조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안 (Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

모바일 기술을 이용한 마감공사의 작업간섭 관리 (Process Interference Management for Finish Works using Mobile Technology)

  • 고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석 (Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project)

  • 이상현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

건설프로젝트의 작업유형별 3차원 작업공간 생성 및 간섭 최적화 방안 (Workspace Generation and Interference Optimization Algorithm by Work-type using 3D Model Object in a Construction Project)

  • 김현승;문현석;김창학;강인석
    • 대한토목학회논문집
    • /
    • 제34권6호
    • /
    • pp.1911-1918
    • /
    • 2014
  • 건설공사 프로젝트에서 인력 및 장비 등의 투입자원 증가는 공정간의 작업공간 간섭을 유발할 뿐만 아니라 프로젝트의 생산성과 품질에 영향을 미칠 수 있다. 이를 해결하기 위해 작업공간관련 연구가 수행되고 있으나, 단순히 공정들의 기하학적 위치만을 고려하여 작업공간을 검증하거나, 작업공간의 형상을 세부 작업별 분리된 형상이 아닌 일괄적 하나의 객체 형태로 생성하고 있다. 이러한 방식은 공정의 특성과 자원의 투입 시간에 따라 변화하는 작업공간의 크기를 반영하지 못하므로 합리적인 작업공간 충돌의 분석이 어렵게 된다. 이를 위해 본 연구에서는 공정과 자원의 특성에 적합한 작업공간의 형상과 크기를 생성할 수 있도록 작업공간의 3차원 모델 생성방법과 운용 시스템을 개발한다. 또한 이를 적용한 작업공간 간섭최적화 연계방안과 건설장비의 최적 이동경로 탐색 방법론을 개발하여 실무적 활용성을 검증한다.

작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출 (Masonry work interference factor deduction based on daily report data analysis)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

INTERFERENCE CHARACTERISTICS OF CONSTRUCTION ENVIRONMENT FOR WSN APPLICATIONS

  • Sun-Chan Bae;Won-Sik Jang;Sang-Dae Park;Won-Suk Jang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.592-595
    • /
    • 2013
  • Advent of Wireless Sensor Networks (WSN) has provided potentials to a variety of construction applications. It is well appreciated that WSNs have advantages over traditional wired system, such as ease of installation and maintenance with increased cost savings and efficiencies. However, the obstruction of wireless signal from physical objects in the heterogeneous construction environment often brings challenges to WSN measurement system. This paper analyzed the obstruction characteristic of construction environment where construction materials, equipment, and built structures obstruct the wireless signal yielding negative effect of measurement system. By adopting evaluation criteria, such as packet reception rate, field experiments have been implemented to quantitatively identify the interference of wireless signal from penetration, reflection, and network traffic under the construction environment. The results show that reliable performance of wireless sensor in construction environment depends on the optimal separation distance between a receiver and a transmitter, obstruction types, obstruction thickness, and transmission interval. In addition, the methodology and experimental results of this paper could be used in the practical design of network topology when hundreds of sensor nodes form a mesh network in the large scale construction applications.

  • PDF

송전선로의 효과적인 건설 연구 (A Study of an effective construction of Transmission Line)

  • 강기홍;이석규;윤영순;이종수;오창효
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.244-246
    • /
    • 2003
  • The construction conditions of transmission line in Korea are very hard. Actually, the construction project is processed inefficiently with constant civil appeal and interference by local residents of a region and environment organization, not to speak of landlord, because it is regarded as antipathy facility and passes through a lot of regions. Especially, it is concluded that effective practice of a construction project is serious in the future because transmission power voltage was upgraded to 765kV according to a sharp increase of electric power demand. Therefore, with the background of the experience of the past, this paper is aimed to study and establish a reasonable improvement plan which enables to eliminate wasteful factors for effective construction work of transmission line.

  • PDF

What is a Critical Factor for Determining the Issue-Resolving Time in the BIM-based Coordination Process?

  • Jang, Sejun;Lee, Dongmin;Lee, Ghang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.392-395
    • /
    • 2015
  • This study analyzes critical factors that affect issues of resolving time in BIM-based coordination using a case study. According to recent buildings that are meant to be more complex, BIM-based design coordination is regarded as an essential stage of the project delivery process. In the design coordination phase, a relocation of architectural, structural, mechanical, and electrical elements is conducted to avoid interference. In addition, the procedure of the development of each element in detail for the actual construction is carried out. Delays in coordination can affect delays in the entire delivery schedule of the project, and therefore many researches have focused on efficient coordination methods and how to shorten the period. In this study, we conducted a detailed analysis of the issue-resolving process using a case study, and found out that the participation of decision-makers for issue-resolving and the physical combination of trades affect delays in coordination time. In particular, we proposed the concept of organizational relation, indicating the level of decision-makers for issue-resolving, and the concept of physical relation, indicating the physical complexity of the issue, and we analyzed the effects of coordination delays.

  • PDF

능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구 (Usability Improvement of BIM for Construction Projects Using Active BIM Functions)

  • 강인석;문현석;김현승;곽중민
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.74-83
    • /
    • 2013
  • 현재 활용되고 있는 대부분의 BIM체계는 설계 및 시공단계의 작업 현상에 대한 시각적 정보제공에 초점을 두고 있는 수동형 BIM (Passive BIM) 운영체계이다. 수동형 BIM체계에서는 설계성과품의 간섭발생 부위를 3D객체에 의해 시각적으로 파악할 수 있으나, 추가적으로 간섭 상황의 해결방안을 제시하는 것은 곤란하다. 또한 시공단계 4D시뮬레이션도 일정별 시공형태의 표현은 가능하나, 프로젝트 공정조건을 고려한 최적화된 일정계획의 제시 등은 미흡한 수준이다. 그러나 최근 다양한 기관에서 BIM을 적용하면서 사용자의 BIM 요구수준은 이미 시각적 정보제공을 넘어서, 파악된 문제 현상의 해결방안까지 BIM으로 표현할 수 있는 능동형 BIM (Active BIM) 기능들을 요구하고 있다. 본 연구에서는 능동형 BIM의 개념적용을 위해 시공단계의 대표적 BIM 도구인 4D CAD시스템을 예로 하여 능동형 기능 구성방법론을 제시하고 독자적 개발엔진으로 시스템 구현을 시도하였다.