• Title/Summary/Keyword: construction research

Search Result 15,331, Processing Time 0.043 seconds

Unbilled Revenue and Analysts' Earnings Forecasts (진행기준 수익인식 방법과 재무분석가 이익예측 - 미청구공사 계정을 중심으로 -)

  • Lee, Bo-Mi;Park, Bo-Young
    • Management & Information Systems Review
    • /
    • v.36 no.3
    • /
    • pp.151-165
    • /
    • 2017
  • This study investigates the effect of revenue recognition by percentage of completion method on financial analysts' earnings forecasting information in order industry. Specifically, we examines how the analysts' earnings forecast errors and biases differ according to whether or not to report the unbilled revenue account balance and the level of unbilled revenue account balance. The sample consists of 453 firm-years listed in Korea Stock Exchange during the period from 2010 to 2014 since the information on unbilled revenue accounts can be obtained after the adoption of K-IFRS. The results are as follows. First, we find that the firms with unbilled revenue account balances have lower analysts' earnings forecast accuracy than the firms who do not report unbilled revue account balances. In addition, we find that the accuracy of analysts' earnings forecasts decreases as the amount of unbilled revenue increases. Unbilled revenue account balances occur when the revenue recognition of the contractor is faster than the client. There is a possibility that managerial discretionary judgment and estimation may intervene when the contractor calculates the progress rate. The difference between the actual progress of the construction and the progress recognized by the company lowers the predictive value of financial statements. Our results suggest that the analysts' earnings forecasts may be more difficult for the firms that report unbilled revenue balances as applying the revenue recognition method based on the progress criteria. Second, we find that the firms reporting unbilled revenue account balances tend to have higher the optimistic biases in analysts' earnings forecast than the firms who do not report unbilled revenue account balances. And we find that the analysts' earnings forecast biases are increases as the amount of unbilled revenue increases. This study suggests an effort to reduce the arbitrary adjustment and estimation in the measurement of the progress as well as the introduction of the progress measurement method which can reflect the actual progress. Investors are encouraged to invest and analyze the characteristics of the order-based industry accounting standards. In addition, the results of this study empower the accounting transparency enhancement plan for order industry proposed by the policy authorities.

  • PDF

Uplift Capacity of Wood Pile for Greenhouse Foundation (온실 기초용 나무말뚝의 인발저항력 검토)

  • Yun, Sung Wook;Choi, Man Kwon;Lee, Si Young;Yu, Chan;Yoon, Yong Cheol
    • Journal of Bio-Environment Control
    • /
    • v.24 no.2
    • /
    • pp.123-127
    • /
    • 2015
  • Wood piles are rarely used in the construction of a greenhouse in Korea, but they are relatively more often used in other countries, such as the Netherlands. There are several advantages associated with wood piles: they are more cost-effective, less time-consuming, and more ecofriendly than the steel pipes (SPs) and pre-stressed highstrength (PHC) piles. However, one of the limiting conditions is that they have to be installed below the groundwater level to prevent decay. Since the groundwater levels are generally high in the reclaimed lands in Korea, wood piles are expected to be used often as reinforcements for foundations of greenhouses in these areas. In this study, we measured the uplift capacities of wood piles through in-situ uplift capacity tests with an aim to provide basic design data for wood pile foundations. In order to test their applicability, we then compared these experimentally measured ultimate uplift capacities with the ones calculated through some of the existing theoretical equations. The wood piles used in the loading tests were made of softwood (pine wood), and the tests were performed using piles with different diameters (∅25cm and ∅30cm) and embedded depths (1m, 3m, and 5m). The test results revealed that the uplift capacity of the wood piles showed a clear linearly increasing tendency in proportion to the embedded depth, with the ultimate uplift capacities for the diameters 25cm and 30cm being 9.38 and 10.56tf, respectively, at the embedded depth of 5m; thus demonstrating uplift capacities of ${\geq}9tf$. The comparison between the actually measured values of the uplift capacity and the ones calculated through equations revealed that the latter, which were obtained using the ${\alpha}$ method, were generally in an approximate agreement with the in-situ measured values.

