• Title/Summary/Keyword: construction projects

Search Result 3,205, Processing Time 0.027 seconds

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Probabilistic Risk Assessment for Construction Projects (건설공사의 확률적 위험도분석평가)

  • 조효남;임종권;김광섭
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1997.10a
    • /
    • pp.24-31
    • /
    • 1997
  • Recently, in Korea, demand for establishment of systematic risk assessment techniques for construction projects has increased, especially after the large construction failures occurred during construction such as New Haengju Bridge construction projects, subway construction projects, gas explosion accidents etc. Most of existing risk analysis modeling techniques such as Event Tree Analysis and Fault Tree Analysis may not be available for realistic risk assessment of construction projects because it is very complex and difficult to estimate occurrence frequency and failure probability precisely due to a lack of data related to the various risks inherent in construction projects like natural disasters, financial and economic risks, political risks, environmental risks as well as design and construction-related risks. Therefor the main objective of this paper is to suggest systematic probabilistic risk assessment model and demonstrate an approach for probabilistic risk assessment using advanced Event Tree Analysis introducing Fuzzy set theory concepts. It may be stated that the Fuzzy Event Tree AnaIysis may be very usefu1 for the systematic and rational risk assessment for real constructions problems because the approach is able to effectively deal with all the related construction risks in terms of the linguistic variables that incorporate systematically expert's experiences and subjective judgement.

  • PDF

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

Correlation Analysis between Safety Education and Human Error by Construction Workers (안전교육과 건설근로자 휴먼에러 상관관계 분석)

  • An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.343-349
    • /
    • 2014
  • The construction projects are larger and more complex, and so the construction accidents are bigger. Recently, the studies for reducing the human errors are researched to decrease the construction accidents. The purpose of this study is to analysis a correlation between the safety education and human errors by construction workers. The results showed that the frequencies of safety education in large sized construction projects are more than these in small sized construction projects. However, all of construction projects conduct lower times of safety education than the regulated times. In addition, it is revealed that the human errors of construction workers in large sized construction projects are being lower in accordance with increasing the safety education times. In small sized construction projects, however, the human errors of construction workers are increasing according to more times of safety education, reversely. This study should help to reduce the accidents in construction projects.

THE SUCCESS FACTORS OF PARTNERING IN THE SOUTH KOREA PM&CM MARKET

  • Bok-Nam Lee;Hyoun-Seung Jang;Seok-In Choi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.737-743
    • /
    • 2005
  • Since the designation of the South Korean Construction industry as an open market industry by the World Trade Organization (WTO) in 1994, South Korea's construction firms were exposed to competition from firms of other advanced countries. Increased competition in the industry raised quality of production and lowered the cost of construction projects. Therefore, many big construction projects were planned and constructed with foreign construction partners during the last decade. Also, from those projects the South Korea Construction industry accumulated experience in and knowledge of both project management and construction management perspectives. However, in the process of conducting those big projects, many problems - specifically responsibility and the limit of competence - occurred between foreign construction partners. Hence, this study attempts to improve its role model that is for local and foreign companies to enter into Joint Ventures in the South Korea construction industry.

  • PDF

A study on the Application of Operation Model for Technical Proposal-Based Tender of Large Construction Project (대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구)

  • Cho, Sung;Cho, Yong;Paek, Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.591-596
    • /
    • 2008
  • Success or failure highly depends on delivery method in construction projects. This paper mainly focused on operation model for technical proposal in Large construction projects. This operational model uses Technical Proposal-Based Tender. This project studied order and delivery method in large construction projects. And delivery systems of international and domestic market are researched, and then condition of delivery system and problems are derived from them. Especially, it researched that it is hard to reflect special feature in large construction projects. As a result of having referenced idea as describe above, this paper will be studied by this process. First, definition of delivery method and large construction projects is researched. Second, delivery systems of international and domestic market are checked. Third, problems and condition of delivery system in large construction projects are investigated. Fourth, application of operation model for technical proposal-based tender are presented in large construction projects.

  • PDF

Delay Factors Affecting the Completion of the Government Construction Projects in Vietnam

  • Kim, Soo-Yong;Nguyen, Viet Thanh;Luu, Van Truong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.161-165
    • /
    • 2015
  • The delay in construction is the challenge often faced in the course of executing construction projects. To the government projects, the delays become very serious. This problem directly affects the lives, social welfare of the people, and the other negative social impacts. However, the government projects have not been much interest. The questionnaire surveys in Vietnam were conducted to determine the causes of the delay and to find solutions for dealing with the delay. The average index was used to rank the delay factors and the solutions. This study identified the 5 most highly ranked delay factors and the 8 best solutions from a list of 31 delay factors and 19 solutions for the delay. The five most highly ranked delay factors were: information delays and lack of information exchange between the parties; incompetent owner; incompetent supervision consultant; incompetent contractor; and difficulties in financing project by owner. The findings of the study can help the parties involved the government construction projects and practitioners to give appropriate strategies for countering the delay in their projects.

  • PDF

Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan

  • Musarat, M. Ali;Ahad, M. Zeeshan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.1-6
    • /
    • 2016
  • Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF