• 제목/요약/키워드: cost calculation

Search Result 1,039, Processing Time 0.024 seconds

Bus Power Quality Index and Cost based on Load-Voltage Characteristics (부하의 전압특성을 고려한 모선별 전력품질 지표 및 가격 산정기법)

  • Lee, Geun-Joon;Heydt, G.T.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.9-14
    • /
    • 2002
  • In front of the opening of electric distribution market in 2004. it is indispensable to have a proper estimation of power quality index and power quality cost calculation mechanism are indispensable to stabilize highly industrialized society and to vitalize the investment for electric power system. However, there were not enough measures to reflect the voltage characteristics such as voltage sags and interruptions which make electric load in unstable operation. This paper suggests power quality index(LDI) and power quality cost(LDC) which translate various kinds of voltage records into load drop index and cost based on aggregated load CBEMA curve. A sample calculation result shows that this method can produces the acceptable power quality index and costs for utilities and customers requirements.

  • PDF

Calculation of Construction Cost Rate to Telecommunications Engineering Service (엔지니어링대가 공사비 요율 산출방법 고찰)

  • Hong, Wan-Pyo;Choi, Kwang-Don
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.12
    • /
    • pp.2121-2125
    • /
    • 2006
  • This paper shows the calculation system of construction cost rate to telecommunications engineering service that is based on the tenth article of the Engineering Technique Promotion Law. The existing construction cost rate had been calculated using the experiential statistics or quoted the foreign construction cost rates. This paper apply the theoretical method to calculate the construction cost rate instead of the existing method. To calculate it more reasonably, this paper apply the characteristic own of the current construction cost rate. The result of this paper can be introduced to calculate the construction cost rate for the telecommunication engineering service.

A Study on Building of Underpass for Small Vehicles by Benefit and Cost Analysis (편익과 비용 분석을 통한 소형차전용지하차도 도입에 관한 연구)

  • Lee, Young Woo
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.149-157
    • /
    • 2013
  • PURPOSES : This study is to analysis for benefit and construction cost in underpass for small vehicles. METHODS : The study was performed using the traffic software VISSIM 5.20 for analysis on a variety of traffic conditions and analysed of benefits of changes through analysis of travel speed and travel time after modeling of existing underpass and small vehicle underpass. RESULTS : Results of this study, the benefits will be reduced by the introduction underpass for small vehicles were analyzed because heavy vehicles use the intersection above the underpass. However, it was required economic analysis considering both the benefits reduction and the construction costs reduction because it has the effect of reducing the construction cost. Showed that the difference in benefit changes depending on the v/c and heavy vehicles ratio and construction cost was difference by types of underpass. As a result of performing economic analysis with total benefits and construction cost, it was analyzed to be economical in underpass over a certain size. CONCLUSIONS : The result of this study are expected to be able to contribute to reviewing for feasibility due to the small vehicles underpass introduction and economic analysis. The study is case study to the underpass in Daegu. Therefore, the future requires the calculation of benefits reflect a wider range of traffic conditions and the economic analysis to construction cost calculation for various types of grad separation facilities.

Computation cost reduction method of EBCOT using upper subband search information in the wavelet domain (웨이블릿 영역에서의 상위 부대역 탐색정보를 이용한 EBCOT의 연산량 감소 방법)

  • Choi, Hyun-Jun;Paik, Yaeung-Min;Seo, Young-Ho;Kim, Dong-Wook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.13 no.8
    • /
    • pp.1497-1504
    • /
    • 2009
  • This Paper Propose a method to reduce the calculation time in JPEG2000. That is, if a coefficient is estimate a upper-level subband and its descendents skip the scan process. There is a trade-off relationship between the calculation time and the image quality or the amount of output data, the calculation time and the amount of output data decreases, but the image degradation increases. The experimental results showed that in calculation time was 35% in average, which means that ls ge ses. The ein calculation time and output data can be obtls ed with a cost of an acceptlble image quality degradation.

A Presumption of Water Supply Amount for Calculation of Equipment Capacity in High School Building (고등학교 건축물의 장비용량 산출용 급수량 추정)

  • Park Yool;Lee Hak-Soo;Lee Sung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.10
    • /
    • pp.768-775
    • /
    • 2006
  • The water supply system has been designing by decision process such as calculation of water supply amount, capacity of water tanks and pumps, pipe size. Especially, when we estimate excessively water supply amount, the initial cost and running cost will increase according to enlargement of the water tank and pump capacity, and water quality of ground water tank can become worse. Therefore, calculation of water supply amount is basically most important factor. In order to calculate exactly water supply amount applying domestic real situation, we should set up basic data as well as study calculation methods. This research would consider calculation methods of water supply amount for school building through examine domestic and foreign basic data of water supply amount and characteristics of domestic school, and estimate daily water supply in high school.

Optimal Long-term Transmission Planning Algorithm using Non-linear Branch-and-bound Method (비선형 분산안전법을 이용한 최적장기송전계률 알고리)

  • 박영문;신중린
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.37 no.5
    • /
    • pp.272-281
    • /
    • 1988
  • The problem of optimal transmission system planning is to find the most economical locations and time of transmission line construction under the various constraints such as available rights-of-way, finances, the technical characteristics of power system, and the reliability criterion of power supply, and so on. In this paper the constraint of right-of-way is represented as a finite set of available rights-of-way. And the constructed for a unit period. The electrical constraints are represented in terms of line overload and steady state stability margin. And the reliability criterion is dealt with the suppression of failure cost and with single-contingency analysis. In general, the transmission planning problem requires integer solutions and its objective function is nonlinear. In this paper the objective function is defined as a sum of the present values of construction cost and the minimum operating cost of power system. The latter is represented as a sum of generation cost and failure cost considering the change of yearly load, economic dispatch, and the line contingency. For the calculation of operating cost linear programming is adopted on the base of DC load flow calculation, and for the optimization of main objective function nonlinear Branch-and-Bound algorithm is used. Finally, for improving the efficiency of B & B algorithm a new sensitivity analysis algorithm is proposed.

Economic Dispatch Algorithm for Unit Commitment (기동정지계획을 위한 경제급전 알고리즘)

  • Park, Jeong-Do;Lee, Yong-Hoon;Kim, Ku-Han;Moon, Young-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1506-1509
    • /
    • 1999
  • This paper presents a new economic dispatch algorithm to improve the unit commitment solution while guaranteeing the near optimal solution without reducing calculation speed. The conventional economic dispatch algorithms have the problem that it is not applicable to the unit commitment formulation due to the frequent on/off state changes of units during the unit commitment calculation. Therefore, piecewise linear iterative method have generally been used for economic dispatch algorithm for unit commitment. In that method, the approximation of the generator cost function makes it hard to obtain the optimal economic dispatch solution. In this case, the solution can be improved by introducing a inverse of the incremental cost function. The proposed method is tested with sample system. The results are compared with the conventional piecewise linear iterative method. It is shown that the proposed algorithm yields more accurate and economical solution without calculation speed reduction.

  • PDF

Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information (3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

Comparison and Validation Plan for the Calculation Method of Required Maintenance Float (M/F) (정비대체장비(M/F) 소요산출 방법비교 및 검증방안 연구)

  • Lee, Hak-Jae;Kim, Jae-Hwang;Jung, Jae-Woo;Seo, Mu-Kyung;Kwon, Ki-Sang
    • Journal of Applied Reliability
    • /
    • v.18 no.2
    • /
    • pp.143-152
    • /
    • 2018
  • Purpose: In this paper, we propose calculation methods of Maintenance Float (M/F). Results of each method are compared and verified by using commercial tool (OPUS Suite). As modern weapon systems become more expensive, we need to find the most economical and efficient method to achieve the target operational availability (Ao). Methods: Three kinds of methods (Considering the number of CSP, Applying the Poisson distribution, and Applying M&S Tool) are used to find the number of M/F. Three methods (Considering the number of CSP, Applying the Poisson distribution, and Applying M&S Tool) were used to estimate the required number of M/F. The analysis results were verified by SIMLOX. The cost of equipment calculated by each analysis method was compared and the cause of the difference was analyzed. Conclusion: Ao and cost must be considered to find the optimal number of M/F. In general, it costs more to increase availability. But the cost is not necessarily proportional to Ao. Therefore, it is better to compare the calculation method and determine the final MF quantity.

Multicast Tree Generation using Meta Reinforcement Learning in SDN-based Smart Network Platforms

  • Chae, Jihun;Kim, Namgi
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.9
    • /
    • pp.3138-3150
    • /
    • 2021
  • Multimedia services on the Internet are continuously increasing. Accordingly, the demand for a technology for efficiently delivering multimedia traffic is also constantly increasing. The multicast technique, that delivers the same content to several destinations, is constantly being developed. This technique delivers a content from a source to all destinations through the multicast tree. The multicast tree with low cost increases the utilization of network resources. However, the finding of the optimal multicast tree that has the minimum link costs is very difficult and its calculation complexity is the same as the complexity of the Steiner tree calculation which is NP-complete. Therefore, we need an effective way to obtain a multicast tree with low cost and less calculation time on SDN-based smart network platforms. In this paper, we propose a new multicast tree generation algorithm which produces a multicast tree using an agent trained by model-based meta reinforcement learning. Experiments verified that the proposed algorithm generated multicast trees in less time compared with existing approximation algorithms. It produced multicast trees with low cost in a dynamic network environment compared with the previous DQN-based algorithm.