Extraction of Landmarks Using Building Attribute Data for Pedestrian Navigation Service (보행자 내비게이션 서비스를 위한 건물 속성정보를 이용한 랜드마크 추출)

  • Kim, Jinhyeong;Kim, Jiyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.203-215
    • /
    • 2017
  • Recently, interest in Pedestrian Navigation Service (PNS) is being increased due to the diffusion of smart phone and the improvement of location determination technology and it is efficient to use landmarks in route guidance for pedestrians due to the characteristics of pedestrians' movement and success rate of path finding. Accordingly, researches on extracting landmarks have been progressed. However, preceding researches have a limit that they only considered the difference between buildings and did not consider visual attention of maps in display of PNS. This study improves this problem by defining building attributes as local variable and global variable. Local variables reflect the saliency of buildings by representing the difference between buildings and global variables reflects the visual attention by representing the inherent characteristics of buildings. Also, this study considers the connectivity of network and solves the overlapping problem of landmark candidate groups by network voronoi diagram. To extract landmarks, we defined building attribute data based on preceding researches. Next, we selected a choice point for pedestrians in pedestrian network data, and determined landmark candidate groups at each choice point. Building attribute data were calculated in the extracted landmark candidate groups and finally landmarks were extracted by principal component analysis. We applied the proposed method to a part of Gwanak-gu, Seoul and this study evaluated the extracted landmarks by making a comparison with labels and landmarks used by portal sites such as the NAVER and the DAUM. In conclusion, 132 landmarks (60.3%) among 219 landmarks of the NAVER and the DAUM were extracted by the proposed method and we confirmed that 228 landmarks which there are not labels or landmarks in the NAVER and the DAUM were helpful to determine a change of direction in path finding of local level.

A Study on the Establishment of Optimal Transportation Networks in Busan New Port (부산항 신항 최적의 교통망 수립에 관한 연구)

  • Park, Ho-Kyo;Choi, Yang-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.125-132
    • /
    • 2017
  • The development project of Busan New Port aims to be Logistics Hub Port but there are too many things to deal with ; enlargement of harbour, interport competition, modernization of harbour loading equipment and so on. At present, 23 berths of North and South container quay are in operation and 22 berths will be constructed on west and south-side by 2020. Namely, Busan New Port will operate 45 berths in 2020. When it comes to port distripark, a large-scale of Port distripark project is underway, such as Ung-Dong district 1,2 phase, West container 1,2phase, North distripark and so on. This study is to deduce traffic system problem of Busan New Port which is caused by the development project through predicting traffic need considering the development project. According to study, there are three main problems of traffic system : 1. traffic congestion caused on main crossroad, connecting second harbour back road. 2. It has been predicted that South-North road and traffic capacity of New Port road would lack compared to traffic volume-to-be-increased. Moreover, the detour volume of traffic is caused because New Port's 1st avenue and route 2 were not connected directly. Thus, this study suggests three kinds of improvement plan for smoother traffic flow. 1st. Operate roundabout on major intersection, for example, second harbour back road, west container wharf's subway corridors(South to North), and permit only right turn on sub-intersection. 2nd. Extend New Port road(North container's port road) by utilizing side walk and median. 3rd. Install exit ramp which utilizes Route 2 connecting New Port's 1st avenue and local road 1042. The method we used to analyze the effect of improvement is Vissim of Mircro Simulation Package.

Management Plan for Humanistic and Ecological Characteristics of Suweol Village Forest in Tongyoung (통영 수월숲의 인문학적 특성 및 생태적 특성을 고려한 관리방안)

  • Lim, Eui-Jea;Lee, Soo-Dong;Kim, Mi-Jeong
    • Korean Journal of Environment and Ecology
    • /
    • v.27 no.1
    • /
    • pp.85-98
    • /
    • 2013
  • In order to propose effective conservation management plan, this study verified ecological characteristics, humanities and Social characteristics. The research site is private property which is owned belonging to the Kim's of Gimhae that have long history. The study site is more than a thousand years old and was created for protecting from typhoon. There held the religious ritual what is called Dongsinje until 1960s. There have been protected and managed by the villagers. As the results of analysis, the area of windbreak are $12,392.69m^2$. The windbreak is dominated old years deciduous broad-leaved tree such as Zelkova serrata, Celtis sinensis, Aphananthe aspera. Around there were farmlands(52.1%), urbanized area(26.3%), forest area(16.6%). The vegetation communities of windbreak were classified by considering the dominant species and current status of forest. The forest types are following as; A. aspera community(I) which is using less pressure, Platycarya strobilacea-Carpinus coreana-Z. serrata community(II). Z. serrata community(III) which is using high pressure, Z. serrata-A. aspera community(IV), Z. serrata community(V) which is damaged under canopy trees. The windbreak was in good condition whereas, there were concerns the some wrong status was being undermined such as the wrong forest restoration projects in the past, the trails that is penetrating inside the forest, building up education facilities. Therefore, in order to restore the value of windbreak what is so called Suwol forest, we should improve the problems of forest ecosystem such as wrong management, forest fragmentation by facilities and decline in forest by lack of growing the next generation trees. In addition, we should remove excessive resting facilities and lead to passive use of forest. to improve the way of wrong management, moreover, we should close off he trails that is penetrating inside the forest for improving fragmentation. We should restore vegetation restoration and fostering the next generation trees for forest ecosystem. In order to restore unique of histo-cultural and ecological forest landscape, the next generation trees should be grown up that is the dominant species in Suwol forest. Moreover, as a results of comparing the between good vegetation communities and damaged vegetation communities, it is necessary to complementary planting for demeged vegetation communities, therefore there needs to 10.8 under canopy trees, 79.7 shrubs.

