• 제목/요약/키워드: construction management techniques

검색결과 492건 처리시간 0.032초

건설안전관리비 산정 프로그램 개발 (Program development for composition of construction safety management expenses)

  • 홍성만;이정기;박범
    • 대한안전경영과학회지
    • /
    • 제4권2호
    • /
    • pp.23-32
    • /
    • 2002
  • The small-and-medium sized construction sites are in weak state of safety management because of the variable working environments, the lack of safety techniques and the weak economic conditions, and industrial accidents of these sites were occupied 60% of the total construction accidents. Recently, the safety engineer's number are not to be enough at the small-and-medium sized construction sites. Therefore, the safety engineer's works are addition to more and more. This paper is a development of the integrated program which using composition of construction safety management expenses. It is an management tool which helps to saving time of construction safety engineer. A method of development composition, to used Brain Storming for a place of meeting to construction safety management counselors.

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

A Study of Landscape Management Techniques based on Viewing Characteristics of Mountain Landscape - Focused on the Surrounding Areas of Bukhansan Mountain -

  • Park, Moon-Ho
    • 한국조경학회지
    • /
    • 제38권5_2호
    • /
    • pp.163-175
    • /
    • 2010
  • This study is based on the viewing characteristics of mountain landscapes. It investigates whether the current landscape management-related regulations are efficient in terms of the viewing characteristics of the mountain landscape against Bukhansan Mountain in which the conventional landscape management techniques were used. In addition, some viewing characteristics of mountain landscapes, such as distance from the view point to the target mountain, angle of elevation, altitude, gradient, have been analyzed and 3 cases of viewing condition have been simulated. The following results were obtained: i) Mountain landscapes can be managed up to 7~8 times of the mountain height with a $5{\sim}9^{\circ}$ of elevation angle. ii) In the Natural Landscape District which is situated on the hillside, it is reasonable to include altitude, gradient as criteria for regulation. iii) According to a simulation of the construction permit height by viewing distance, it was confirmed that buildings can be constructed up to 111.55m when viewing the 20% ridge, 150.75m when viewing the 50% ridge and 189.05m when viewing the 70% ridge. iv) The construction permit height varies depending on the landscape analysis method that is used and the application conditions. It is therefore unfair to apply height limit regulations to all buildings without considering the geographical features or viewing characteristics. v) It is unreasonable to apply 2~3 management techniques to the same area for landscape management. Therefore, we recommend the Focused Landscape Management Area based on the landscape master plan as a integrating mountain landscape management techniques.

DETAILS OF PRACTICAL IMPLEMENTATION OF REAL-TIME 3D TERRAIN MODELING

  • Young Suk Kim;Seungwoo Han;Hyun-Seok Yoo;Heung-Soon Lim;Jeong-Hoon Lee;Kyung-Seok Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.487-492
    • /
    • 2009
  • A large-scaled research project titled "Intelligent Excavating System (IES)" sponsored by Korean government has launched in 2006. An issue of real-time 3D terrain modeling has become a crucial point for successful implementation of IES due to many application limitations of state-of-the-art techniques developed in various high-technology fields. Many feasible technologies such as laser scanning, structured lighting and so on were widely reviewed by professionals and researchers for one year. Various efforts such as literature reviews, interviews, and indoor experiments make us select a structural light technique and stereo vision technique as appropriate techniques for accomplishment of real-time 3D terrain modeling. It, however, revealed that off-the-shelf products of structural light and stereo-vision technique had many technical problems which should be resolved for practical applications in IES. This study introduces diverse methods modifying off-the-shelf package of the structural light method, one of feasible techniques and eventually allowing this technique to be successfully utilized for achieving fundamental research goals. This study also presents many efforts to resolve practical difficulties of this technique considering basic characteristics of excavating operations and particular environment of construction sites. Findings showed in this study would be beneficial for other researchers to conduct new researches for application of vision techniques to construction fields by provision of detail issues about practical application and diverse practical methods as solutions overcoming these issues.

  • PDF

드론 및 비전 프로세싱 기술을 활용한 디지털 건설현장 관리에 대한 연구 (Research on Digital Construction Site Management Using Drone and Vision Processing Technology)

  • 서민조;박경규;이승빈;김시욱;최원준;김치경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.239-240
    • /
    • 2023
  • Construction site management involves overseeing tasks from the construction phase to the maintenance stage, and digitalization of construction sites is necessary for digital construction site management. In this study, we aim to conduct research on object recognition at construction sites using drones. Images of construction sites captured by drones are reconstructed into BIM (Building Information Modeling) models, and objects are recognized after partially rendering the models using artificial intelligence. For the photorealistic rendering of the BIM models, both traditional filtering techniques and the generative adversarial network (GAN) model were used, while the YOLO (You Only Look Once) model was employed for object recognition. This study is expected to provide insights into the research direction of digital construction site management and help assess the potential and future value of introducing artificial intelligence in the construction industry.

  • PDF

건설공사 자재 관리를 위한 데이터 웨어하우스 개발 (Development of Data Warehouse for Construction Material Management)

  • 류한국
    • 한국건축시공학회지
    • /
    • 제11권3호
    • /
    • pp.319-325
    • /
    • 2011
  • 건설공사는 수많은 자원 중 상당부분이 자재공급업체에서 제공하는 자재의 원활한 공급에 따라 작업의 원활성이 결정된다. 자재를 적기에 조달하고 배분하는 결과에 따라 작업이 순조롭게 진행되고 궁극적으로 소기의 공사기간 내에 공사를 완료할 수 있다. 본 연구는 데이터 웨어하우스 기술을 활용하여 건설공사에서 중요한 자재관리에 활용할 수 있는 방법을 제시하였다. 건설공사의 자재관리를 위해 필요한 자재리드타임, 자재조달비율, 자재설치비율 등에 대한 정보를 다차원적으로 분석하고 KPI를 설정하여 의사결정 정보로 활용할 수 있도록 하였다. 궁극적으로 본 연구는 건설공사의 운영계 시스템에서 발생하는 수많은 자재관련 데이터들을 효과적으로 활용하는 방법을 제시하였다. 즉, 주제 중심적이고 통합적인 데이터를 제공할 수 있는 데이터 웨어하우스 기술을 활용하여 체계적인 자재관리 정보를 제공할 수 있도록 하였다.

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Safety Management System Prototype Based on BIM with RTLS

  • Kwang-pyo Lee;Hyunsoo Lee;Moonseo Park ;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.890-896
    • /
    • 2009
  • In past projects, the main goal has been to enhance efficiency by reducing cost and time. However, considering the current condition of safety management in many construction companies, it can be confirmed that safety management has not been a top priority for a long time. Current safety management, which is based on safety standards and rules, is very ineffective and only emphasizes management after an incident. As well, although fewer accidents occur compared to the past, because construction projects are increasingly large in scale and complex, these accidents tend to be more serious and involve greater monetary loss. Furthermore, as the severity of these accidents increases, so does the possibility of fatalities. Therefore, improving safety management is essential. This study proposes an effective program for safety management, focusing on the processes to connect studies and systems, and the basic techniques required for program development. To realize this program, technical tools are suggested, including systems such as BIM (Building Information Modeling); additionally, the coordination of other systems such as an RTLS, a server, and an alarm system is proposed.

  • PDF

VE 사례분석을 통한 교육시설 건축공사 단계별 관리방안 (Management Method in the Education Facilities of the Construction Process through Value Engineering(VE) Case Study)

  • 김학주;문광배;고성석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.129-132
    • /
    • 2012
  • Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.

  • PDF

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF