Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Evaluation of Building Construction Management in Sylhet City, Bangladesh

  • Anamul, Hasan Md.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.40-47
    • /
    • 2012
  • Construction management is essential for a achieving any pre-determined objective. It is however seen that in spite of construction management, majority of the project do not keep up their original time schedule and their completion cost is also higher as compared with the estimated cost The main reason for overrun in time and cost is that the planning at the outset of the project was not adequate or method of planning was not a refined one. In this research work, I showed the overall conditions of construction work and management in Sylhet city of Bangladesh and found many drawbacks in the construction management after completing my research. I found several factors affecting proper construction management and I have provided brief results. I have also provided some recommendations after my research work.

CONFIGURATION METHOD OF HEALTH & SAFETY RULE FOR IMPROVING PRODUCTIVITY IN CONSTRUCTION SPACE BY MULTI-DIMENSION CAD SYSTEM

  • Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1161-1165
    • /
    • 2009
  • Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.

  • PDF

Analyzing Defects Types and Causes of Activities in Information and Communication Works Based on Investigation (정보통신공사 하자관리 실태조사를 통한 세부 공종별 하자 유형 및 원인 분석)

  • Eom, Yong-Been;Sohn, Sung-Geun;Kang, Sang-Hun;Park, Hyun Jung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.269-270
    • /
    • 2021
  • As the era of the Fourth Industrial Revolution arrives and the culture of contact-less was established due to the long-term COVID-19, the construction industry is striving to develop smart home services to expand the scope of information and communications technology (ICT) to provide convenience to residents. However, various defects are occurring in information and communications technology facilities in apartments, and related research is lacking. In this study, case studies and research methods of related prior studies are analyzed as a basis for identifying the types and causes of defects that occur in information and communications technology facilities. To analyze various studies, we divided them into studies on smart home Internet of Things (IoT), information and communications technology construction of apartments, and investigated their features and limitations. Plus, future research will be conducted on apartments within 10 years of completion among apartments completed by domestic construction companies to supplement the limitations of prior research. In addition, we will prepare basic data on defects of ICT construction by analyzing the major causes of defect types through the analysis of defect types and frequency by detailed work type of information and communications technology construction.

  • PDF

The Productivity and Importance Factors of Workers in Construction Site (국내 건설근로자의 생산성 관련 중요 요인 도출 및 중요도 조사)

  • Jung, Young-Chul;Moon, Joon-ho;Kim, Jin-Dong;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.73-74
    • /
    • 2011
  • Compared to the other industries, construction industry depends many parts of production activities on manpower. And also 3D perception on construction industry and the shortage of motivation in construction workers are the biggest reason to reduce construction productivity. So to solve this problem, the research of factors which affect more to improve the construction workers attitude in construction site will be needed. This research has investigated that the productivity and important factors was divided to economic factors, social factors, psychological factors. The result show that economic factors remain pre-eminent in influencing productivity, but that social factors and psychological factors appear to be of increasing importance in this construction industry.

  • PDF

A Development direction of the building structural system based on the 3D virtual construction (3차원 가상건설기반 건축구조시스템의 개발방향)

  • Shin, Tae-Song;Cho, Young-Sang;Cheon, Jin-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.346-351
    • /
    • 2007
  • As the construction technology is rapidly advancing internationally, the necessity of virtual construction technology development is drastically demanded in the construction industry together with a fusion technology with information technology(IT). The construction technology will be changed as the paradigm of construction technology in the future. The establishment of building structural system in the virtual construction basis is necessary for the integration of construction process, and it will be expected to produce the effect of reduction of construction period and quality improvement through the environment of integration. This study is to present the analysis of the existing process of structural design, the content of research & development as per the building structural system on virtual construction basis and the direction of research.

  • PDF

Research of Circuit Working Construction Elevator with Single-guide Rail and Multi-cages

  • Kun Zhang;Kaiqiang Wang;Di Li;Qing Sun;Zhen Ye;Wei Liu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.137-144
    • /
    • 2022
  • As one of the most important vertical transportation equipment in super high-rise buildings, the construction elevator directly affects the project period, cost, and effectiveness. The paper proposes a new construction elevator with single-guide rail and multi-cages. It can solve the problems of single construction elevator capacity shortage and efficacy decrease with height reduction, the occupancy of plan and elevation position of multiple construction elevators, and extension of total construction period by cycling operation of multi-cages on a single-guide rail. The paper focuses on the design and research of the main components of the equipment, such as the rotating guide rail mechanism, vertical bearing mast tie system, segmented electrical power supply system, group control scheduling system, and safety anti-collision system.