• Title/Summary/Keyword: construction time and costs

Search Result 383, Processing Time 0.025 seconds

Vision-Based Identification of Personal Protective Equipment Wearing

  • Park, Man-Woo;Zhu, Zhenhua
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.313-316
    • /
    • 2015
  • Construction is one of the most dangerous job sectors, which reports tens of thousands of time-loss injuries and deaths every year. These disasters incur delays and additional costs to the projects. The safety management needs to be on the top primary tasks throughout the construction to avoid fatal accidents and to foster safe working environments. One of the safety regulations that are frequently violated is the wearing of personal protection equipment (PPE). In order to facilitate monitoring of the compliance of the PPE wearing regulations, this paper proposes a vision based method that automatically identifies whether workers wear hard hats and safety vests. The method involves three modules - human body detection, identification of safety vest wearing, and hard hat detection. First, human bodies are detected in the video frames captured by real-time on-site construction cameras. The detected human bodies are classified into with/without wearing safety vests based on the color features of their upper parts. Finally, hard hats are detected on the nearby regions of the detected human bodies and the locations of the detected hard hats and human bodies are correlated to reveal their corresponding matches. In this way, the proposed method provides any appearance of the workers without wearing hard hats or safety vests. The method has been tested on onsite videos and the results signify its potential to facilitate site safety monitoring.

  • PDF

Machine Learning Based Asset Risk Management for Highway Sign Support Systems

  • Myungjin CHAE;Jiyong CHOI
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.145-151
    • /
    • 2024
  • Road sign support systems are not usually well managed because bridges and pavement have budget and maintenance priority while the sign boards and sign supports are considered as miscellaneous items. The authors of this paper suggested the implementation of simplified machine learning algorithms for asset risk management in highway sign support systems. By harnessing historical and real-time data, machine learning models can forecast potential vulnerabilities, enabling early intervention and proactive maintenance protocols. The raw data were collected from the Connecticut Department of Transportation (CTDOT) asset management database that includes asset ages, repair history, installation and repair costs, and other administrative information. While there are many advanced and complicated structural deterioration prediction models, a simple deterioration curve is assumed, and prediction model has been developed using machine learning algorithm to determine the risk assessment and prediction. The integration of simplified machine learning in asset risk management for highway sign support systems not only enables predictive maintenance but also optimizes resource allocation. This approach ensures that decision-makers are not inundated with excessive detailed information, making it particularly practical for industry application.

Application of Accrual Basis for Calculation of Prolongation Cost in Construction Projects (공기연장 추가간접비 산정기준의 발생주의방식 적용 연구)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.111-120
    • /
    • 2018
  • Recently, Domestic public construction projects are experiencing a great deal of disputes because of the growing uncertainty about the criteria for calculating the prolongation cost. In addition, researchers have been studying various systems and proper cost estimates in an effort to reduce the uncertainty of these systems and the occurrence of disputes. However, there is no standard yet for social consensus. Meanwhile, The study on the classification system according to the recognition standard of accounting has been systematically studied. As a result, the concepts of accrual and cash basis are defined separately. The purpose of this study is to verify the possibility of applying the concept of 'accrual basis' to the Standard for calculation of prolongation cost. Therefore, As a result of analyzing the occurrence pattern of Job-site overhead cost, it is confirmed that actual costs can not be calculated by the cash-basis method. In particular, the implications of the necessity of the accrual-basis method should be more strictly indicated in the case of items such as indirect labor costs and welfare benefits. In addition, the contractor 's claim report and the appraisal report were examined. As a result, it was confirmed that the calculation situations of prolongation costs are biased to the cash-basis method. In this way, it is suggested that necessary to supplement the calculation standard of the actual costs from the point of view of accrual basis.

A Study on Establishing a Digital Twin Model for Automated Layout Robots (먹매김 시공 자동화 로봇의 디지털 트윈 모델 구축 방안 연구)

  • Park, Gyuseon;Lee, Dohyeon;Jang, Minho;Kim, Taehoon;Lim, Hyunsu;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.155-156
    • /
    • 2022
  • In the process of developing an industrial robot, various simulations should be conducted to evaluate the driving, movement, and performance of the robot. Space and time constraints exist to manufacture existing robots and implement various simulations, and efficiency is reduced due to high costs. To solve this problem, many simulations can be conducted by implementing the same movement and working environment as the real environment in virtual reality using digital twin technology. This study proposes a process for establishing a digital twin model of automated layout robots. Using the digital twin model, it is expected that it will not only evaluate the hardware performance of the robot in the future, but also verify the robot's algorithms such as motion planning and work process, identify and solve potential problems in advance, and prevent problems caused by software.

