• 제목/요약/키워드: construction regulations

검색결과 757건 처리시간 0.032초

A Study of the China Construction Laws and BOT Policies from Overseas EPC Contractor's View (중국 건설 법률과 BOT 정책에 대한 조사 연구;해외 EPC 건설업체의 관점)

  • Choi, Jae-Ho;Park, K.R.;Yun, H.J.
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.519-522
    • /
    • 2007
  • China infrastructure construction market has huge potential for increased use of PPP/BOT mode and one of the most attractive markets of doing business. However, there are still a multitude of challenges for overseas EPC contractor to enter into the China PPP/BOT market both internally and externally. Especially, the construction legal system and relevant policies are considered at present the biggest barriers in accessing China construction market. Therefore, the main purpose of the paper is to identify the impact of the construction laws, regulations and BOT-related policies on the viability of foreign contractor-led BOT project in China. To the satisfaction of the purpose, this paper will first analyze China construction laws based on the key issues that must be tackled by foreign EPC contractor before they enter into China. This summary gives the possible contract scheme for a BOT project of interest in which foreign contractors could define the scope of works and measure the viability of the project. Finally, a case study of wastewater treatment plant BOT project in China subsequently illustrates some of the lessons learned from the foreign contractor's perspectives for successfully participating in future environmental market in China.

  • PDF

A Study on Improvement of Contract Regulations for Adjusting Contract Amount in Public Construction - Focused on examples of price fluctuation classification - (공공건설 계약금액 조정의 계약예규 개선방안 연구 - 물가변동 분류 사례 중심으로 -)

  • Lee, Wonjei;Shin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • 제21권4호
    • /
    • pp.82-89
    • /
    • 2020
  • Article 64 of the Enforcement Decree of the National Contract Act The requirement of the pre-amendment statute related to the adjustment of the contract price was 5% or more of the price fluctuation rate from the date of the contract. However, the meeting requirement was changed from 5% or more to 3% or more from the date of signing of the Presidential Decree No. 19035 to 2005. 9. 8. The method of adjusting the contract amount was also changed to determine the contractor's desired adjustment method at the time of contract. Alleviating these requirements and revising the empowerment of contract partners is intended to prevent difficulties in achieving smooth objectives by applying to public construction contractors without unfairly benefiting or unfavorable to contract partners. Even if the standards are relaxed and the rights are secured as described above, if the existing provisions for the adjustment of price fluctuation are applied, unlike the original purpose of the government system, the Korea Bank's price economic statistics classification method and the contract construction classification criteria applied in public construction work Due to the inconsistency, it can be seen that the amount of adjustment for price fluctuation by construction type is excessive and underestimated. Therefore, the purpose of this study is to analyze problems through cases and to make appropriate construction cost adjustment through improvement measures.

A Study on the Development of the Guidelines for Supervision and Inspection of Earthworks Quantity Using 3D Scanning Technology (3D 스캐닝 기술을 이용한 토공사 기성관리 감독 및 검사 가이드라인 개발)

  • Lee, Young-ho;Yun, Won Gun;Park, Jae-woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • 제23권5호
    • /
    • pp.735-746
    • /
    • 2020
  • Recently, in Korea, various technology developments have been made to utilize 3D space and facility data such as unmanned aerial vehicles (UAV) and laser scanners with the goal of improving productivity at construction sites. However, the lack of related regulations for 3D laser scanner surveying has been a barrier to using the technology across the surveying industry. As a result, owners, contractors, and construction supervisors are reluctant to introduce and apply technology to the site. In this study, the guidelines (drafting and inspection work to be supervised by construction supervisors when constructing earthworks using laser scanners) was developed and presented so that the earth surveying and quantity calculation technology using a laser scanner could be applied and diffused in a construction site. Through the development of this guideline (proposal), it is judged that the supervision and inspection of earthworks quantity using a laser scanner will be activated in the field.

Development of Air-Environment management guideline in Building construction process (건설사업추진단계에서의 대기환경 관리지침 개발에 관한 연구 - 군 건설사업 중심으로 -)

  • Na Duk-So;Suh Sang-Wook;Lee Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.376-379
    • /
    • 2004
  • Building construction Is essential part that we get the enjoyment and promote the quality in human life. But construction process itself has an bad effect on environment: air Pollution, water Pollution, soil Pollution ,etc. These day, Air-environment management becomes very important part in Construction because Construction duration delay which is caused by civil petitions related air-environment occurs frequently. For developing the management-guideline of environment management, This study suggests an executive management-guideline based on surveying air-environmental related laws, regulations and literatures, making out important factors. With the management guideline, The Purpose of this study is to make an air-environmental management system through that Process.