Derivation of rock parameters from Televiewer data (텔레뷰어에 의한 토목설계 매개변수의 산출)

  • Kim Jung-Yul;Kim Yoo-Sung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.137-155
    • /
    • 1999
  • Recently, Televiewer(Borehole Acoustic Scanner(Televiewer)) has come to be widely used specially for the general engineering construction design. The Televiewer tool using a focussed acoustic beam is to detect the amplitude and traveltime of each reflected acoustic signal at the wall, resulting in the amplitude- and traveltime image respectively. Fractures can be well detected, because they easily scatter the acoustic energy due to the highly narrow beam. In addition, the drilling work will rough the borehole wall so that the acoustic energy can be scattered simply due to the roughness of the wall. Thus, the amplitude level can be directed associated with the elastic properties(impedance) and the hardness of the rock as well. Meanwhile, the traveltime image provides an information about the borehole shape and can be converted to a high precision 3D caliper log(max. 288 arms). In this paper, based on the high resolution of Televiewer images, general evaluation methods are illustrated to derive very reliable rock parameters.

  • PDF

A study on ecological reprocessing and creation of biotope by reuse of treated waste water and nonpoint pollution source of stream (하수처리수와 하천 비점오염원을 이용한 생태적 재처리 효과와 생물 서식처 창출 방안 - 왕포천 생태적수질정화비오톱(Sustainable Structured wetland Biotop) 시스템 사례를 중심으로 -)

  • Byeon, ChanWoo;Lee, JongnChan
    • Journal of Wetlands Research
    • /
    • v.21 no.4
    • /
    • pp.374-383
    • /
    • 2019
  • The Wangpo stream located in the Buyeo-gun was a small stream with both low water quality and quantity due to the cultivated land and settlement area through the stream. In order to restore ecosystem, the Sustainable Structured wetland Biotop system was applied to treat 1,500 to 7,000 ㎥/d amount of effluent water pumped from the Buyeo sewage treatment plant facility as well as inflowed from nonpoint pollution source of Wangpo stream. As a result of continuous monitoring for 2 years from 2016 to 2018 after completing restorative construction, the average BOD5 as an index of organic pollution was 7.3 mg/L and the average effluent concentration became 2.1 mg/L, showing an improvement by 71.2%. The average inflow concentration of T-N was 7.953 mg/L and the average outflow concentration was 3.379 mg/L, showing 57.5% of improvement. The average inflow concentration of T-P was 0.177 mg/L and the average outflow concentration was 0.052 mg/L, showing about 70.7% improvement. The results of ecological monitoring after creating biotope by reuse of treated waste water and nonpoint pollution source of the Wangpo Stream are as follows. The plant taxa founded in water SSB(Sustainable Structured wetland Biotop) system of the Wangpo Stream was total 41 species in 21 families, showing a higher proportion of naturally introduced plant than that of artificially planted species. In case of other terrestrial animals, both amphibian and reptile group were confirmed as 3 species in 6 families, avian group was 25 species of 15 families, and mammal group observed 5 species in 5 families, respectively. All species have been created and enhanced through purified water inhabited in the SSB(Sustainable Structured wetland Biotop) system as a treatment wetland, eventually migrating to the Wangpo Stream.

Development of a Integrated Indicator System for Evaluating the State of Watershed Management in the Context of River Basin Management Using Factor Analysis (요인분석을 이용한 수계 관리 맥락에서 유역관리 상태를 평가하기 위한 통합지수 개발)

  • Kang, Min-Goo;Lee, Kwang-Man;Ko, Ick-Hwan;Jeong, Chan-Yong
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.3
    • /
    • pp.277-291
    • /
    • 2008
  • In order to carry out river basin management, it is necessary to evaluate the state of the river basin and make site-specific measures on the basis of management goals and objectives. A river basin is divided into several watersheds, which are composed of several components: water resources, social and economic systems, law and institution, user, land, ecosystems, etc. They are connected among them and form network holistically. In this study, a methodology for evaluating watershed management was developed by consideration of the various features of a watershed system. This methodology employed factor analysis to develop sub-indexes for evaluating water use management, environment and ecosystem management, and flood management in a watershed. To do this, first, the related data were gathered and classified into six groups that are the components of watershed systems. Second, in all sub-indexes, preliminary tests such as KMO (Kaiser-Meyer-Olkin) measure of sampling adequacy and Bartlett's test of sphericity were conducted to check the data's acceptability to factor analysis, respectively. Third, variables related to each sub-index were grouped into three factors by consideration of statistic characteristics, respectively. These factors became indicators and were named, taking into account the relationship and the characteristics of included variables. In order to check the study results, the computed factor loadings of each variable were reviewed, and correlation analysis among factor scores was fulfilled. It was revealed that each factor score of factors in a sub-index was not correlated, and grouping variables by factor analysis was appropriate. And, it was thought that this indicator system would be applied effectively to evaluating the states of watershed management.

