• Title/Summary/Keyword: construction management techniques

Search Result 492, Processing Time 0.029 seconds

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

A Study on Strategies of Smart Green City - The Priority Analysis and Application of Planning Technique -

  • Lee, Seo-Jeong;Oh, Deog-Seong
    • KIEAE Journal
    • /
    • v.15 no.2
    • /
    • pp.5-17
    • /
    • 2015
  • Purpose: The goal of this research is to identify the planning techniques of Smart Green City with Ubiquitous method and carbon-neutral city planning techniques and to induce the main planning techniques through the analysis of relative importance and practical adaptation. Method: First of all, eighteen planning techniques were derived and categorized into three organization systems and six sectors through literature review and FGI analysis considering the applicability of Ubiquitous service for carbon-neutral city planning techniques. Secondly, based on expert surveys and AHP analysis, the importance of Smart Green City planning techniques was evaluated. Thirdly, using case study, six cases related to Smart Green City were analyzed for the current status of application of planning techniques. Lastly, considering the importance of planning techniques and practical aspects, the characteristics of Smart Green City and its implication were estimated. Result: Energy, Resource and Waste and Transportation sector were identified as important sectors for Smart Green City. In addition, 'Construction of Smart Grid', 'System for Utilization of New & Renewable Energy', 'Smart Resource Circulation Management System', 'Establishment of Public Transportation Information System basis', 'Construction of Pedestrian / Bicycle oriented Road Environment' are essential planning techniques to create Smart Green City.

Comparison of the Performance of Clustering Analysis using Data Reduction Techniques to Identify Energy Use Patterns

  • Song, Kwonsik;Park, Moonseo;Lee, Hyun-Soo;Ahn, Joseph
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.559-563
    • /
    • 2015
  • Identification of energy use patterns in buildings has a great opportunity for energy saving. To find what energy use patterns exist, clustering analysis has been commonly used such as K-means and hierarchical clustering method. In case of high dimensional data such as energy use time-series, data reduction should be considered to avoid the curse of dimensionality. Principle Component Analysis, Autocorrelation Function, Discrete Fourier Transform and Discrete Wavelet Transform have been widely used to map the original data into the lower dimensional spaces. However, there still remains an ongoing issue since the performance of clustering analysis is dependent on data type, purpose and application. Therefore, we need to understand which data reduction techniques are suitable for energy use management. This research aims find the best clustering method using energy use data obtained from Seoul National University campus. The results of this research show that most experiments with data reduction techniques have a better performance. Also, the results obtained helps facility managers optimally control energy systems such as HVAC to reduce energy use in buildings.

  • PDF

Development of the Construction Waste Management Performance Evaluation Tool (WMPET): Quantification of Waste Management Performance Factors and Establishment of Waste Management Performance Evaluation Tool (건설현장의 폐기물 관리 성과 평가 툴 개발 : 2단계 - 폐기물 관리 성과 요인의 전량화 및 평가 툴 구축)

  • Kim, Jee-Hye;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.128-136
    • /
    • 2007
  • As the international-level concern has been focused on the environmental sustainability in recent years, many researches emphasized the needs for methods and techniques that would facilitate sustainability assessment at the various project level interfaces. As part of methods and techniques to facilitate sustainability assessment, this paper provides 'Computerized Waste Management Performance Evaluation Tool' for the purpose of assessing the level of management system in dealing with the onsite construction wastes. This tool applies twenty-three waste management performance factors for the purpose of evaluating the level of waste management performance by scoring those factors which were identified in the previous research. These twenty-three factors are classified into four categories: manpower, material, method, and management based on their characteristics. In order to quantitatively evaluate the effectiveness of waste management performance, the levels of actions executed in a site by each waste management performance factor were identified and their weight were analyzed throughout the expert interview and survey. Furthermore, an excel-based computerized tool was developed in order to facilitate the evaluation process. If this tool can be developed in more detail and be used as the method to control waste management at a project level for the future, it is expected that this tool can play an important role in the body of knowledge of environmental management in construction industry.

