• Title/Summary/Keyword: cost calculation

Search Result 1,042, Processing Time 0.025 seconds

Economic Analysis of the Piezoelectric Power using the California Standard Test (캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.

Using a Modular BOM for Cost Calculation in Wiring Harness (Modular BOM을 활용한 와이어링 하네스 원가 산출)

  • Im, Chang-Sung;Park, Hoon;Kang, Jung-Tae
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.1
    • /
    • pp.61-68
    • /
    • 2016
  • Since past till now, automotive wiring harness has been designed and produced under the method of part number list. However, the number of options has increased gradually on the basis of customer's needs and car manufacturer's policy, thereby bringing about an increase in the number of classified parts. Because of a large number of classified parts, cost estimates for manufacturing and production planning are more important than ever. However, the pre-existing manufacturing bill of material abbreviated as BOM is only focused on the list of materials used for actual manufacturing, and as such there have been limits to other fields or areas of usage except for manufacturing. In essence, the present paper is concerned with our study conducted on modular BOM as one of planning BOM. On such basis, we have been able to completely use a method by which to have access, make an option units' calculation in wiring harness manufacturing, and build an efficient system for cost estimates in manufacturing as well.

A study on the MVNO Wholesale Price in Competitive Communication Service Market (경쟁적인 통신서비스 시장에서 MVNO 도매대가 산정에 관한 연구)

  • Sawng, Yeong-Wha;Bae, Khee-Su;Jeon, Heung-Joo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.217-231
    • /
    • 2012
  • In the past, companies should make enormous facility investment and acquire a right to do business in order to join communication markets, but now they can do business without important facilities, such as communication networks. Such a movement to ease regulations about companies which want to newly join the communication industry is expected not only to change a competition frame of the mobile communication market but also to greatly affect the entire communication industry. Through this study aiming to look into a way to calculate a reasonable wholesale price related to the government's introduction of the Mobile Virtual Network Operator (MVNO) system, I came up with a following result. I applied the operating profit percentage and the ratio of operating gain to cost to the cost plus model and retail minus model, respectively, to calculate the wholesale price and found that when I calculated with the cost plus model applying the operating profit percentage, I could get the highest wholesale price. On the other hand, I got the lowest wholesale price with the retail minus model by applying the operating profit percentage. Division of expenses and calculation of profit percentage are important factors in calculating the wholesale price and such results are expected to help accurate calculation of the MVNO wholesale price.

The Analysis of Maintenance & Repair Cost in Educational Facilities of Primary and Secondary Schools - Focusing on Primary and Secondary Schools in Incheon Metropolitan City - (초.중등 교육시설의 유지관리비 분석 - 인천광역시 초.중등학교를 중심으로 -)

  • Kim, Young-Gu;Lee, Jae-Rim
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.16 no.1
    • /
    • pp.33-41
    • /
    • 2009
  • The purpose of this study is to provide a basis for calculation of school operation fees for normal functioning of the school facilities, and facility maintenance and repair cost through their life spans, considering remodeling of the facilities and changes of their functions. This study analyzes maintenance and repair records during the three years from 2003 to 2005 in primary, middle and high schools in Incheon Metropolitan city and also the facility management and operation expenditure of the same schools in the city during the year of 2005, and presents quantified unit cost of each item according to the area, the age of the facilities, and the number of classroom, student, and lessons given. The calculation can be a basis for both BTL school facility managers and the general school facility mangers to budget school facility maintenance cost appropriately and the quantity of energy, water, electricity, and telephone fees calculated here can be a criteria for the managers to check the normal maintenance of their facility.

A Study of the Regulations for Calculation of Acceleration Costs on Construction Work (건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구)

  • Min, Byeong-UK;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.409-417
    • /
    • 2017
  • The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Cost Effectiveness of Bse-Isolation for Bridges in Low and Moderate Seismic Region (중저진 지역에서의 지진격리교량의 경제적 효율성에 관한 연구)

  • 고현무
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.04a
    • /
    • pp.178-185
    • /
    • 1999
  • Minimum life-cycle cost helps to evaluate cost effectiveness of base-isolated bridges under specific condition. Life-cycle cost mainly consists of the initial construction cost and the expected damage cost. Damage cost estimation needs proper model of input ground motion failure probability evaluation method and limit states definition. We model the input ground motion as spectral density function compatible with the response spectra defined at each seismicity and site condition. Spectrum analysis and crossing theory is suitable for reseating calculation of failure probabilities in the process of cost minimization. Limit states of base-isolated bridges re defined for superstructure isolator and pier respectively The method is applied to both base-isolated bridges and conventional bridges under the same conditions to investigate cost effectiveness of base isolation in low and moderate seismic region. the results show that base-isolation of bridges are more effective in low and moderate seismic region and that the site effects on the economical efficiency may not be negligible in such a region.

  • PDF

A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage (기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰)

  • Jo, Seong-Min;Cho, Sung-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

A Study on the Loss calculation and Cost Prediction for Induction Heating Coil of IH Jar (IH밥솥의 유도 가열 코일 손실 계산 및 Cost 예측에 관한 연구)

  • Ryu, Seung-Hee;Park, Byeong-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1037-1039
    • /
    • 2002
  • 가전산업과 연계하여 유도가열 기술을 응용한 대표적인 시스템으로 IH압력밥솥을 예로 들 수 있다. 유도가열 코일에서 고주파 자속의 의해 발생된 와전류가 결합된 밥솥을 가열하기 때문에 유도가열 코일에는 고주파 손실을 줄이기 위해 Litz wire가 사용된다 이에 본 논문은 특히 IH압력밥솥에 사용되는 Litz wire를 선정하는 데 있어 중요한 요소가 되는 소선경, 가닥수별 AC DC 저항 및 손실계산 그리고 Cost 예측 방법을 제안한다.

  • PDF