EXPLORATORY STUDY OF LEAN CONSTRUCTION: ASSESSMENT OF LEAN IMPLEMENTATION

  • Joo-Hyun Park;Dae-Young Kim;Hak-Ki Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1212-1215
    • /
    • 2005
  • Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, several construction companies in the USA are starting to implement lean construction with nebulous hopes of obtaining better results from their current projects than from past projects not employing lean construction. There are many difficulties in adopting lean concepts and systems into construction projects and implementing lean construction in real construction sites. Thus, there are demands to share information how other companies implement lean construction, to identify the benefits and barriers of lean implementation in the construction fields, and finally to improve their lean implementation. This study was the first exploratory study to assess lean construction implementation on overall projects. The case studies carried out the examination of the mutual relationships of lean planning systems, organization structure, attitudes of project participants and company strategy which played major influences on successful lean implementation

  • PDF

Analysis of Delay Causation by Characteristics of Construction Projects (건설사업 특성에 따른 공기연장사유 분석)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.78-86
    • /
    • 2007
  • Top priority to manage construction projects is given to the planning and scheduling in order to keep the project duration, which is one of the most important factors in construction management. However, recently most of public construction projects especially for civil projects are delays and preventive research, many efforts were made concerning construction delays and preventive management methods. But analysis of delay causation, which is a main key to solve the problems is not done, yet. Therefore, in this research causation delays are analyzed by characteristics of construction projects, which are type of projects, type of contracts, project participants, and general condition. As a result of the analysis, delay causation are proved to be different by characteristics of the projects. The research results will be used for prevention of time extension and dispute resolution.

FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.1-12
    • /
    • 2017
  • India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

Project Learning Enablers within Fragmented Construction Projects

  • Alashwal, Ali Mohammed
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.588-592
    • /
    • 2015
  • Many studies have affirmed a negative influence of fragmentation on learning and knowledge sharing in construction projects. However, the literature overlooked enablers of learning within this context. The purpose of this paper is to explore the factors that facilitate project learning and ways to negate any unbecoming effects of fragmentation. Qualitative study used to explore the enablers through interviews administered to 11 top management individuals working in different construction projects in Malaysia. The findings revealed the following factors: participation, relationships, togetherness, and roles of project leader and coordinator. The role of boundary objects was also highlighted including information technology (IT), contract and procedures, drawings, specifications, and reports. The outcome of this paper initiates the development of a model for better knowledge creation and sharing in construction projects. The significance of this model stems from its ability to connection both the characteristics of construction project and project learning theories using the enablers. It is envisaged that future work will be to confirm the model in a quantitative study.

  • PDF

Economic Evaluation of National Highway Construction Projects using Real Option Pricing Models (실물옵션 가치평가모형을 이용한 국도건설사업의 경제적 가치 평가)

  • Jeong, Seong-Yun;Kim, Ji-Pyo
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.75-89
    • /
    • 2014
  • PURPOSES : This study evaluates the economic value of national highway construction projects using Real Option Pricing Models. METHODS : We identified the option premium for uncertainties associated with flexibilities according to the future's change in national highway construction projects. In order to evaluate value of future's underlying asset, we calculated the volatility of the unit price per year for benefit estimation such as VOTS, VOCS, VICS, VOPCS and VONCS that the "Transportation Facility Investment Evaluation Guidelines" presented. RESULTS : We evaluated the option premium of underlying asset through a case study of the actual national highway construction projects using ROPM. And in order to predict the changes in the option value of the future's underlying asset, we evaluated the changes of option premium for future's uncertainties by the defer of the start of construction work, the contract of project scale, and the abandon of project during pre-land compensation stages that were occurred frequently in the highway construction projects. Finally we analyzed the sensitivity of the underlying asset using volatility, risk free rate and expiration date of option. CONCLUSIONS : We concluded that a highway construction project has economic value even though static NPV had a negative(-) value because of the sum of the existing static NPV and the option premium for the future's uncertainties associated with flexibilities.