Analysis of Prevention Methods by Type of Construction Disaster Using Text Mining Techniques (텍스트마이닝을 활용한 건설현장 재해 유형별 예방 대책 분석)

  • Gyu Pil Jo;Myungdo Lee;Yoon-seok Shin;Baek-Joong Kim
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.13-19
    • /
    • 2024
  • Purpose: This study provides prevention methods by type of construction disaster using text mining techniques. Method: Based on the database that analyzed the cases of critical disasters in the domestic construction sector, preventive measures and causes are analyzed by text mining techniques, and the contents of the analysis are visually shown. Result: This visual data represents the measures for preventing critical disasters of each process according to the importance. Conclusion: It is believed that the results will be helpful in identifying factors to be considered in preparing preventive measures for serious accidents in construction.

An Application for Tracking the Location of Material using RFID and Wireless Network Technology (RFID와 무선네트워크 기술을 이용한 자재위치파악 방안)

  • Lee, Nam-Su;Song, Jae-Hong;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.523-528
    • /
    • 2006
  • The management of construction materials is one of the important administration factor to perform construction projects. If it is not flexible to supply necessary materials to a workplace at a proper time, some problems such as a construction cost increase, an operation delay, a lowering of work efficiency and etc. could occur during the progress of work. Therefore, tracking the precise location of materials is important and necessary to input materials in the accurate place. Although Location sensing techniques comprise GPS, Active Badge, EasyLing and so forth, there are technical limitations to apply these techniques on construction site. Accordingly, in this paper, we propose the technically feasible method to automatically locate materials on site using recent RFID and wireless network technologies.

  • PDF

A CP-BASED OPTIMIZATION MODEL FOR CONSTRUCTION RESCHEDULING PROBLEMS

  • Shu-Shun Liu;Kuo-Chuan Shih
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.941-946
    • /
    • 2005
  • It is essential for project managers to make schedule adjustment based on their professional experience, in terms of rescheduling action discussed in this paper. This paper discusses the topics of resource-constrained construction rescheduling by modifying the concepts of manufacturing rescheduling. Moreover, the influence factors of construction rescheduling problems are investigated and identified in this paper. According to initial schedule plan and present progress, a new rescheduling mechanism based on Constraint Programming (CP) techniques is developed to reschedule projects with the objective of minimizing total project cost or duration, under three rescheduling policies. Through case study, the behavior of three different rescheduling policies is analyzed and discussed in this paper.

  • PDF

AUTOMATED INTEGRATION OF CONSTRUCTION IMAGES IN MODEL BASED SYSTEMS

  • Ioannis K. Brilakis;Lucio Soibelman
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.503-508
    • /
    • 2005
  • In the modern, distributed and dynamic construction environment it is important to exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research has demonstrated that (i) a significant percentage of construction data is stored in semi-structured or unstructured data formats (ii) locating and identifying such data that are needed for the important decision making processes is a very hard and time-consuming task. In this paper, an automated methodology for the classification and retrieval of construction images in AEC/FM model based systems will be presented. Specifically, a combination of techniques from the areas of image processing, computer vision, and content-based image retrieval have been deployed to develop a method that can retrieve related construction site image data from components of a project model.

  • PDF

Statistical Analysis of Work Performance Indicator (작업 성과지표의 통계적 분석 방법에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.947-952
    • /
    • 2007
  • The construction project is composed of individual trade which is consists of each activity. and the performance of each activity is the lowest level to influence the project performance. Consequently, It is essential to measure and evaluate the performance of the each assignment. But the existing performance measurement have mainly focussed on company level and project level. Therefore, this paper select PPC as the indicator of a activity and, suggests the analysis method of indicators for a goal-oriented management and continuous improvement through a statistical control techniques.

  • PDF

Guideline for Web 2.0 Cluster based Process and Performance Management System (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 구축에 따른 운영방안 제시)

  • Ong, Ho-Kyoung;Ahn, Jae-Gyu;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.899-904
    • /
    • 2007
  • Process management techniques are highly important in the construction industry. However, indicators or details of assessment which will show process management and its performance are still very insufficient. In particular, it is true that local corporations or small and medium sized companies suffer more difficulties than ones in metropolitan areas. Therefore, it is necessary to prepare a flexible process management and performance assessment system suited to field situations. This study identified problems of local small and medium sized companies, implemented a process and performance management system using the Lean concept, and systemized a web-based system. Also, the study proposed operational strategies so that small and medium construction companies may access and use the system easily. This will ensure the competitiveness of local small and medium sized companies, will pursue visible outcomes such as construction period reduction and construction cost reduction, and will be utilized as data related to performance assessment both during construction progress and after construction.

  • PDF