• Title/Summary/Keyword: construction work site

Search Result 909, Processing Time 0.027 seconds

An Analysis of the Effect of Weather Condition with Work Sections in Building Construction (건축공사 공종별 기후요소 영향도 분석)

  • Kim Baek-Joong;Seo Jang-Woo;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.141-144
    • /
    • 2006
  • The building construction is an essential field to consider weather condition because construction works are performed in a site. From this reason, this study evaluated the effect of weather condition with work sections in building construction by Analytic Hierarchy Proces (AHP) method. The results of this study as follows : (1) The effect of weather condition with work sections is affected by rainfall in summer season, and by a low temperature in winter season (2) The effect of weather condition with work sections is 0.235 for mold work, 0.210 for concrete work, 0.181 for steel-frame work.

  • PDF

Developing the Accident Injury Severity on a Field of Construction Work Using Ordered Probit Model (순서형 프로빗 모형을 적용한 공사장 교통 사고심각도 분석)

  • Hong, Ji-Yeon;Kim, Kyung-Tae;Lee, Soo-Beom
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.2
    • /
    • pp.89-98
    • /
    • 2011
  • The traffic accidents at a construction site, which happen due to construction vehicles' frequent access to a construction site, its subsequent conflicts with ordinary vehicles and pedestrians, and inappropriate installation & management of traffic security facilities, have not many proportions in all traffic accidents, but obviously, the accident damage is quite serious when comparing the level of the fatal per one accident. This research conducted an analysis of traffic accident injury severity using Ordered Probit Model in relation to 241 traffic accident cases that occurred caused by construction sites among the traffic accidents that took place in Seoul and Gyeoggi-do region for two years from 2006 until 2007. As a result, the significant variables enough to explain traffic accident injury severity were analyzed to be the state of road surface, linear shape of an accident spot & whether the damaging car belongs to the vehicle for construction, and whether vehicles have access to a construction site at the time of an accident. Through this, this research found out some fact as follows: first, there need to be more aggressive management of the vehicles for construction and a year-round placement of the manpower who can control vehicular access to a construction site. Second, it is necessary to get drivers to recognize the fact that there exists a construction site on the construction section which is on the border of curved roads in advance to prevent a traffic accident, helping to reduce socioeconomic loss & costs incurred by a traffic accident.

Construction Information Process Using Digital Pen -Focused on Defect management System- (디지털 펜 입력 시스템을 활용한 건설 정보 처리에 관한 연구 -하자관리 시스템을 중심으로-)

  • Park, Gyu-Tae;Jung, Young-Chul;Nam, Hyun-Jung;Son, Bong-Ki;Kim, Tae-Hui;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.135-138
    • /
    • 2010
  • In the construction industry, construction management system using information technology has been applied diversely to increase productivity. Although IT device such as PDA, RFID, Barcode, wireless network and web camera has been introduced in construction site, the usage of these device is restricted, because these cause engineer to do additional work. The suggested process using Digital Pen in this study, which can lessen engineer's additional work, get defect data promptly. Also accumulated data is utilized effectively for analyzing construction site. The purpose of this study is to introduce Digital Pen System as a means of construction data acquisition for improving productivity.

  • PDF

Integrating Building Information Modeling and Health and Safety for Onsite Construction

  • Ganah, Abdulkadir;John, Godfaurd A.
    • Safety and Health at Work
    • /
    • v.6 no.1
    • /
    • pp.39-45
    • /
    • 2015
  • Background: Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods: In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results: The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion: From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

A Study on the Practical lighting Guide for Night Work (야간작업 안전의 적정조명 기준설정을 위한 실험연구)

  • Ro Min-Lae;Son Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.3 s.67
    • /
    • pp.70-77
    • /
    • 2004
  • A Reasonable lighting should be provided for doing night work. All works far construction site can be exposed to potential hazard at night work The purpose of this study is to provide a standard of the lighting against accidents due to insufficient lighting at site. one pilot tea one at building work site, one at mad work site of it have been conducted for figuring out illumination change depending worker's activity direction, using lux checker to show it as numerical indication. The direction are changed with a range of 30, 60, 90, and 135 degree to be checked at site. Tests results show that $10\%\;and\;15\%$ of lighting could be decreased by changing the working direction of works at site. Therefore, steep slope place, cave work and backside of structural elements such as a column, deep beam should be considered for keeping sufficient and reasonable lighting. It is found that $50\%more$ illumination Lux needs f3r civil work than for building work.