A Reinvestigation on Key Issues Associated with the Yimjin(1712) Boundary Making and Demarcation: Location of 'Yipjiamlyu' and the Confluence of 'Tomungangweon' into the Sungari River (임진정계시 '입지암류(入地暗流)'의 위치와 '토문강원(土門江源)'의 송화강 유입 여부)

  • Lee, Kang-Won
    • Journal of the Korean Geographical Society
    • /
    • v.50 no.6
    • /
    • pp.571-605
    • /
    • 2015
  • This research revealed that 'Yipjiamlyu' in the Mukedeng's map is geographically 'a beginning point of underf low,' whose location is on the Heishigou's riverbed(E.L. 1,840m) in the NNE side of Daegakbong peak, and that 'Tomungangweon'(Heishigou) is one of the upstream reach of the Sungari River, which, according to historical documents and my fieldwork, Mukedeng also knew at the time of Yimjin(1712) Boundary Making and Demarcation(YBMD). These findings suggest the need to reinterpret the processes of YBMD. Mukedeng set up the Baekdusanjeonggyeobi on the mistaken assumptions on the linkage of 'Yipjiamlyu' and Tumen River. It should have been set up on the Daeyeonjibong peak. Mukedeng found the 'Yipjiamlyu' on the riverbed of 'Tomungangweon'(Heishigou), went downstream, and realized that this river did not flow into the Tumen River. During the search for the source of Tumen River, he found a water stream, and regarded it as the source of Tumen River. He speculated that the water at the 'Yipjiamlyu' flows through the underground to reappear at the his 'identified' source of Tumen River. Consequently, he adjured the construction of demarcation from Baekdusanjeonggyeobi through 'Yipjiamlyu' to the his 'identified' source of Tumen River. The water stream pointed as the source of Tumen River, however, was not part of the upstream reach of Tumen River. Actually, Korean officials, who were in charge of establishing boundary features, set up the demarcation from Baekdusanjeonggyeobi through Huanghuasongdianzi to the true source of Tumen River identified by themselves, which Mukedeng had not intended. The ambiguity of the location of 'Yipjiamlyu' caused a difference between Mukedeng's original request and Korean officials' implementation in the boundary demarcation. Throughout the whole processes of YBMD, Korea(Joseon) and China(Qing) both mistook the real geography of the river system. Their understanding on Yalu River system was correct. But the identification of the spring source of the Tumen River by Korean participants was the only geographically correct result related on this river system in YBMD.

  • PDF

Experiment of Flexural Behavior of Composite Beam with Steel Fiber Reinforced Ultra High Performance Concrete Deck and Inverted-T Steel Girder (강섬유로 보강된 초고성능 콘크리트 바닥판과 역T형 강거더 합성보의 휨거동 실험)

  • Yoo, Sung-Won;Ahn, Young-Sun;Cha, Yeong-Dal;Joh, Chang-Bin
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.6
    • /
    • pp.761-769
    • /
    • 2014
  • Ultra high performance concrete (UHPC) has been developed to overcome the low strengths and brittleness of conventional concrete. Considering that UHPC, owing to its composition and the use of steel fibers, develops a compressive strength of 180 MPa as well as high stiffness, the top flange of the steel girder may be superfluous in the composite beam combining a slab made of UHPC and the steel girder. In such composite beam, the steel girder takes the form of an inverted-T shaped structure without top flange in which the studs needed for the composition of the steel girder with the UHPC slab are disposed in the web of the steel girder. This study investigates experimentally and analytically the flexural behavior of this new type of composite beam to propose details like stud spacing and slab thickness for further design recommendations. To that goal, eight composite beams with varying stud spacing and slab thickness were fabricated and tested. The test results indicated that stud spacing running from 100 mm to 2 to 3 times the slab thickness can be recommended. In view of the relative characteristic slip limit of Eurocode-4, the results showed that the composite beam developed ductile behavior. Moreover, except for the members with thin slab and large stud spacing, most of the specimens exhibited results different to those predicted by AASHTO LRFD and Eurocode-4 because of the high performance developed by UHPC.