• Title/Summary/Keyword: construction operation monitoring

Search Result 200, Processing Time 0.037 seconds

Development of train speed controller for EMU using servo-controller

  • Lee, Su-Gil;Han, Seong-Ho;Han, Young-Jae
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.178.1-178
    • /
    • 2001
  • The ATO(Automatic Train Operation) System is used for train operation instead of dreivers. It is interfaced with TCMS(Train Control and Monitoring System) and ATC/TWC system in the train and wayside facilities. In this paper describes configuration of ATO, Specification of ATO hardware, construction of ATO software and the algorithm for automatic train speed regulation in the carborn ATO system. This paper is mainly concerned with the development of the ATO System. The ATO system is used for automatic or driverless operation of a train using various informations from TCMS, ATC, TWC. In this paper, the general architecture of the ATO system, implementation of ATO application software and the algorithm using servo-controller for automatic train speed controller.

  • PDF

A Study on the Development of Long-term Self Powered Underground Pipeline Remote Monitoring System (자가 발전형 장기 지하매설배관 원격감시 장치 개발에 관한 연구)

  • Kim, Youngsear;Chae, Hyun-Byung;Seo, Jae-Soon;Chae, Soo-Kwon
    • Journal of the Korean Society for Environmental Technology
    • /
    • v.19 no.6
    • /
    • pp.576-585
    • /
    • 2018
  • Systematic management during the whole life cycle from construction to operation and maintenance is very important for the seven underground pipelines (waterworks, sewerage, electricity, telecommunications, gas, heating, oil including waterworks and sewerage). Especially, it is the construction process that affects the whole life cycle of underground buried pipeline. In order to construct a new city or to maintain different underground pipes, it is always necessary to dig the ground and carry out construction and related work. There is a possibility that secondary and tertiary breaks frequently occur in the pipeline construction process after the piping constructed first in this process. To solve this problem, a system is needed which can monitor damage in real time. However, the supply of electric power for continuous operation of the system is limited according to the environment of underground buried pipelines, so it is necessary to develop a stable electric power supply system using natural energy rather than existing electric power. In this study, we developed a system that can operate the pipeline monitoring system for long time (24 hours and 15 days) using natural energy using wind and solar light.

Monitoring-Evaluation System for Lifting Heavy Structures using 3D Location Data (3차원 위치좌표를 이용한 대형 구조물 양중을 위한 계측 - 평가 시스템)

  • Lee, Myung Ho;Chun, Sung Chul;Oh, Bohwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.4
    • /
    • pp.413-420
    • /
    • 2009
  • Heavy structures such as large roof structures and superbeams were lifted using hydraulic jacks. Moreover, member verticality and horizontality checks were performed at every construction stage to monitor the measuring tapes for their structural safety, using CCTV. When the relative displacement exceeded the predetermined limit, the hydraulic systems were terminated. After adjusting the relative displacement manually, lifting was resumed. The accuracy of the relative displacement was found not to be reliable, however, due to eye check using CCTV, and it took a long time due to manual adjustment. Moreover, real-time monitoring was impossible. To address these problems, the monitoring-evaluation system for the stable lifting of heavy structures was proposed, using the total station of the automatic-target-recognition type, laser-distance-measuring devices, a data logger, a strain gauge, and others. After developing a program for the operation of the system and for the acquisition of data, a mock-up test was conducted in a large-scale structural laboratory to evaluate the accuracy and applicability of the system. The stable acquisition and applicability of data was confirmed in the test.

Operation of an Experimental Watershed for River Water Quality Management (하천수질관리를 위한 시험유역의 운영)

  • Kim, Sang Ho;Choi, Hung Sik
    • Journal of Wetlands Research
    • /
    • v.7 no.1
    • /
    • pp.81-91
    • /
    • 2005
  • We construct the hydrology-water quality monitoring system which can watch the variations of river flow and water quality in real time. We also construct the river management system through the hydrology-water quality monitoring system that can observe water quality and its variations for preparing for the accident of river pollution. The Gyecheon basin which is located at the upstream of Heoengseong dam is selected as an experimental watershed for the system construction. The real time monitoring system for getting more correct hydrological and water quality data consists of 3-rainfall gauge station, 3-water level gauge station, and 1-water quality gauge station. We intend that the data such as rainfall, water level, velocity, flow, and water quality will be collected and we try that the data may be used for practical and other purposes.

  • PDF

KINETICS OF AUTOTROPHIC DENITRIFICATION FOR THE BIOFILM FORMED ON SULFUR PARTICLES : Evaluation of Molecular Technique on Monitoring Biomass Growth

  • Kim, Sung-Youn;Jang, Am;Kim, I-Tae;Kim, Kwang-Soo;Kim, In-S.
    • Environmental Engineering Research
    • /
    • v.10 no.6
    • /
    • pp.283-293
    • /
    • 2005
  • Characteristics of sulfur-based autotrophic denitrification in a semi-continuous type reactor and the kinetic parameters were studied. Enriched autotrophic denitrifying culture was used for the reactor operation. Biomass growth on sulfur particles and in the liquid medium was monitored using the DAPI staining method. From the result of ion concentration changes and the biomass growth, maximum specific growth rate, ${\mu}_{max}$, and the half velocity constant, $K_M$, were estimated as $0.61\;d^{-1}$ and 3.66 mg/L, respectively. Growth yield coefficient, Y values for electron acceptor and donor were found as 0.49 gVSS/g N and 0.16 gVSS/g S. The biomass showed specific denitrification rate, ranging 0.86-1.13 gN/g VSS-d. A half-order equation was found to best simulate the denitrification process in the packed bed reactor operated in the semi-continuous mode.

