• Title/Summary/Keyword: construction project owner

Search Result 240, Processing Time 0.024 seconds

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF

Role of Public Owner for Delivery of Public Experience Facility Construction Project (공공 체험시설 건설사업 발주를 위한 공공 발주자 역할에 관한 연구)

  • Song, Hyunjang;Lee, Seunghoon;Jin, Zhengxun;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.28-36
    • /
    • 2022
  • Since the establishment of a large-scale public experience facility in Korea, the construction project of public experience facilities has recently changed to a form where local governments or local education offices place delivery alone or agreements. In particular, due to the low frequency of delivery and the nature of delivery organization that do not have specialized organizations specializing in Delivery Framework, the role of enhanced Public Owner is needed. In response, this study investigated the current status and operation status of public experience facility construction projects in Korea and derived problems and directions for improvement of the current role of Public Owner. In addition, the study proposed the improvement of the role of public Owner in public experience facilities, which are composed of the promotion stage and functions reflecting the factors and attribute information of the business characteristics.

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF

Key Performance Indicators for Project Management Performance of Large Contractors in Developing Countries: A Case Study in Vietnam

  • Soo-Yong Kim;Troung-Van Luu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1599-1607
    • /
    • 2009
  • In order to deal with severe competition in the construction market of developing countries, large contractors must continually improve their own performance and operation. Performance measurement is the heart of ceaseless improvement in organizations. Key performance indicators (KPIs) play a key role in measuring project management performance (PMP) of large contractors in developing countries. The main objective of this paper is to identify KPIs, which can be used to measure PMP of contractors, and then analyze the underlying relationships of these KPIs in order to gain insight into PMP of large construction firms in Vietnam construction industry (VCI). Literature reviews and the pilot survey provided 30 KPIs. Fourteen KPIs, which have the mean values higher than 3.0, were considered as important KPIs through a questionnaire survey of 32 professionals. Factor analysis of these KPIs was employed to categorize them. The results of the survey revealed that top six KPIs are construction time and cost, owner satisfaction on services and products, and quality management and project team performance. Factor analysis uncovered that 14 top-ranked KPIs can be grouped under six categories, namely: (1) construction input management, (2) owner satisfaction, (3) cost and quality, (4) manpower management, (5) subcontractor performance and (6) equipment management. The findings of this research can be used as a guideline to measure PMP of contractors in Vietnam as well as in other developing countries. Since contractors from a country to the other country may have the same manner to manage construction projects, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in other developing countries.

  • PDF

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.