  • PDF

Research of the reduction measures for fall accident death in small scale construction sites. - On the Basis of work plate and scaffolding - (소규모 건설현장 떨어짐 사망재해 저감방안 연구 - 비계 및 작업발판 중심 -)

  • Yoo, Hyun-Dong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • 제16권3호
    • /
    • pp.55-62
    • /
    • 2014
  • During five years (Year 2009~2013), Total victims of 72 %(81,560 people) and those 50.6 %(1,258 people) of death accident occurs in small scale construction site which operate 2 million USD less construction budget. Especially, falling death accident account for 785 people, in the share of 33.2 %(261 people) death disaster takes due to defect of original cause materials. The major safety issues in small scale work place take place while scaffold installation, disassembling, work-plate improper installation or non-professional skills of workers. Furthermore, labor subcontract systems make small construction site shortage of resources. Those workers regard work-plate as unnecessary and consumables supplies. Because of that most of workers use unsafe workplace in most construction site. Therefore, in order to prevent falling accident occurring in small scale work site, government should organize related regulations such as "Work site safety construction method" and then expands education support, financial aid, and sourcing safety supplies for work plate which offer broad variety experiences. Also, introduce certificate solutions for various work plates to improve safety function such as anchoring type method and anti sliding function.

Electrical Properties of 6.6kV Cable Termination by Mechanical Damage (기계적 손상에 따른 6.6kV케이블 종단부의 전기적 특성)

  • Baek, Seung-Myeong;Choi, JIn-Wook;Kim, Sang-Hyun;Kim, Young-Seok
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.1299_1300
    • /
    • 2009
  • We show results that examine about electrical properties of XLPE insulated 6.6kV cable termination by mechanical damage. The cable used to produce the cable termination is 6/10kV tray XLPE fire retardant electric cable (6/10kV TFR-CV $35SQMM{\times}1C$) which is domestically made. We apply force to XLPE insulator and made mechanical defect using knife. Defected samples go through the withstand voltage test according to the IEEE std. 48 test regulations and lighting impulse (hereunder, IMP) withstand voltage test regulations. Then the effects of the scars shown during the construction process on electric accidents at the end part are analyzed.

  • PDF

A study on the information protection to prepare for the change of EC environment (EC 환경변화에 대응하기 위한 정보보호에 관한 연구)

  • 신영균
    • Journal of the Korea Computer Industry Society
    • /
    • 제3권12호
    • /
    • pp.1691-1696
    • /
    • 2002
  • The major factors for the information protection to prepare for the change of the EC environment are found to be the construction of internet cyber-mall, the consumer-protecting regulations and the private information and system security regulations. The standards and methods of the their judgement is also important factors and are believed to attract the consumers' interest about the assessment of the internet cyber-mall and eventually serve the rights and interests of the consumers. The technology-level for the business transaction, the research and development of its technology and putting it into practical use are also found to be significant factors.

  • PDF

A Case Study on PL Management in Small and Medium-Sized Firms of Gangwon-Do Province (강원도 중소기업의 제조물책임법 대책에 대한 연구)

  • Park, Roh-Gook;Lee, Sung-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • 제10권3호
    • /
    • pp.99-107
    • /
    • 2008
  • Product liability(PL) is the producer's compensation to customers for damage incurred by product defects. This paper studies on the organizational culture, promotion process, system construction, system level, product safety review, product safety assurance, system operation, and its effectiveness and necessity of recognition for the PL system of small and medium-sized firms in Gangwon-Do province. The results show that the firms have product safety regulations, but the number of firms which its employees understand the regulations is less than the number of firms which do not understand. Also the number of firms which is preparing PL prevention and insurance, and counterplan for accidents seems to be not in large numbers.

Consideration of second intact stability criteria (2세대 비손상 복원성 기준에 대한 고찰)

  • Park, Kwang-soo;Park, Han-chae;Lee, Chul-ho
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 대한조선학회 2017년도 특별논문집
    • /
    • pp.19-27
    • /
    • 2017
  • In spite of adoption of Intact Stability Code Part A as mandatory, the accidents have been occurred frequently caused by dynamic stability. Therefore International Maritime Organization (IMO) is revising the Intact Stability Code to prevent the cause of accidents. The result of 4th meeting of Sub-committee on Ship Design and Construction (SDC), five mode of the cause was defined and establishing each draft regulations. We consider physical background, mathematical description, draft regulations for five failure mode and sample calculations for ships built by STX Offshore & Shipbuilding.

  • PDF

Trends in Standards and Regulations on Hand-arm Vibration (수완계 진동에 대한 규격제정 동향)

  • 장한기
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 한국소음진동공학회 2002년도 춘계학술대회논문집
    • /
    • pp.899-902
    • /
    • 2002
  • Effect of hand-transmitted vibration on human discomfort and health was reviewed. Since the effect by hand tool was more serious than those by any other vibration environments, western countries have protected hand tool workers by regulations. International organization for standardization legislate standard, ISO 5349, at 1979 for the measurement and evaluation of the effect. Afterwards, more than twenty standards on hand-arm vibration were enacted to Protect any damage of hand tool users. Even though Korea Standards adopted ISO 5349 in 2001, it is required an action plan should be applied to all of work environments, especially to the workers using pneumatic tool workwers such as miners, construction workers, and etc.

  • PDF