A Study on the Impact to Safety Management and the Prevention Measure by the Speedy Construction Work (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok;Lim, Kyu-Won
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.243-254
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

  • PDF

An Experimental Study on the Correlationship Between Highrised Safetyguard and Workers' Safety (안전난간유형에 따른 작업자 안전의 상관관계에 대한 실험적 연구)

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.2
    • /
    • pp.80-84
    • /
    • 2001
  • Work stress and health are very important factors related to workers' condition and work safety, Author has conducted a couple of tests to check up three people's pulses before they work during their work for three types of safety guard in construction site. Work type, age, weight, sex experience year, ambient temperature n recorded as variables in this study. These are checked and asked by the author directly, before their pulse check Also, workers' Pulses were measured at height H-0 and H-9.0m to understand psychological the degree of psychological nervousness degree. POLAR protrainer NVTM HRM system(wrist recorder and sensor) was used for the site test. There are three(3) different types of construction safety guard which have been used for, this study. They are usually or frequently used and found in the site. Four different ranges of age groups(20's, 30's 40's, 50's) carpenters are assisted to the test sites with wearing pulse recorder and sensor respectively. All three types of safety guards have the same height 90㎝ even though they are different types. On top of five(5) stories tublar framed scaffolding is fabricated, similar to the one in site, where those safety guards are installed. The older(=more experienced) the workers are the more stable they are. it is shown. Also, It is verified the visually uncomfortable rail type can cause workers to psychologically be unstable.

  • PDF

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction (사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안)

  • Jun, Younghun;Kim, Kyoontai;Jeon, Eunbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.120-130
    • /
    • 2021
  • Recently, the government is reinforcing safety management at construction sites to prevent safety accidents in construction works, and the safety management plan of workers is an important situation. Meanwhile, modular construction is expected to be gradually expanded to middle and high-rise buildings, but active measures to ensure worker safety are insufficient. This study is a preliminary study of the development of a checklist for preventive worker safety management. The purpose of this study is to derive a checklist classification system for the safety management of workers in the field of modular construction by preceding studies, case analysis, and expert advisory opinions. The classification system consists of large categories of factory manufacturing, transportation, and on-site construction, and the sub-system consists of six sub-classes: foundation work, frame work, modular frame installation work, finishing work, and facility work. Among them, the sub-classification of modular frame installation work consists of 12 unit works, centering on module lifting and assembly module work, which are the main construction processes. And the classification system reflects the three main management factors and contents for defined safety management. It is expected that the research results of this study can contribute to efficient safety management at the modular construction site.

A Study On the Safety Management of construction equipment Using Smart Phone Technology (Focused on poclain and mobile elevated work platform) ("스마트폰" 기반을 활용한 건설장비 안전관리에 관한 연구 (굴삭기, 고소작업대중심으로))

  • Jo, Jeong-Ho;Im, Jae-Chang;Go, Yeong-Uk;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.43-59
    • /
    • 2012
  • As contemporary building construction type is getting higher and deeper,construction equipment usage is getting more, and related fatal accidents are on an increasing trend. In these days, due to the deteriorating construction business circumstance, job finding problem of equipment operator, and dumping contract, equipment lease suppliers are putin jeopardy. In high-rise building construction, especially tower crane, mobile elevated work platform and other High place operation cars among construction equipment cause many critical accidents because of drop supply of construction biding bringing out dumping contract could cause unsafe and poor construction management. Because of this, a method was drawn which could grasp the present state of construction equipment management and manage safety of the equipment more easily for accident prevention by choosing 2 kinds of Construction equipment which cause safety accident frequently among the equipment mainly used in construction site. This study suggested a method about construction equipment safety management using "smart phone" base which could be used in safety management for construction equipment by whomever in construction site. After attachment of QR code included safety checklist, It became possible that site managers could check more efficiently by scanning with their smart phone when they inspect equipment. Moreover, by the construction interested who didn't know what and how they have to inspect could point out unsafe condition in the early stage of equipment entering or take unsafe one out of the site by using new smart phone safety checking system is installed, it became possible that critical accident caused by construction equipment was prevented in advance.

  • PDF