• Title/Summary/Keyword: construction practice

Search Result 1,074, Processing Time 0.024 seconds

Application of MRS(Multi Ribbed Slab) System with 4Story-1Piece Columns (4층(層)1절(節) 기둥을 이용한 MRS(Multi Ribbed Slab)공법 적용)

  • Kim, Jung-Taek;Im, Ju-Heuk;Jeon, Byong-Kap;Kim, Yong-Nam
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.85-88
    • /
    • 2011
  • MRS(Multi Ribbed Slab) method was developed to accomodate Korean construction practice and needs of Korean customer. By means of 4story-1piece column and MRS method, we achieved construction cost cut down and reduction of construction period.

  • PDF

Review Methods of Pumping Effciency using the Concrete flow Table Test (콘크리트 플로 테이블 테스트를 활용한 압송성 검토 방법)

  • Kwon, Hae-Won;Gong, Min-Ho;Kim, Bong-Sup;Yu, Jong-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.9-10
    • /
    • 2016
  • This study is purposed to review the confirm method of pumping efficiency using the concrete flow table test in Korea environment. This test method is registered as the "EN 12350-5, Testing fresh concrete. Flow table test" in Eurocode. When applying this test in the Korea construction environment, we reviewed that reasonably apply on the Korean construction Environment. As a result, test results analysis showed that the reality looks a big difference. Its cause is believed to be due to the shape of coarse & fine aggregate. But it will be better predict method, through the correlation analysis of construction data and the standard(Placing Concrete by pumping Methods(ACI Manual of concrete Practice 304.2R-96)).

  • PDF

ICT-BIM based Quality Nonconformity Control Method for Construction Project (ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템)

  • Son, Sang-Hyuk;Lee, Hyung-Guk;Bae, Sang-Hee;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

Development of Construction Process Safety Information Management System for Safety Accident Prevention (안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발)

  • Jun Hyun Jong;Yang Kwang Mo;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

Long-Life Demonstration Housing Infill Construction : Theory and Practical Limits (장수명 실증주택 인필 시공: 이론과 현실적 한계)

  • Kim, Soo-Am;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.89-90
    • /
    • 2019
  • The purpose of this study is to clarify the difference between design and construction conditions based on theory for support (S) and infill (I) distinction and separation in long-life housing, and to search for future direction. To do this, the SI theory is summarized and the construction situation is examined in the demonstration house and the differences and limitations are analyzed. In order to realize SI separation in Korea, it is necessary to set the position of pipe shafts for sewage and drainage, buried in the structure and Ondol layer of the private pipes, buried various wires in the inner wall, and fixing the position of the inner wall.

  • PDF

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

A Study of an effective construction of Transmission Line (송전선로의 효과적인 건설 연구)

  • Kang, Gi-Hong;Lee, Seog-Kyu;Yoon, Young-Soon;Lee, Chong-Soo;Oh, Chang-Hyo
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.244-246
    • /
    • 2003
  • The construction conditions of transmission line in Korea are very hard. Actually, the construction project is processed inefficiently with constant civil appeal and interference by local residents of a region and environment organization, not to speak of landlord, because it is regarded as antipathy facility and passes through a lot of regions. Especially, it is concluded that effective practice of a construction project is serious in the future because transmission power voltage was upgraded to 765kV according to a sharp increase of electric power demand. Therefore, with the background of the experience of the past, this paper is aimed to study and establish a reasonable improvement plan which enables to eliminate wasteful factors for effective construction work of transmission line.

  • PDF

Prospects of Development of the Russian Asia Railway System: Geoeconomic Aspect

  • Evgeniy, Kibalov
    • International Journal of Railway
    • /
    • v.3 no.4
    • /
    • pp.123-125
    • /
    • 2010
  • That Russia is potentially great transport power becomes obvious if look to map of any route. The geographical position of the Russian Federation unequivocally specifies intended by nature the role of geobridge between the countries of Asia-Pacific Region and Europe. However, in construction engineering practice and feasibility study the construction of difficult and strategically important bridges is generally joins in wider concept of bridge crossing. The last includes not only actually the bridge(through the river, gulf, etc.), but also approaches to it, which construction in view of features of a relief and a configuration of new transport communications which have already developed and subject to construction not less difficult technically and not only economically expended, than building of the basic artificial construction.

  • PDF

Greenhouse Gas Management Policy during Construction Execution Phase -Focused on Green Building Rating Systems and Japanese Case- (건축물 시공단계에서의 온실가스 배출 관리 방안 -국내외 친환경 인증제도와 일본 현장의 대응 방안을 중심으로-)

  • Song, Sang Hoon
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.139-150
    • /
    • 2010
  • Until now, the eco-friendly construction (green construction) has been focused on reducing environmental impacts in use(operation and maintenance) phase. Considering the environmental influence along the life cycle of construction project, the impact in execution phase is rather lower than that in use phase. However, that impact is thought to be greatly decreased by well-organized activities. Based on its urgency and requirement for timely action, this study aimed to discuss the greenhouse gas (GHG) reduction plan in execution phase from a broad perspective. To achieve this purpose, the green building rating systems in domestic and foreign countries have been reviewed, and the practice in Japan was investigated. In order to improve current on-site greenhouse gas management, the integration among construction phases, participants, and environmental factors, and institutional supports are required as well as the contractor's efforts.

A Case Study on the Slope Reinforcement by Improved Steel Pipe Nailing (개량 강관네일링 공법을 이용한 사면 보강사례 연구)

  • Choi, Dong-Nam;Lim, Heui-Dae;Song, Young-Su;Lee, Kyu-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.1 s.79
    • /
    • pp.54-60
    • /
    • 2007
  • This paper describes typical design and construction practice for in-situ ground reinforcement technique using improved steel pipe pressure grouting. A case history is presented to illustrate the benefit gained by application of the technique. This technique was applied to cut slopes developed in the construction of auxiliary spillway of 00 dam. Applicable conditions, method of survey, slope stability analysis and construction are given in this parer. As for the construction method, a procedure is given and the main points are the control of construction work. As a result of the pull-out test, it is shown that seel pipe nailing is particularly useful for stabilizing rock slope.