numerical results including the numerical smoked-foil record show the all the details of the detonation wave propagation characteristics at the cost around 1/100 of the detailed kinetics calculation.

  • PDF

A Study on DEM-based Automatic Calculation of Earthwork Volume for BIM Application

  • Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
    • 한국측량학회지
    • /
    • 제38권2호
    • /
    • pp.131-140
    • /
    • 2020
  • Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.

건설시설물 친환경 VE를 위한 환경비용 및 친환경가치모델 정립 (Definition of Environmental Cost and Eco-VE Model for Eco-VE of Construction Facility)

  • 김명진;김준수;김병수
    • 대한토목학회논문집
    • /
    • 제36권5호
    • /
    • pp.903-913
    • /
    • 2016
  • 기후변화에 관한 파리협정(Paris Agreement)은 우리나라의 친환경정책에 많은 영향을 미칠 것으로 보인다. 그동안 건설공사의 설계단계에서 탄소발생량을 줄이기 위한 친환경설계가 적용되어 왔다. 그러나 친환경건축물 인증에 해당하는 프로젝트 외에는 소극적 적용에 그치고 있다. 설계에 친환경요소를 반영하기 위해서는 현재 100억 이상 모든 건설공사의 기본설계 및 실시설계단계에 적용되고 있는 설계VE(Value Engineering) 제도를 활용할 필요가 있다. 하지만 현재 적용되고 있는 VE Job Plan은 친환경 요소를 일부 반영하는데 그치고 있으므로 그 효과는 미미할 수 밖에 없다. 따라서 기존 VE 기법에 친환경요소를 반영한 새로운 형태의 친환경VE 기법의 개발이 필요하다. 연구의 결과 환경비용의 개념은 회계학적으로 정의되고 그 비용의 산정은 이산화탄소 배출량을 기반으로 하는 탄소세, $CO_2$배출권 거래가격, 지불의사금액, 탄소생산성 개념을 이용하는 방법이 많이 사용되고 있었다. 그러나 설계단계에서 친환경VE에 활용하기 위해서는 탄소생산성 개념을 포함한 새로운 개념의 모델이 필요하다. 새로운 개념의 친환경VE모델은 $CO_2$배출량과 잠재적환경오염지수를 사용하는 모델이다. 본 연구에서는 친환경VE의 한 축을 담당할 환경비용에 대한 개념과 친환경가치모델을 정립하고자 하였다.