Improvement Efficiency of Tunnel Work using Site Surveying System (현장측량시스템을 이용한 터널공사의 효용성 향상)

  • Choi, Seok-Keun;Ahn, Won-Tae
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.31-37
    • /
    • 2006
  • The existing tunnel survey method contains many problems of taking much measuring time, increasing construction expenses, and delaying a term of construction. Therefore the site survey system for an improvement efficiency is developed. This system will be able to solve the ewer factor and the problem of curtailment of time and expenditure. In order to solve these problems it connected a measurement equipment and a notebook computer, and developed the system which simultaneously with tunnel measurement it will be able to decide locations and errors from site at real-time. The development or the tunnel survey system minimize the error occurrence as measuring tunnel, and the probability of more or less excavation. Therefore this site survey system leads to the effect of the improvement execution quality of work, the cost reduction and the construction term reduction.

  • PDF

Construction Cost Analysis of HPC Method by PC Construction Project Cases (사례분석에 의한 HPC공법의 공사비 분석)

  • Noh, ju-seong;Kim, Jae-yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

Correlation Analysis between Organization Conflict and Job Stress of Construction Manager in Construction Site (건설현장 건설사업관리기술자의 조직갈등과 직무스트레스 상관관계 분석)

  • An, Sung-Hoon;Bitamba, Bauma Frigeant
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.367-373
    • /
    • 2020
  • As the supervision in site is integrated into construction management, the organization's work is expanded, and the perspective and goals of the work have changed, so there is a high possibility that the conflict situation within the organization will increase. Organization conflict increase a job stress of workers, so it acts as a negative factor in deriving organizational performance. Therefore, the purpose of this study is to analyze the correlation between organization conflict and job stress of construction manager in construction site. As a result of the study, the organization conflict of the construction manager was generally low, and the job stress was also less than that of other area's workers. In addition, correlation analysis revealed that organization conflict and job stress were related. The results of this study may help to improve the organization structure in the construction management site organization.

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

Analysis of Practical Task for Improvement of Safety Manager's Work Efficiency (건설공사 안전관리자 업무효율성 향상을 위한 실무업무 분석)

  • Sohn, Sung-Geun;Eom, Yong-Been;Jeong, U-Jin;Kang, Sang-Hun;Lim, Jee-Young;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.265-266
    • /
    • 2021
  • Recently, the importance of disaster prevention has emerged as serious accidents have occurred frequently, in which workers died or seriously injured at industrial sites. In response, the government enacted the 'Act on the Punishment of Major Disasters' to strengthen the responsibility, punishment intensity, and regulation of business owners for accidents at the site. In particular, the construction industry accounts for a large proportion of serious accidents, so safety levels need to be raised through on-site management. This study aims to reduce the occurrence of disasters at construction sites and to improve the work efficiency of safety managers. To derive detailed elements of the safety manager's work, domestic and overseas cases were investigated. The derived items were analyzed for the difficulty and preventive effects of the work through a survey of experts, and they will contribute to disaster prevention by presenting tasks to be focused and suggesting ways to improve inefficient tasks.

  • PDF

A Study on the Actual Condition Analysis and Improvement of Rebar Work in Korean Building Construction (국내 철근공사 실태분석 및 개선방안에 관한 연구)

  • Park, U-Yeol;Kim, Gwang-Hui;Gang, Gyeong-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.83-91
    • /
    • 2004
  • With labor shortage and high-wage era, the construction cost is rising and the construction business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. However, although reinforcing bar(rebar) work, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work and to find methods of betterment, a survey was conducted to site engineers and individuals in division of cost estimate of domestic construction company. The survey questions were on the subjects of (1) calculating rebar quantity, (2) ordering and procurement, (3) rebar cutting and bending, and (4) rebar work management. Method of improvement was sought by analyzing the results of the survey

Development of a Work Information Model and a Work Path Simulator for an Intelligent Excavation (지능형 굴삭을 위한 작업정보모델 및 작업경로 시뮬레이터 개발)

  • Kim, Sung-Keun;Min, Sung-Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3D
    • /
    • pp.259-267
    • /
    • 2012
  • The development of construction automation systems is proposed as a potent solution to the difficulties encountered by the construction industry and the preparation for the rapidly changing construction environment. A research concerning an intelligent excavation system has taken place since 2006. The intelligent excavation system has several functions for environment sensing, 3D site modeling, work planning, work path generation, unmaned control, and information management. This paper presents a space information model and a work path simulator for work planning and work path generation which is one of key technologies required to apply the earthwork system to the real world. A data structure for an earthwork site is suggested. It overcomes the limitations of previous data structures such as Quadtree and Octree. The work path simulator can generate an effective work path with considering information on work environment, equipment and operator's heuristic. The work path generated by the simulator is compared with that suggested by human operators.

Plans for Reducing Risk through a Case Study of Risk Factors at a Construction Site -Focused on Earth work, Foundation Work, Reinforced Concrete Construction- (건설현장의 위험요소 사례연구를 통한 위험저감 방안의 고찰 -토공사, 기초공사, 철근콘크리트공사를 대상으로-)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.83-93
    • /
    • 2010
  • With construction projects continuously becoming more massive and complex, risk factors have been consistently increasing. To achieve a successful project, it is very important to identify and cope with such risk factors. Therefore, the purpose of this study is to suggest plans of reducing risk, not only for describing the drafting process for construction planning but also for systematically organizing constraints and risk factors in earth work, foundation work and reinforced concrete construction. To achieve these objectives, this study 1) analyzes previous theories about risk classification structure, 2) performs a case study of an actual project to embody the problems of safety management by analyzing the results of an interview with a construction engineer. In conclusion, the following factors were systematically organized: 1) characteristics of construction site (purpose, structure, floor, etc.); 2) the actual application conditions of the main construction methods; 3) the relationship between constraints and risk factors.