Evaluating Sustainability Rating System for California Infrastructure Construction Projects

  • McCarthy, Patricia;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.984-991
    • /
    • 2022
  • The use of the sustainability rating systems in infrastructure construction projects is not as common in comparison to building construction projects. While the sustainability rating systems share some commonalities, they differ from one another in certain ways. Thus, project teams cannot make reliable decisions when choosing the best sustainability rating tools for a given infrastructure projects. The Department of Transportation (DOT) in several states are developing its own rating system to address the infrastructure sustainability, but not in the case of California. Therefore, this paper presents the statistical results on the important sustainability determinants that affects the success of meeting sustainability goals of infrastructure construction projects. The authors conducted an online survey using the structured questionnaires. The categories considered include site, water/wastewater, energy, materials/resources, environmental, and others. The statistical analyses such as Kruskal-Wallis and ANOVA are conducted using a total of 25 valid and complete data out of 59 surveys collected. The results demonstrate several factors under each of six major sustainable categories have received higher ranks than other factors. The results also show that a statistically significant difference can be found from water, energy, and environmental categories against the other category based on the pairwise comparisons.

  • PDF

Key success factors for implementing modular integrated construction projects - A literature mining approach

  • Wuni, Ibrahim Yahaya;Shen, Geoffrey Qiping
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.343-352
    • /
    • 2020
  • Modular integrated construction (MiC) is an innovative construction method where components of a building are manufactured in an offsite factory, trucked to the job site in sections, set in place with cranes, and assembled together to form a whole building. Where circumstances merit, favorable conditions exist and implemented effectively; MiC improves project performance. However, several key factors need to converge during implementation to realize the full benefits of MiC. Thus, a thorough understanding of the factors which are critical to the success of MiC projects is imperative. Drawing on a systematic review of 47 empirical studies, this research identified 25 key success factors (KSFs) for MiC projects. Of these, the five topmost cited KSFs for MiC projects include effective working collaboration and communication among project participants; standardization, optimization, automation and benchmarking of best practices; effective supply chain management; early design freeze and completion; and efficient procurement method and contracting. The study further proposed a conceptual model of the KSFs, highlighting the interdependences of people, processes, and technology-related KSFs for the effective accomplishment of MiC projects. The set of KSFs is practically relevant as they constitute a checklist of items for management to address and deal with during the planning and execution of MiC projects. They also provide a useful basis for future empirical studies tailored towards measuring the performance and success of MiC projects. MiC project participants and stakeholders will find this research useful in reducing failure risks and achieving more desired performance outcomes. One potential impact of the study is that it may inform, guide, and improve the successful implementation of MiC projects in the construction industry. However, the rigor of the analysis and relative importance ranking of the KSFs were limited due to the absence of data.

  • PDF

A QUALITATIVE SURVEY ON SUCCESS FOR MAINTENANCE PROJECTS

  • Albert P C Chan;Daniel W M Chan;Edmond W M Lam
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.186-195
    • /
    • 2007
  • Key Performance Indicators (KPIs) are the criteria of measuring project performance in order to attain construction excellence. Previous researchers have examined the abstract concept of success for general new construction and identified its relationship with the factors of success. In fact, most buildings exist to satisfy the needs of people. With the passing of time and change in technology, buildings have to be maintained and renovated in order to continue functioning properly for the benefits of users. Therefore, criteria and factors of success have increasingly attracted the attention of both researchers and practitioners, especially in cities where buildings become ageing. However, the topic of project success for maintenance projects is less discussed in previous research, and project participants, including maintenance surveyors should be able to identify the success measurement and its associated factors for performance improvement. This study fills the research gap by investigating the criteria and factors of success for maintenance projects. It first provides a summary of the literature review on the criteria and factors of success for construction projects. An empirical study has also been carried out with ten practitioners in Hong Kong to further identify the criteria and factors critical for the success of maintenance projects in practice. While most criteria and factors of success for new construction projects are also applicable to maintenance projects, participants in maintenance projects believe that effective communication is in particular important to provide quality service to the end-users.

  • PDF

Investigation on the Manpower Staffing Plan Utiling Density Analysis Method (밀도분석에 의한 공동주택 현장관리 인력 배치계획 분석)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Choi, Jae-Hwi;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.119-123
    • /
    • 2010
  • Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF