• Title/Summary/Keyword: construction operation monitoring

Search Result 199, Processing Time 0.029 seconds

Construction of Intelligent Substation for 154kV Class (154kV급 인텔리전트 변전소 구축)

  • Chung, Y.H.;Yang, D.I.;Kim, J.B.;Song, W.P.;Choi, I.H.;Kim, J.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.33-35
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Construction of Intelligent Substation for 154kV Class (154kV급 인텔리전트 변전소 구축)

  • Chung, Y.H.;Yang, D.I.;Kim, J.B.;Choi, I.H.;Kim, J.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.129-130
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring rendition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Intelligent Substation Construction of 154kV Class (154kV 인텔리전트 변전소 구축)

  • Kim J B.;Chung Y. H.;Song W. P.;Choi I. H.;Kim J. H.;Lee D. I.;Koh H. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.524-526
    • /
    • 2004
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(UP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Compaction Management of Fill Materials for Concrete Faced Rockfill Dam Using Standard Void Ratio (표준간극비를 이용한 콘크리트 표면차수벽형 석괴댐 축조재료의 다짐 관리)

  • Kim Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.4
    • /
    • pp.59-66
    • /
    • 2006
  • In this study, construction modulus, void ratio and settlement characteristics of 38 CFRD in domestic and foreign countries were investigated from monitoring data. The effect of field dry density and void ratio to dam body was analyzed. The standard void ratio of CFRD that can be easily used by dam designers and field engineers was proposed from the monitoring data. It was confirmed that we can get the degree of compaction needed for reasonable compaction of dam body by calculating the field dry density from inverse operation of the standard void ratio. It was thought that the void ratio of CFRD depends on shape coefficient and in case of a high shape coefficient, the void ratio was high with its void ratio 0.17 -0.38.

Construction of 154kV Intelligent Substation for Verification Test (154kV급 실증시험용 인텔리전트 변전소 구축)

  • Chung, Y.H.;Kim, J.B.;Lee, H.S.;Choi, I.H.;Lee, D.I
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.661-662
    • /
    • 2007
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this paper, we mention the synopsis and report the progress state of project.

  • PDF

Geotechnical Characteristics of Major Earth and Rockfill Dams in Korea (우리나라 주요 록휠 댐의 지반공학적 특성)

  • 유태성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.3.2-27
    • /
    • 2002
  • This paper presents the status of dam construction in Korea, along with a brief assessment of the dam design and construction practice. The assessment is based on publically available design and construction records of the major existing rockfill dams which have been constructed since early 1970's, and focussed in identifying geotechnical characteristics of design and construction parameters of the dams. Though the assessment, two representative dams, having unique geotechnical characteristics, are selected for comprehensive comparison of their geotechnical engineering behavior during construction and operation. The comparison yields very interesting findings on the effects of various design and construction parameters on dam behavior.

  • PDF

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

A Design of IT-Convergence Plant Factory System Using the Renewable Energy (신재생에너지를 활용한 IT-융합 식물공장 시스템 설계)

  • Lim, Gye-Jae
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.4
    • /
    • pp.769-779
    • /
    • 2015
  • In this paper, the ideal standard design and construction of plant factory systems with the Green IT technologies is proposed. For feasibility and problem analysis, a container-type plant factory which was integrated with hardware and software of elemental technologies was operated as a test bed. This operation testing and research will be the foundation of the future construction and operation of large plant factories.

Basic Research for Reducing Fine Dust in Urban Construction Sites Using Water Fog (미분무수를 활용한 도심지 건설현장 미세먼지 저감을 위한 기초연구)

  • Han, Jae Goo;Kim, Young Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.209-210
    • /
    • 2019
  • This paper investigates and analyzes related systems, policies, and research trends that are used to prepare the operating regulations for drone-based fine dust monitoring and water fog injection systems in small-sized construction site. As a result of the study, we have drawn a total of six major items to consider when drafting the drone related operational regulations. It will also be used as a basis for future development system operation regulations.

  • PDF

Analysis of Prerequisites for Using Surveillance Drones and Water Fog Spraying Drones for Fine Dust Reduction in Smart Construction (스마트건설에서 미세먼지 저감을 위한 감시드론 및 Water Fog 분사 드론을 활용하기 위한 사전 요건 분석)

  • Kim, Young Hyun;Han, Jaegoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.249-250
    • /
    • 2021
  • The use of smart equipment such as drones is increasing in construction sites. In particular, there are frequent cases where two or more drones must be used at the same time. This leads to different considerations than when operating a single unit. This study aims to analyze the requirements to be considered in the case of the operation of drones that monitor fine dust and drones that reduce fine dust in order to reduce fine dust generated in construction sites.

  • PDF