Interdisciplinary Procedure for Scour Estimation at Inchon 2nd Bridge Piers (인천 제2연육교 세굴문제 해결을 위한 학제간 공동연구 방안)

  • Yeo, Woon-Kwang;Kim, Jeong-Hwan;Lee, Yang-Ku;Kim, Tae-In;Kim, Jong-In;Kwak, Ki-Seok;Lee, Jong-Kook;Kwak, Moon-Soo;Kim, Moon-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.71-80
    • /
    • 2005
  • More than 100 bridges have been annually collapsed or seriously damaged by scouring in Korea. It is extremely hard to understand the complicated scour mechanism and estimate the scour depth with accuracy in fields, however since scouring is a very complex manifestation of sediment transport unable to describe with a simple mathematical tool. In order to obtain the reasonable solution to bridge scouring, therefore, the interdisciplinary co-operation is strongly recommended. In this study the special task force team for the scour problems around Incheon 2nd bridge piers is made, in which all kinds of scour oriented researches such as oceangraphic survey, hydraulic model test, numerical simulation, scour rate test, real-time scour monitoring, etc will be carried out. This paper provides this interdisciplinary procedure in details.

  • PDF

A Study on Heating Energy Monitoring of a Rural Detached House Applying Passive House Design Components (패시브 하우스 디자인 요소를 적용한 농촌지역 단독주거건물의 난방에너지 모니터링 연구)

  • Cho, Kyung-Min;Lee, Tae-Goo;Han, Young-Hae
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.39-46
    • /
    • 2013
  • Recently, the field of construction is putting a variety of effort into reducing CO2, since global warming is being accelerated due to climate changes and the increase of greenhouse gas. For reduction of CO2 in the field of construction, it is required to make plans to cut down heating energy of buildings and especially, it is urgently needed to cut down energy of residential buildings in rural area where occupies the majority of consumption of petroleum-based energy sources. Therefore, this research compared and analyzed the actual energy consumption, by evaluating energy performance of a detached house applying passive house design components for reduction of energy. As the result, energy consumption showed remarkable differences, according to the operation of a heat recovery ventilation unit which is one of passive house design components, and building energy consumption displayed remarkable differences, too, depending on the difference of airtightness performance during building energy simulation conducted in process of design. Based on these results, the importance of airtightness performance of passive house was verified. The result of the actual measurement of energy consumption demonstrated that LNG was most economical amongst several heat resources yielded, on the basis of LPG source energy consumption measured within a certain period of time, and it was followed by kerosene. LPG was analyzed to have a low economic efficiency, when used for heating.

A Study on the Guidelines for Creating Alternative Habitats through Environmental Impact Assessment (환경영향평가 협의 시 대체서식지 조성을 위한 가이드라인 마련)

  • Shim, Yun-Jin;Park, Yong-Su
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.5
    • /
    • pp.69-79
    • /
    • 2019
  • The purpose of this study is to suggest a guideline that can be used as a standard for consultation and review by environmental impact assessment consultation and review practitioner to enhance the practical effectiveness of creating alternative habitats. The consultation stage of environmental impact assessment was significantly divided into 1) preparation of draft environmental impact assessment reports and gathering of consensus thereon, 2) preparation of environmental impact assessment reports and consultation thereon, 3) follow-up survey of environmental impacts(under construction) and 4) follow-up survey of environmental impacts(in operation). And it was suggested that the procedures of creating alternative habitat by each consultation stage were linked in order of 1) planning, 2) designing, 3) construction, and 4) post-monitoring and maintenance. The basic principles were also proposed for each stage of consultation on environmental impact assessment and procedure for the creation of alternate habitats. Then, issues and methods to be reviewed by the consulting agency and review agency of environmental impact assessment were presented in detail. The guideline of this study provides important information not only to environmental impact assessment consultation and review practitioner, but also to developers and environmental impact assessment agents who plan, construct, and manage alternative habitats.

Compaction Management Criteria for Fill Materials of Concrete Faced Rockfill Dam (CFRD 축조재료의 다짐관리 기준)

  • Kim, Yong-Seong;Park, Han-Gyu;Lim, Heui-Dae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.343-348
    • /
    • 2005
  • In this study, construction modulus, void ratio and settlement characteristics of 38 CFRD in domestic and foreign countries was investigated from monitoring data and the effect of field dry density and void ratio to dam body was analyzed. The standard void ratio of CFRD that can be easily used for dam designer and field engineer was proposed from the monitoring data. It was conformed that we can get the degree of compaction needed for reasonable compaction of dam body by calculating the field dry density from inverse operation of the standard void ratio. It was thought that the standard void ratio of CFRD is 0.2 as shape factor is under 4 and is 0.28 as shape factor is over 4.

  • PDF

Insulation deterioration monitorring system construction of reactor coil of the rolling stocks (전동차의 리액터 코일의 절연물 열화 모니터링 시스템 구축)

  • Ahn, Jong-Kon;Kim, Dong-Min;Hwoang, Nam-Hoon;Park, Soon-Myung;Won, Bong-Eue
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.900-907
    • /
    • 2008
  • All electric trains in the city should be run without any troubles of the equipments in order to offer good services to the passengers. But some breakdowns occur when they are operated due to the long time uses. There are mechanical troubles and electrical troubles included reactors. Most of them, the reason of the troubles can be found out easily after breakdown. But it is difficult to find out the reasons of the reactor troubles which disappear after operation. The reactors of the train filter the current which supplied from electrical lines and supply the current to the inverter and block the ripple of the current. Partial discharge occur from the reactor by the heat. accordingly, If the signals of discharge were perceived, it could be anticipate the deterioration degree of insulation. In this paper, on-monitoring system for reactor's troubles in trains is established and the output results of monitoring system are investigated.

  • PDF