  • PDF

A Study on the Characteristics of Landfill Expenses on Urban and Residential Environment Maintenance Project - Centered around Seoul City - (도시 및 주거환경정비사업 매몰비용 특성에 관한 연구 - 서울시를 중심으로 -)

  • Lee, Mi-Ok;Lee, Im-Jung
    • KIEAE Journal
    • /
    • v.17 no.2
    • /
    • pp.35-43
    • /
    • 2017
  • Purpose: The purpose of this study is to find out the characteristics of service (landfill) costs (hereinafter, the "landfill costs") applied to the dissolution promotion committee and analyze the characteristics of landfill costs at the time where the dissolution of promotion body is increasing with the authority of the head of local government regarding the territory difficult with the continuous promotion by delaying or suspending the project for a prolonged period or suspending the project through the dissolution of the project body by the promotion committee and cooperative union since the flawless promotion of the maintenance project. Method: After revising the law in February 2012, the survey and analysis is made for the status of applying landfill costs and maintenance project scale of the dissolution promotion committee not confirmed in details around a total of 20 regions, including, 9 regions of redevelopment projects completed with the advance review, 7 regions of re-construction projects and 4 regions of urban environment maintenance projects from the total of 59 regions, Result: The influence on the landfill costs is shown to be greatest in the service expenses and management and supervision on this field has significance for the maintenance project perceived as private project, rather than public project, that the public management is neglected with insufficient presentation of operation criteria and so forth that it displays the tendency to lead to the discrete operation of the project body. In order to enhance the transparency of operating costs for the projects that are led by private capital, it is required to strengthen the role of public sector through enthusiastic intervention by the public sector in standardization of operation criteria, presentation of guideline and so forth.

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

A Study on the Actual Condition Analysis and Improvement of Rebar Work in Korean Building Construction (국내 철근공사 실태분석 및 개선방안에 관한 연구)

  • Park, U-Yeol;Kim, Gwang-Hui;Gang, Gyeong-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.83-91
    • /
    • 2004
  • With labor shortage and high-wage era, the construction cost is rising and the construction business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. However, although reinforcing bar(rebar) work, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work and to find methods of betterment, a survey was conducted to site engineers and individuals in division of cost estimate of domestic construction company. The survey questions were on the subjects of (1) calculating rebar quantity, (2) ordering and procurement, (3) rebar cutting and bending, and (4) rebar work management. Method of improvement was sought by analyzing the results of the survey

A study activating devices in scheduling management for analyzing progress payment in Korea (기성지급방식 비교분석을 통한 국내 공정관리 활성화 방안에 관한 연구 -경부고속철도 공사와 대만 고속철도공사 비교 중심으로-)

  • 이태식;김영현;정현진;김영환;김대영;윤철수;노시현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.66-71
    • /
    • 2001
  • Most payments in domestic construction are issued in lumpsum unit price contracts according to the completed construction rate. This method generates problems in losing time and increased costs for the owner and contactor. In overseas projects, payments are issued in accordance to completed milestones. The milestones themselves base on the original schedule and allow effective schedule management on the tasks. In domestic construction, however, introduction of milestone payments requires enhanced management capability of owners and contractors. Hence, this study investigating how to activate schedule management devices to analyze progress payments in domestic construction.

  • PDF

GIS Application for Planning Roadway Construction (도로 공사의 시공계획을 위한 GIS의 적용)

  • Kang Sang-Hyeok;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.565-568
    • /
    • 2003
  • Roadway construction planning processes involve a large amount of information on design, construction methods, quantities, unit costs, and production rates. GIS (Geographic Information System) is a strong tool for integration and managing various types of information such as spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Spatial Analysis' and 'Visualization' functions. The proposed system cail help construction planner make a proper decision in a unique way by integrating design information and construction information within the system and creating design element modules for space scheduling purposes in real-time with its 'Interactive Planning' function.

  • PDF