Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

A Study of the Effect of PMC and Human Resource Competency on Construction Project Performance Outcomes (PMC (Project Management Consultant)와 인적자원역량이 건설프로젝트성과에 미치는 영향에 관한 연구)

  • Lee, Heonchang;Lee, Jeongryun;Ahn, Byeonghoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.701-710
    • /
    • 2022
  • This study aims to prove the importance and necessity of a project management consultancy (PMC) that systematically manages construction projects to ensure their successful implementation. In order to analyze the interrelationship between the role of PMC and the outcome of the construction projects, structural equation modelling(SEM) was conducted. Hence, one of the critical aspects when conducting the project, human resource competency, especially referring to the competency of project team members and the project manager's leadership, affects the performance of construction projects. As a result of this study, PMC is found to have significant effects on human resource competency and construction project performance. In addition,human resource competency also had a significant effect on construction project performance. Consequently, the research outcomes suggest that introducing PMC services should be done when implementing large domestic infrastructure projects successfully, as doing so will enhance PM leadership and strengthen the capacity of the project team members.

Data-Driven Approaches for Evaluating Countries in the International Construction Market

  • Lee, Kang-Wook;Han, Seung H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.496-500
    • /
    • 2015
  • International construction projects are inherently more risky than domestic projects with multi-dimensional uncertainties that require complementary risk management at both the country and project levels. However, despite a growing need for systematic country evaluations, most studies have focused on project-level decisions and lack country-based approaches for firms in the construction industry. Accordingly, this study suggests data-driven approaches for evaluating countries using two quantitative models. The first is a two-stage country segmentation model that not only screens negative countries based on country attractiveness (macro-segmentation) but also identifies promising countries based on the level of past project performance in a given country (micro-segmentation). The second is a multi-criteria country segmentation model that combines a firm's business objective with the country evaluation process based on Kraljic's matrix and fuzzy preference relations (FPR). These models utilize not only secondary data from internationally reputable institutions but also performance data on Korean firms from 1990 to 2014 to evaluate 29 countries. The proposed approaches enable firms to enhance their decision-making capacity for evaluating and selecting countries at the early stage of corporate strategy development.

  • PDF

EFFECTS OF ADOPTING KMS BASED BUSINESS PROCESS MANAGMENT IN DESIGN COMPANIES IN KOREA

  • Jin-Won Hwang;Hyung-Won Choi;Doo-Won Hwang;Young-Woong Song;Hyong-Chul Lim;Yoonki Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1030-1035
    • /
    • 2009
  • The value of intangible assets of a company attracts attention in enterprise management environment drastically changing. Following such a trend, many companies have adopted knowledge management. Especially in construction industry of which success of a project is easily affected by the capacity of various participants and work performers, we may find many cases to which the knowledge managements have been adopted. However, the domestic design companies have tended to be late to introduce the knowledge management or have difficulty in effective use of KMS already constructed. This study suggests KMS based on BPM (Business Process Management) and drives its effects to improve problems mentioned above. We drives the expected effects by studying the existing studies and surveying domestic design companies and suggests Prototype for introducing a real system.

  • PDF

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

Critical Factors Causing Delay on State-Funded Construction Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong;Pham, Nguyen-The-Thanh;Nguyen, Thanh-Long;Nguyen, Tuan-Kiet
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.104-108
    • /
    • 2015
  • Delay on State-Funded Construction Projects (SFCPs) in Dong Thap - a province in Mekong Delta of Vietnam, as many provinces of Vietnam, have caused budget overrun through many recent years. The budget-overrun situations, in turn, have deepened the delay. Identifying critical factors affecting delay SFCPs plays a key role to mitigate negative impact of delay. 134/160 questionnaires were collected from personals working for project owners, consultants, supervisors and contractors in Dong Thap Province. Convenient sampling method was used. EFA was resulted in critical 04 factors with 20 variables caused delay in SFCPs, including: "Project technic, contractor's financial capacity and adjustment role of the government", "Regulation and Policy", "Mutual benefit support and concern between the government and residents", and "Disadvantage of construction site and weather season". Reliable measures to reduce delay on SFCPs are discussed to establish legal corridors to strictly controlling the process, consider mutual benefit between the government and its residents, and evaluating construction conditions. Those measures are considered could be applied in not only Dong Thap province, but most provinces of Vietnam as well.

  • PDF

Competency Development in Urban Local Bodies for Implementing Public Private Partnership Projects in India

  • Devkar, Ganesh A.;Kalidindi, Satyanarayana N.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.35-48
    • /
    • 2013
  • Weak competencies in urban local bodies (ULBs) for implementing public private partnership (PPP) projects has been recognized as a major hurdle in uptake of PPP model in India. In this context, a questionnaire survey was conducted to evaluate perception of urban PPP experts and ULB representatives on three aspects related to competency development, including, critical competencies for implementing urban PPP projects, approaches for competency development in ULBs and constraints faced by ULBs in development of competencies. The five critical competencies identified are project identification, project conceptualization, transaction design, PPP process management and contract management. The approach of training programs for municipal staff and elected representatives, and capacity building oriented technical assistance for implementing urban PPP projects have been preferred by survey respondents for competency development. The frequent transfer of municipal decision makers and low motivation among municipal staff have been identified as the most significant constraints for development of competencies.

Modelling the Estimation Process of Greenhouse Gas Emission in the Construction of Buildings

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.266-274
    • /
    • 2012
  • The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. To meet the government's greenhouse gas reduction targets, the construction sector has until 2020 to cut its emissions by 7.1%. Unlike other high-tech industrial sectors, the construction sector has a fairly limited scope for technological improvements, which hampers its capacity to achieve the reduction target. To reduce emissions, it is necessary to establish an energy and emissions strategy at the project planning stage, and energy use and the resulting emissions must be estimated. This research aims to establish an estimation methodology for greenhouse gas emissions at the planning stage of construction projects. To estimate the project-related emissions, this research indentified the relationship among the types of emissions in a cross-sectional matrix form, and then provided a set of calculation methods for total project related emissions.

A Study on the Application of the Construction Management showing up the HuaSungSungYouk-EuGye during the Chosen Dynasty (조선시대 화성성역의궤에 나타난 건설관리 적용에 관한 연구)

  • Yi Tae-Yeual;Lee Sang-Hae;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-346
    • /
    • 2001
  • The purpose of this study is not only to show up the fact which a kind of construction management was applied during the ancient Korea, especially, Chosun Dynasty but also to understand its construction capacity by analysing various information. mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may involve a single person or many thousands. 1'his study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modem construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

Analysis of Business Implementation Strategy and Construction Management Techniques in Spearheading Overseas Expansion

  • Park, Kyungrog;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.472-476
    • /
    • 2015
  • The purpose of this study is to fully understand the present state of the domestic construction companies, and to analyze phased business types and construction management techniques in order to initiate overseas expansion. Because of the recession in the domestic construction market, a thorough and strategic perspective to constantly develop inroads into overseas market is required. So we carried out a questionnaire survey targeting the experts of the overseas construction and researcher, and consulted them in depth. The questionnaire survey was divided into three sections. The first section is the necessity of overseas construction and the reason. The second is the overseas business types classified into the way of advance in short-term and long-term phase possibility of expansion. Lastly, the importance of the phased construction management techniques and the current capacity of the domestic and the foreign business trends were scrutinized. On the basis of the consultation and surveys, we analyzed the overseas business types and the construction management types in the short-term and long-term phase.